1.

IDENTIFY ROLES
2. ARCHITECTS OFFICE –ARCOP ASSOCIATES PVT. LTD.
3. PROJECT OWNER – APCRDA
4. FUNDING – FINANCIAL MINISTER, AP GOVT
5. PROJECT MEETING
6. PROJECT SIGN OFF
7. SITE STUDY

8. PROCUREMENT
CONSULTANTS

STAKE HOLDERS
Engineers dept
1.architect
2. civil engineer
3. electrical engineer
4. structural engineer
5. landscape designer
6. interior designer
7. plumbing engineer
8. road work engineer
9. waterproofing engineer
10. graphic designers

CONTRACTORS
GENERAL CONTRACTORS
BUILDING CONTRACTORS
LEGAL DEP
1. LEGAL ADVISER
2. ADVACATES
3. LEGAL ASSISTANTS
MACHINERY
PURCHASE DEPT

FINANCE DEPT
1. ADVISER
2. MANAGER
3. ASSISTANT

PERSONAL AND ADMINSTRATIVE DEPARTMENT


1. PERSONAL MANAGER
2. ASSISTANT MANAGER

MARKETING AND SALES DEPT


1. MARKETING MANAGER
2. SALES MANAGER
3. SALES EXECUTIVE

ACCOUNTS DEPT
1. CHEIF ACCOUNTANT
2. ACCOUNTS MANAGER
3. SENIOR ACCOUNTANT
4. JUNIOR ACCOUNTANT
5. CASHIER
6. CLERK

Quality & control department


Maintenance department

CARPENTERS
PLUMBERS
CONSTRUCTION MATERIALS DEVELOPERS
MANUFACTURES
STOCKING DEPT
TRANSPORTATION AND TRADING FIRMS
DISTRIBUTORS
REPAIR AND MAINTANANCE DEPT

Construction man power requirement

9. PHASES
10. MILESTONES
11. ACTIVITIES

1. PHASES
1.1 pre design
1.2 design
1.3 pre construction
1.4 construction
1.5 post construction

1.1 PRE DESIGN


1.1.1 project meeting
1.1.2 User needs
1.1.3 Construction cost analysis
1.1.4 Making of partners
1.1.5 Choosing technology and construction
1.1.6 Defining work tasks
1.1.7 Project scope
1.1.8 concepts
1.1.9 schematics sketches
1.1.10 master plans
1.1.11 requirements
1.1.12 preliminary plans

1.2 DESIGN
1.2.1 Site marking
1.2.2 Site plan
1.2.3 Architectural drawings
1.2.4 Structural drawings
1.2.5 Mechanical drawings
1.2.6 Working drawings
1.2.7 Project budget and estimation

1.3 Pre construction


1.3.1 Site preparation
1.3.2 Review of existing structures around the site
1.3.3 Purchasing materials
1.3.4 Quality test
1.3.5 Project tender
1.3.6

1.4 CONSTRUCTION

1.4.1 Cleaning and clearing


1.4.2 Surveying
1.4.3 Levelling
1.4.4 Site boundary marking
1.4.5 Planning for approach roads and temporary structures
1.4.6 Watchman cabin
1.4.7 Site office / store
1.4.8 Water arrangement
1.4.9 Electricity arrangement
1.4.10 Compound wall or fencing
1.4.11 Gate
1.4.12 Temporary water storage tank
1.4.13 Cement good downs
1.4.14 Watch tower
1.4.15 Excavation ( chiselling,blasting)
1.4.16 Dewatering
1.4.17 framework
1.4.18 Laying pile Foundation
1.4.19 Laying pcc
1.4.20 Laying raft foundation
1.4.21 Casting and checking of shear walls , columns and pillars
1.4.22 Plinth work
1.4.23 Casting and checking of plinth beams
 Refilling of plinth and footing
 Filling and compaction
1.4.24 Dpc over plinth wall
1.4.25 Rcc work
 Shear walls, columns , pillars
 Beams
 Slabs
1.4.26 Lifts (temporary )
1.4.27 Brick work
1.4.28 Stair case
1.4.29 Masonry and door windows frame fixing
1.4.30 Plastering ( internal&external)
1.4.31 Water proofing , damp proofing and termite proofing
1.4.32 Plumbing and sanitary work
1.4.33 flooring and claddings
1.4.34 door shutters and window fixing
1.4.35 Electrical work
1.4.36 Glass fixing
1.4.37 Ceiling
1.4.38 Painting
1.4.39 Furniture
1.4.40 Elevator work
1.4.41 Fire fighting systems
1.4.42 Road works
1.4.43 Development work
 Compound wall
 Retaining wall
 Garden wall
 Road work
 Lt room
 Under ground water tank (U.G.W.T)
 Parking flooring
 Parking allotment
 Washing place and common toilet
 Society office
 Parking lights
 Street lights
 Compound wall lights
 Main gate lights
 Gardening and tree plantation

1.4.44 Extra amenities


1.4.45 Repairs and maintenance

1.5 POST CONSTRUCTION

1.5.1 Building approvals


1.5.2 cleaning of site
1.5.3 clearing of site
1.5.4 clearing of machinery and equipment
1.5.5 hand over
1.5.6 Repairs and maintenance (Facilities Management)
1.5.7
1.6 CONSTRUCTION

1.6.1 Cleaning and clearing


 Cutting unwanted trees (6 days )
 Undulations should be levelled ( 2 days )
 Erection of temporary sheds using GI sheets for storing and staking
at every block ( 6 days )
1.6.2 Surveying ( 2 days )
1.6.3 Site boundary marking
 Fixing and painting stones at corners of the site ( 1 day )
 Preparing rough sketch of fixed boundaries ( 1 day )
 Surveying to mark the boundaries ( 1 day)
1.6.4 Planning for approach roads and temporary structures
 Marking for approach roads with lime powder and guard stone
(1day)
 Marking internal roads with lime powder and steel rods ( 1 day )
 Laying roads with gravel. ( 2 days )
 Provision of Hoarding and guiding boards (1 day)
1.6.5 Watchman cabin ( 1 day )
1.6.6 Site office / store ( 7 days )
1.6.7 Water arrangement
 Laying water line from municipal corporation ( 1 day )
 Geological survey for bore wells ( 2 days )
 Digging bore wells ( 3 days )
 Placing central water storage tank
 Temporary pump installation ( 1 day )
 Placing extra pump
1.6.8 Electricity arrangement
1.6.8.1 Providing single phase meter ( 1 day)
1.6.8.2 Providing 3 phase meter ( 1 day )
1.6.8.3 Providing temporary street lights , site offices , watchmans cabin ( 3
days )
1.6.8.4 Documentation work and approvals from electric board ( 1 day )
1.6.8.5 Study of location at electric supply point ( 2 days )
1.6.9 Compound wall or fencing
1.6.9.1 compound and gate drawings preparation by architects
1.6.9.2 temporary MS angle fencing
1.6.10 Gate
1.6.10.1 providing check points
1.6.10.2 tree plantation around fencing
1.6.11 Temporary water storage tank
1.6.11.1 placing tank
1.6.12 Cement godowns ( temporary GI sheet structure )
1.6.12.1 flooring for cement godown with IPS floor furnishing
1.6.12.2 water proofing
1.6.13 Watch tower
1.6.13.1 placing poles
1.6.13.2 placing lader
1.6.13.3 construction of wall tower
1.6.13.4 fixing flood lights
1.6.14 Excavation ( chiselling,blasting)
1.6.14.1
1.6.15 Dewatering
1.6.16 framework
1.6.17 Laying pile Foundation
1.6.18 Laying pcc
1.6.19 Laying raft foundation
1.6.20 Casting and checking of shear walls , columns and pillars
1.6.21 Plinth work
1.6.22 Casting and checking of plinth beams
 Refilling of plinth and footing
 Filling and compaction
1.6.23 Dpc over plinth wall
1.6.24 Rcc work
 Shear walls, columns , pillars
 Beams
 Slabs
1.6.25 Lifts (temporary )
1.6.26 Brick work
1.6.27 Stair case
1.6.28 Masonry and door windows frame fixing
1.6.29 Plastering ( internal&external)
1.6.30 Water proofing , damp proofing and termite proofing
1.6.31 Plumbing and sanitary work
1.6.32 flooring and claddings
1.6.33 door shutters and window fixing
1.6.34 Electrical work
1.6.35 Glass fixing
1.6.36 Ceiling
1.6.37 Painting
1.6.38 Furniture
1.6.39 Elevator work
1.6.40 Fire fighting systems
1.6.41 Road works
1.6.42 Development work
 Compound wall
 Retaining wall
 Garden wall
 Road work
 Lt room
 Under ground water tank (U.G.W.T)
 Parking flooring
 Parking allotment
 Washing place and common toilet
 Society office
 Parking lights
 Street lights
 Compound wall lights
 Main gate lights
 Gardening and tree plantation
1.6.43 Extra amenities
1.6.44 Repairs and maintenance