--------------------------------------------------PLANNING & COST CONTROL


ENGINEER---------------------------------------------------

Actual Position : Sr Project Planning Engineer


Nationality : Algerian
University Degree : 2002 – 2007 Degree in Civil Engineering at Algerian university
Languages : Arabic - French - English
Date of Birth : March 7, 1983
Status : Married
Home address : Cité des frères Bouhadja Bt° 88 N° 10 SKIKDA 21000
Telephone Number : 00 213 5 57 21 25 05 (mobile)
: 00 213 6 61 70 13 72 (mobile)
Email Adresse : karim.saadi@yahoo.com
ka.saadi@yahoo.fr

----------------------------------------------------Training & Certificate


-----------------------------------------------------

2004_ AutoCAD 2D Practical certificate.


2005_ One-month training course at SONATRACH Drilling Company (Exploration Division)
2006_ Microsoft Word/Excel/PowerPoint/Access.
2007_ Primavera P3 Practical Certificate.
2010_ Primavera P6V07/MS Project Practical Certificate.
2017_ Primavera P6V16.1 Practical Certificate.
---------------------------------------------------------
Summary------------------------------------------------------------------
I am geotechnical Engineer; I’ve had an extensive experience in Planning management and Contract, Cost, Quantity
Controller in various disciplines viz civil, mechanical & piping, electrical, instrumentation across my projects career and I
am seeking for the new challenges.
---------------------------------------------------------Skill History--------------------------------------------------------------
2017 at present_ SONATRACH Employer in South Algeria (Oil & Gas )
MEP Project Planning Engineer with Main Contractor CPECC Eng & Const Corp
GPL Pumping plant EPC Project (R-OB1 Haoud Elhamra)
English communication language
EPC Project Planning Establishing at level 04 , Monthly and Weekly update of the planning, Rescheduling the
construction part to monitoring the critical path using primavera P6V16.1, Monthly and weekly Progress reporting,
Approved the monthly progress with the client.

2013 at 2017 SONATRACH Employer in South Algeria (Oil & Gas )


MEP Planning and Cost Control with Main Contractor ABB Italy
GPL Pumping plant EPC Project (ELR1 Haoud Elhamra)
English communication language

Project Presentation for the various sub-contractor scope of works, Prepare and update the Construction
planning/scheduling Level 04 as well (CPM) using primavera P6V7 and tracking the progress and forecasting in
according to the Engineering and procurement report, Prepare and monitoring the PMS (progress measurement
system), Weekly progress reporting, Weekly meeting with the Sub-Contractor and the client, Control the cost progress
of the sub-contractors and invoicing with the client.

2012 to 2013_ LAFARGE Employer in M’sila Algeria (Cement plant )


MEP Planning & Cost Control with Sub-contractor Entrepose-Algerie
Cement plant Extension Project.
French communication language

Familiar with the employer on the extension scope of works, Prepare and update the Construction planning/scheduling
Level 03 and 04 as well as (CPM) using primavera P6V7 and tracking the progress and weekly planning forecasting in
according to the available materials at site, Issue the S curve from primavera P6V7, Prepare and monitoring the PMS
(progress measurement system), Daily and weekly progress reporting, Cost controlling, Weekly meeting with the
employer, Invoicing with the client.
2011 to 2012_ ConocoPhillips Employer in South Algeria (Oil & Gas )
MEP Planning & Scheduler with Main Contractor Entrepose- Algerie
CPF Shutdowns & turnaround outage Project.
English communication language

Familiar of the scope of works and designate the necessaries resources for the each discipline and post system,
Prepare and update the Construction CPM project planning and tracking the progress, Weekly planning forecasting in
according to the available materials at site, Issue the Cash flow and resources histogram from primavera P6V7,
Claiming the new cost estimation, Recording and approve the time sheet with the client, Daily progress reporting.

2010 to 2011_ ConocoPhillips Employer in South Algeria (Oil & Gas )


MEP Planning & Cost Control with Main Contractor Entrepose- Algerie
CPF Wellhead and Gathering pipe line Construction Project.
English communication language

Familiar with the employer on the extension scope of works, Prepare and update the Construction planning/scheduling
Level 03 and 04 as well as (CPM) using primavera P6V7 and track the progress, Weekly planning forecasting in
according to the available materials at site, Issue the resources histogram from primavera P3, Prepare and monitoring
the PMS (progress measurement system), Daily and weekly progress reporting, Weekly meeting with the employer,
Invoicing with the client.

2008 to 2010_ DPN Algerian Employer – SKIKDA (Highway )


Civil Planning Engineer with Main Contractor TAISEI Corporation
Tunnel Construction Project
French communication language

Prepare and update the Construction planning/scheduling Level 04 as well as (CPM) using MS project and tracking the
progress, Weekly planning forecasting in according to the available materials at site, Prepare and monitoring the PMS
(progress measurement system), Weekly progress reporting, Weekly meeting with the employer, Invoicing with the
client.

2007 to 2008_ LAVALIN Main Contractor – TIPAZA (Energy & Power )


Civil Planning Engineer with Sub-contractor YOUKAIS Grand Travaux Industrielles
Electrical Power plant Project (Civil scope of work)
English communication language

Prepare and update the Construction planning/scheduling Level 04 as well as (CPM) using primavera P3 and tracking
the progress, Prepare and monitoring the PMS (progress measurement system), Daily and weekly progress reporting,
weekly meeting with the main contractor, Invoicing with the client.