AWARDED GEOTHERMAL PROJECTS as of December 31, 2016

TOTAL
POTENTIAL
ISLAND / INSTALLED
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY
GRID CAPACITY
(MW)
(MW)
Sal-lapadan-Boliney-Bucloc- compliant with the approved WP, RESHERR and
LUZON CAR Abra Tubo Geothermal Power Pan Pacific Power Phils. Corp. reportorial obligations; posting of PB is subject to 0.00 0.00
Project the approval of 1-yr contract term extension
Clean Rock Renewable Energy non-compliant with the approved WP, RESHERR and
Benguet / Nueva Ecija Daklan Geothermal Project 60.00 0.00
Resources Corporation posting of PB
Aragorn Power and Energy compliant with the approved WP, posting of PB and
Kalinga Kalinga Geothermal Project 120.00 0.00
Corporation with RESHERR
Ifugao, Benguet, East Mankayan Geothermal non- compliant with the approved WP, posting of PB
Basic Energy Corp. 0.00 0.00
Mountain Province Power Project and RESHERR
Ilocos Sur / Mt. Cervantes Geothermal compliant with the approved WP, posting of PB and
I Pan Pacific Power Phils. Corp. 0.00 0.00
Province / Benguet Power Project RESHERR
compliant with the approved WP, RESHERR and
Cagua-Baua Geothermal
II Cagayan Pan Pacific Power Phils. Corp. reportorial obligations; posting of PB is subject to 45.00 0.00
Power Project
the approval of 1-yr contract term extension
Mariveles Geothermal non- compliant with the approved WP, posting of PB
III Bataan Basic Energy Corp. 0.00 0.00
Power Project and RESHERR
Mt. Natib Geothermal Clean Rock Renewable Energy non-compliant with the approved WP, RESHERR and
40.00 0.00
Project Resources Corporation posting of PB
Negron-Cuadrado Negron Cuadrado Geothermal compliant with the approved WP, posting of PB and
Zambales, Pampanga 0.00 0.00
Geothermal Power Project Inc. RESHERR
San Juan Geothermal Power San Juan Geothermal Power compliant with the approved WP, posting of PB and
IV-A Batangas 20.00 0.00
Project Inc. RESHERR
compliant with the approved WP and non-
submission of reportorial obligations (2015 Annual
Maibarara Geothermal
Batangas / Laguna Maibarara Geothermal Inc. Progress Report, Monthly Production & Injection 0.00 20.00
Project
Report and Well Inventory); compliant with
RESHERR
Mak-Ban Geothermal Power
AP Renewables, Inc. compliant with the approved WP and with RESHERR 0.00 458.53
Plant
compliant with the approved WP and with RESHERR
Makban Geothermal Power Philippine Geothermal
Laguna/Batangas but late submission of reportorial obligations (well 0.00 0.00
Project Production Company, Inc.
inventory)
AWARDED GEOTHERMAL PROJECTS as of December 31, 2016
TOTAL
POTENTIAL
ISLAND / INSTALLED
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY
GRID CAPACITY
(MW)
(MW)
Laguna / Quezon / Tiaong Geothermal Power Tiaong Geothermal Power compliant with the approved WP, posting of PB and
LUZON IV-A 0.00 0.00
Batangas Project Corp. RESHERR
compliant with the approved WP but non-compliant
Mt. Puting Lupa Geothermal
Laguna Filtech Energy Drilling Corp. with RESHERR, posting of PB is subject to the 2nd 0.00 0.00
Project
year milestone evaluation
Talim Geothermal Power compliant with posting of PB ,approved WP and
Rizal Alco Steam Energy Corp. 0.00 0.00
Project RESHERR
Tayabas - Lucban Tayabas Geothermal Power compliant with the approved WP, posting of PB and
Quezon / Laguna 0.00 0.00
Geothermal Power Project Inc. RESHERR
Montelago Geothermal Mindoro Geothermal Power
IV-B Oriental Mindoro compliant with the approved WP and RESHERR; 40.00 0.00
Project Corp.
Tiwi Geothermal Power
V Albay AP Renewables, Inc. compliant with the approved WP and with RESHERR 0.00 234.00
Plant
compliant with the approved WP and with RESHERR
Tiwi Geothermal Power Philippine Geothermal
but no submission of reportorial obligations (well 0.00 0.00
Project Production Company, Inc.
inventory)
Quezon / Camarines Mt. Labo Geothermal Energy Development
with pending approval for the surrender of GSC 65.00 0.00
Norte & Sur Project Corporation
Southern Bicol Geothermal
Sorsogon SKI Construction Group Inc. 40.00 0.00
Project
West Bulusan Geothermal
Basic Energy Corp. non-compliant with the approved WP and RESHERR. 0.00 0.00
Power Project
compliant with the approved WP but late
Bacon-Manito Geothermal Energy Development submission of reportorial obligations (Drilling
Sorsogon / Albay 0.00 0.00
Production Field Corporation Completion and Well Testing Completion Reports);
and compliant with RESHERR
Bacon Manito Geothermal
Bac-man Geothermal Inc. compliant with the approved WP and RESHERR 0.00 140.00
Power Plant
Iriga Geothermal Power non- compliant with the approved WP, posting of PB
Camarines Sur, Albay DESCO, Inc. 0.00 0.00
Project and RESHERR
LUZON Sum 430.00 852.53
AWARDED GEOTHERMAL PROJECTS as of December 31, 2016
TOTAL
POTENTIAL
ISLAND / INSTALLED
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY
GRID CAPACITY
(MW)
(MW)
Northern Negros
Energy Development compliant with RESHERR but non-compliant with the
VISAYAS VI Negros Occidental Geothermal Production 0.00 0.00
Corporation approved WP and submission of Well Inventory.
Field

Mandalagan Geothermal Energy Development compliant with the approved WP, posting of PB and
20.00 0.00
Prospect Corporation with RESHERR

compliant with the approved WP but late


Southern Negros
Energy Development submission of reportorial obligations (Drilling
VII Negros Oriental Geothermal Production 0.00 30.00
Corporation completion report, Well Testing Completion Report
Field
and Well inventory); and compliant with RESHERR

Palinpinon Geothermal
Green Core Geothermal Inc. compliant with the approved WP and RESHERR 0.00 192.50
Power Plants
non-compliant with the approved WP and non-
Biliran Geothermal submission of reportorial obligations (2015 Annual
VIII Biliran Biliran Geothermal Project 50.00 0.00
Incorporated Progress Report and Quarterly Progress Report); and
compliant with RESHERR
Tongonan 1 Geothermal
Leyte Green Core Geothermal Inc. compliant with the approved WP and RESHERR 0.00 112.50
Power Plants
compliant with the approved WP but late
Tongonan Geothermal Energy Development submission of reportorial obligations (Drilling
0.00 610.18
Production Field Corporation completion report, Well Testing Completion Report
and Well inventory); and compliant with RESHERR

Southern Leyte Geothermal Repower Energy


VIII Southern Leyte Newly awarded GSC under OCSP 34.00 0.00
Power Project Development Corporation
VISAYAS Sum 104.00 945.18
AWARDED GEOTHERMAL PROJECTS as of December 31, 2016
TOTAL
POTENTIAL
ISLAND / INSTALLED
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY
GRID CAPACITY
(MW)
(MW)

Zamboanga del Sur /


Lakewood Geothermal Energy Development compliant with the approved WP, posting of PB and
MINDANAO IX Zamboanga del Norte 40.00 0.00
Prospect Corporation with RESHERR
/ Zamboanga Sibugay

Misamis Occidental /
Ampiro Geothermal Power Energy Development compliant with the approved WP and RESHERR; non-
IX / X Zamboanga del Norte 30.00 0.00
Project Corporation compliant with the posting of PB
/ Zamboanga del Sur
Misamis Oriental / Balatukan-Balingasag Energy Development
X pending approval of Force Majeure application 20.00 0.00
Bukidnon Geothermal Prospect Corporation
compliant with the approved WP but late
North Cotabato / Mt. Apo Geothermal Energy Development submission of reportorial obligations (Drilling
0.00 108.48
Davao del Sur Production Field Corporation Completion and Well Testing Completion Reports);
and compliant with RESHERR

Mt. Sibulan-Kapatagan compliant with RESHERR and PB ; non-compliant


XI Davao del Sur Mount Apo Geopower, Inc. 0.00 0.00
Geothermal Power Project with the approved WP,
Amacan Geothermal Power Energy Development
Compostella Valley Newly awarded GSC under OCSP 40.00
Project Corporation
North Cotabato / Mt. Zion Geothermal Power Energy Development compliant with the approved WP, posting of PB and
XI / XII 20.00 0.00
Davao del Sur Project Corporation with RESHERR
Mt. Zion 2 Geothermal Energy Development compliant with the approved WP, posting of PB is
0.00 0.00
Power Project Corporation subject to the 1st year milestone evaluation

North Cotabato and Mt. Talomo-Tico compliant with RESHERR and PB; non-compliant
Mount Apo Geopower, Inc. 0.00 0.00
Davao del Sur Geothermal Power Project with the approved WP
MINDANAO Sum 150.00 108.48
Grand Total 684.00 1906.19