GUIDELINES FOR PREPARATION OF BA DRAWINGS 28 April 2007

AND TECHNICAL DOCUMENTS


Project Name :
Architect in-charge:

A DRAWINGS (typical to all sheets) CHECKED

1 AO size Matchline for connecting sheets (if plan can't fit in


13
2 Correct Client's Official Name one A0 size), should show sheet numbers.
3 Correct Project's Official Name 14 Drawing Title with scale
4 Correct Project's Address 15 Orientation
5 Correct and Filled-up Title Block
III ROOF PLAN
I SITE PLAN AND AREA CALCULATION 1 Minimum scale is 1/100
1 Site Plan 2 Gridlines for columns with dimensions
a Plot Plan 3 Roof Material
b Boundary Wall Layout, Material, Height 4 Complete dimensions
c Setback Line 5 Roof levels
d Covered Area 6 Slope direction and Ratio
e Road layout 7 Location of roof drains
f Parking Layout 8 Rainwater downpipe location & size
g Green Area (if required by law) Matchline for connecting sheets (if plan can't fit in
9
h Drainage Line one A0 size), should show sheet numbers.
ii Sewerage Line 10 Section Target Modules
j Water Supply Line 11 Elevation Target Modules
k Orientation 12 Drawing Title with scale
2 Area Calculaton Chart 13 Orientation
a All covered areas in one-line perimeter drawing
b Itemized calculation of all areas per building IV SECTIONS
3 Proposed Area Breakdown 1 Minimum scale is 1/100
Area of individual buildings should match with area 2 Cross Section
a
calculation chart 3 Longitudinal Section
4 Area Statement 4 Other sections (needed for multiple floor levels)
a Total Plot Area, should match with Plot Plan 5 Sections should cut into staircases, if any
b Permissible Covered Area as per Bye-law 6 Sections should match with floor plan section targets
c Permissible FAR as per Bye-law 7 Gridlines for columns with dimensions
d Setback should match with drawing 8 Ground Level
Proposed Covered Area, should match with 9 Plinth Level
e
Proposed Area Break up 10 Ceiling Level
Proposed Ground Coverage Percentage, should be 11 Terrace Level
f
equal or less than allowable maximum 12 Bottom of Truss Level
Proposed FAR, should be equal or less than 13 Apex of Roof Level
g
maximum and equal or more than minimum required 14 Roof slope ratio
5 Notes about the Industry 15 Section of type of foundation
Based on information and requirements issued by 16 Type of materials
a
Client Matchline for connecting sheets (if section can't fit in
17
one A0 size), should show sheet numbers.
II FLOOR PLAN 18 Drawing Title with scale
1 Minimum scale is 1/100
2 Gridlines for columns with dimensions V ELEVATIONS
3 Floor Level 1 Minimum scale is 1/100

Wall to wall dimensions for all partitions. Total width 2 Front, Rear, Left Side & Right Side Elevations
4 and length should match with Area Calculation Chart 3 Gridlines for columns with dimensions
of Sheet I 4 Ground Level
5 Room name with room size 5 Plinth Level
6 Modules for Door and Window Openings 6 Terrace Level
7 Dimensions for location of openings 7 Bottom of Truss Level
8 Stair width, Riser height, Tread width 8 Apex of Roof Level
9 Rainwater down pipe location & size 9 Roof slope ratio
10 Table for schedule of doors & windows 10 Wall Plane Level

Prepared by Dante Payawal 1/4 SMCC Construction India Limited


GUIDELINES FOR PREPARATION OF BA DRAWINGS 28 April 2007
AND TECHNICAL DOCUMENTS
11 Section Target Modules 11 Door openings
12 Elevation Target Modules 12 Window openings

V con't of ELEVATIONS
13 Exhaust openings
14 Canopies
15 Rainwater downpipe location & size
16 Wall Finishing Materials
Matchline for connecting sheets (if section can't fit in
17
one A0 size), should show sheet numbers.
18 Drawing Title with scale

VI FIRE PROTECTION SYSTEM


1 Site Plan CHECKED

a Site Plan-to use item I.1 with floor plans of item II.
b Fire Hydrant system layout on Site Plan
c Coverage area of Fire Hydrant
d Location of Fire Extinguishers
e Location of Fire Hose Reels
f Fire Sprinkler, if required
g Pipe Sizes
h Orientation
2 Typical Details
a Fire Hydrant mounting details
b Hose Reel elevation
c Cross section of pipe across trench
d Cross section of pipe across road crossing
e Detail of Valve Chamber
3 Tables for Schedules of System
a Material Specification
b Water Pump / Tank Schedule
c Schedule of Fire Extinguishers
d Schedule of Fire Hydrants
4 General Notes
5 Legends

B BLUEPRINTS
1 Number of sets
2 Cloth-mounted
3 Colouring
a Red colour for proposed areas
b Green for Water Supply system
c Red colour for Sewerage system
d Black colour for Drainage system
e Boundary wall
f Setback Line
4 Folding (Standard A4 size)
5 Architect's signature & stamp

C TECHNICAL DOCUMENTS
1 BR-1
2 BR-2
3 Structural Stability Certificate
4 Water Harvesting Certificate
5 Architect's Registration Certificate
6 Lists of Drawings

Prepared by Dante Payawal 2/4 SMCC Construction India Limited


GUIDELINES FOR PREPARATION OF BA DRAWINGS 28 April 2007
AND TECHNICAL DOCUMENTS

CHECKED

Prepared by Dante Payawal 3/4 SMCC Construction India Limited


GUIDELINES FOR PREPARATION OF BA DRAWINGS 28 April 2007
AND TECHNICAL DOCUMENTS

Prepared by Dante Payawal 4/4 SMCC Construction India Limited