Академический Документы
Профессиональный Документы
Культура Документы
Catalyst = AC 5% 1.25 g
Sun Drying= 1 hr
Alkali Solution = 5%
Vaccum Pressure = 300 mmHg
Running Time = 45 mins
R:C = 25,1.25 = 20,1
Raw = LDPE 100 g
Catalyst = AC 10 g
Sun Drying= 1 hr
Alkali Solution = 5%
Vaccum Pressure = 300 mmHg
Running Time = 90 mins
R:C = 100, 10 = 10, 1
Raw = LDPE+HDPE 200 g
Catalyst = AC 30 g
Sun Drying= 1 hr
Alkali Solution = 5%
Vaccum Pressure = 300 mmHg
Running Time = 2 hr
R:C = 200, 30 = 6.67, 1 100, 15
melting at 1 hr T= 145 C
Cracking at 80 mins T= 175 C
Stopping Time = 2 hr T= 160 C
Melting at 40 min T= 51
Cracking at 80 min T= 160-185***-209-220***-245
Stopping at 160 min T= 185
%Yield
Catalyst %Yield 40
10 80
20 60 20
30 56.5 0
40 44 0 10 20 30
Catalyst
Catalyst %Yield
10 64
20 74
30 74 Catalyst Vs
40 72.7 100
80
60
%Yield 40
20
Catalyst Vs Yield 0
5 10 15 20 25 30
100
80 Catalyst
60
%Yield
40 %Yield
20
0
0 10 20 30 40 50
Catalyst
Catalyst Vs Yield
%Yield
10 20 30 40 50
Catalyst
Catalyst Vs Yield
%Yield
15 20 25 30 35 40 45
Catalyst