SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.
3|Page
6 Put on the power supply to the local control panel and check
the indication bulbs are glowing.
Check the line up of the in line double filters provided in the
7 high pressure control system.
Charge the control fluid oil coolers from water side(CCCW
8 Pr.> 0.4MPa)
4|Page
OPERATING PROCEDURE -
Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 No PTW is pending. √ √ √ √
2 EH oil tank level is normal. √
3 Power supply module is ON. (TURBINE MCC). √ √ √
4 Keep pumps ON/ OFF selection in ON (i.e.) Remote. √ √
5 Pump suction valve is in open. √ √
6 CCCW pump is in service √ √
7 EH oil cooler, oil inlet valve is open. ( No valve in outlet ) √ √
8 EH oil cooler CW inlet, outlet valves are open. ( CCCW ) √ √
9 EH oil system CW main inlet, outlet valves are open. √ √
10 Recirculation filter inlet valve is open. ( No handle for this valve ) √ √
5|Page
START Permissive :
SHUTDOWN SEQUENCE:
1. PLANNED SHUTDOWN : (STOPPING OF EH Oil Pump)
1 Ensure that Main Turbine, BFP turbines are in stopped condition. √
6|Page
4 If oil temperature goes high, check the cooling water pressure should be √
normal(pr.>0.6MPa).Also
0.6MPa).Also check heater is cut off.
Emergency shutdown
3 Report to the shift in charge and work order raised for correcting the fault , √
put it into standby after correcting fault. √
ABRIVIATIONS / NOTATIONS
NOTATIONS:-
o SOP: Standard Operating
perating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control
ontrol System
o EE: Electrical Shift Engineer
Important Note:--
8|Page