PROJECT TITLE : LAND DEVELOPMENT PT. ALTRAK 1978 KARIANGAU


PROJECT OWNER : PT. ALTRAK 1978
CONSULTANT : PT. BITA
CONTRACTOR : PT. KARYA SEJATI PERDANA
DATE :

DAILY REPORT
Summary Description of Work Activities:

Material Installed per day: Weather:


Item Description Unit Qty General Rain Periods
Time Condition
Clear
Rainy

√ Workable X Unworkable

Contractor Resources on Site (Include Subcontractors): Major Equipment Used:


Classification Number Comments Equipment Hours Used
Project Mng
Site Mng
Supervisor
Foreman
Skilled Labor
Laborers
Others

Material Delivered to Site:


Type Qty Source Stockpile Comments

Unsafe Conditions Noted:


Description Action Taken

Delays or Potential Delays to the Works:


Description Action Taken by Contractor

General Comments:

PREPARED BY APPROVED BY
Contractor Consultant
PROJECT TITLE : LAND DEVELOPMENT PT. ALTRAK 1978 KARIANGAU
PROJECT OWNER : PT. ALTRAK 1978
CONSULTANT : MK PT. BITA
CONTRACTOR : PT. KARYA SEJATI PERDANA
DATE : 9-Aug-19
Reference : Benda Uji SNI 03-6369-2000
: Pengetesan ASTM C39 (SNI 03 1974 2011)

COMPRESSIVE STRENGTH

DI BUAT OLEH : DI PERIKSA OLEH :


PT. KARYA SEJATI PERDANA MK PT. BITA

ANG ERDDY USNA ZAENAL


PROJECT TITLE : LAND DEVELOPMENT PT. ALTRAK 1978 KARIANGAU
PROJECT OWNER : PT. ALTRAK 1978
CONSULTANT : MK PT. BITA
CONTRACTOR : PT. KARYA SEJATI PERDANA
DATE : 13/08/2019 (Umur Concrete 7 Hari)
Reference : Benda Uji SNI 03-6369-2000
: Pengetesan ASTM C39 (SNI 03 1974 2011)

COMPRESSIVE STRENGTH

DI BUAT OLEH : DI PERIKSA OLEH :


PT. KARYA SEJATI PERDANA MK PT. BITA

ANG ERDDY USNA ZAENAL


PROJECT TITLE : LAND DEVELOPMENT PT. ALTRAK 1978 KARIANGAU
PROJECT OWNER : PT. ALTRAK 1978
CONSULTANT : MK PT. BITA
CONTRACTOR : PT. KARYA SEJATI PERDANA
DATE : 03/09/2019 (Umur Concrete 28 Hari)
Reference : Benda Uji SNI 03-6369-2000
: Pengetesan ASTM C39 (SNI 03 1974 2011)

COMPRESSIVE STRENGTH

DI BUAT OLEH : DI PERIKSA OLEH :


PT. KARYA SEJATI PERDANA MK PT. BITA

ANG ERDDY USNA ZAENAL


PROJECT TITLE : LAND DEVELOPMENT PT. ALTRAK 1978 KARIANGAU
PROJECT OWNER : PT. ALTRAK 1978
CONSULTANT : MK PT. BITA
CONTRACTOR : PT. KARYA SEJATI PERDANA
DATE : 03/09/2019 (Umur Concrete 28 Hari)
Reference : Bata Ringan
:

COMPRESSIVE STRENGTH

DI BUAT OLEH : DI PERIKSA OLEH :


PT. KARYA SEJATI PERDANA MK PT. BITA

ANG ERDDY USNA ZAENAL