Вы находитесь на странице: 1из 3

Rate Analysis for finding out the final item Rates including loading, unloading for South Tripura

Dstrict and haulage.


Sl. No. Materials Source Lead in KM
1 StoneAggregate Belonia 20.00
2 Bitmen Emulsion /Bitumen (ss-1) Store Division, Agartala 100.00
3 Cement, all steel,paints Subdivisonal Head quarter 15.00
4 Fine SandSand atQuary 10.00
5 jhama Brick Aggrigates/Bricks at klin 20.00
Haulage
Qty of materials required Loading Unloading
Ref. Item Surface Road
No. of Rate Unit Particulars of Materials Final Rate
In Cum/ Co-efficient In MT /
SOR2011 Rate Amount Rate Amount KM rate Amount
Nos. of WT Cum
Flat Brick Soling
Chapter-4
Page 123 241.40 1 Sqm Bricks 1st class Nos. 31 0.0035 0.1085 0.0875 2.71 0.0875 2.71 20.00 2.50 5.43
TOTAL 2.71 2.71 5.43 252.25

WBM Grading - 3
Chapter-4 Jhama brick
Page 124 3647.40 1 Cum 1.45 1.45 2.103 51.60 74.82 25.80 37.41 20.00 2.50 105.13
Aggregate
TOTAL 74.82 37.41 105.13 3864.76

Tack Coat
Chapter-5
Page 127 10.40 1 sq.m Bitumen 0.0002 1 0.0002 76.40 0.02 70.30 0.01 100.0 2.50 0.05
TOTAL 0.02 0.01 0.05 10.48

20 mm Premix Carpet : (Mechanical)

191.40 1 sq.m Stone 1


Chapter-5 Aggregate 0.027 1.9 0.0513 51.60 1.39 25.00 0.68 20.00 2.50 2.57
Page 132
Bitumen 0.00146 1 0.00146 76.40 0.11 70.30 0.10 100.0 2.50 0.37
TOTAL 1.50 0.78 2.93 196.61

Seal coat (Fine Sand)


Chapter-5
42.70 1 sq.m sand 0.006 1.84 0.0110 25.80 0.15 16.00 0.10 10.00 2.50 0.28
Page 131
Bitumen 0.680 1 0.00068 76.40 0.05 70.30 0.05 100.00 2.50 0.17
TOTAL 0.21 0.14 0.45 43.50

Repair to Pot Holes by BM


10478.70 1 sq.m Stone 1
Aggregate 1.416 1.9 2.6904 51.60 73.07 25.00 35.40 15.00 2.50 100.89
Bitumen 0.09350 1 0.09350 76.40 7.14 70.30 6.57 100.0 2.50 23.38
TOTAL 80.21 41.97 124.27 10725.15