Вы находитесь на странице: 1из 34

1

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 1 of 1

STANDARD OPERATING INSTRUCTION

FOR

TURBINE LUBE OIL SYSTEM

STANDARD OPERATING PROCEDURE FOR LUBE OIL SYSTEM OF STEAM TURBINE


GENERATOR
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
2

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 2 of 1

OBJECTIVE: For Safe & Smooth Operation of Turbine-generator lube oil system.

SCOPE: This SOP is applicable for Lube oil system for the steam turbine& generator Make DEC
China,Type. N600-16.7/538/538, of subcritical three cylinder/four flow, single shaft/single intermediate
reheat, condensing type.This procedure covers all the standard operating procedures related with lube
oil system of T.G.

INTRODUCTION: The lubricating oil system is provided to supply the lubricating oil for the
pedestal and thrust bearings of turbine-generator and for the turning gear. It also supplies the reserve
oil for the hydrogen seal oil system and the pressure oil for the mechanical overspeed trip device and
sufficient oil to the jacking oil pump

The lubricating oil system contains Main oil tank, MOP, BOP coupled with OIL TURBINE, TOP, EOP,
MSP, jacking oil pump(JOP), oil cooler and oil overflow valve etc. During the normal operation of the
unit, the inlet(suction) oil of MOP and the lubricating oil of the unit are supplied by the Booster oil
pump(BOP) which is installed inside the main oil tank. The pressure oil from the outlet of the main oil
pump is fed back to the BOP as its suction oil & this oil fed to oil-turbine mounted on the BOP shaft
which rotates the BOP. oil turbine on one hand utilizes the pressure of MOP discharge pressure for
rotating the booster oil pump(BOP) & after utilizing the pressure oil the oil gets depressurized & sent to
bearings as lube oil.When the unit is started and speeding up, or shut down, it is the TOP that feeds the
lubricating oil system. In the event of failure of the TOP, the EOP will take its place to maintain the
pressure of lubricating oil. The MSP supplies oil to the inlet of the main oil pump when the speed of the
turbine rotor is below 2850r/min. The jacking oil system is equipped with three pumps, comprising two
ACJOP and one DCJOP, which are started before the unit is turned by the turning gear to reduce the
start torque of the turning gear and prevent the shaft from rubbing against the bearing pad.

LUBRICATION SYSTEM composed following systems

1) Main oil tank -1 No.– Normal capacity 41.6 m 2

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
3

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 3 of 1

2) A.C. Turning oil pump (TOP)- 1 No.

3) D.C. Emergency Oil Pump (EOP)-1 No.

4) Main Oil Pump (MOP)-1 No.

5) Main start up pump (MSP)-1 No.

6) Booster oil pump (BOP)-1 no.

7) AC JACKING OIL PUMP- 2 Nos.

8) DC Jacking oil pump- 1 no.

9) Oil tank Heaters- 6 nos.

10)Vapour exhaust fan-2 nos.

11) Cylindrical oil filters-2 Nos.

12)oil cooler(Plate type heat exchanger) – 2 Nos.

13)Oil Purification Device- 1No.

TECHNICAL DATA-
MAIN OIL TANK-
Main oil tank is an integrated oil tank with a lot of equipments of the system i.e.TOP,EOP,BOP,MSP,vapor
exhaust fan, oil level indicator, electric heaters etc. mounted on the oil tank.

Make Dong Fang Steam Quantity 1 set

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
4

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 4 of 1

Turbines Company
Oil- Type ISO VG-32 Capacity 41.6m3

TURNING OIL PUMP-AC (TOP)


This pump supplies lube oil to T.G. bearings during T.G. start up,shutdown or emergency conditions.
(like MOP is not building required lube oil pr.)

Make Chengdu institute of Quantity 1 set


pump application
technology
Type Single stage, single Capacity 4685L/min
suction, vertical
centrifugal pump
125LY-44

Pressure Head 0.44 Mpa Rotating speed 1485 r/min


Turning oil pump’s motor
Type YB2-280S-4TH Power 75 kW
Voltage 415V Current 130.4 A
Rotating speed 1480 r/min Efficiency 66%

EMERGENCY OIL PUMP-DC(EOP)


This pump is in operation when TOP does not able to supply lube oil as per demand or AC fails to,
supplies the lube oil to T.G. lube oil system & ensures safe running of T.G.

Make Chengdu institute of Quantity 1 set


pump application
technology

Type: vertical centrifugal capacity: 3820L/min


pump

Pressure Head 0.31 Mpa Rotating speed 1500 r/min


Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
5

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 5 of 1

Emergency oil pump’s motor


Type DC Power 40 kW
Voltage 220 V DC Current 208 A
Rotating speed 1500r/min Efficiency 66%

Main Oil Pump (MOP)-1 No.

MOP is a double suction single stage centrifugal pump coupled with T.G. main rotor & installed inside the
turbine front pedestal. During the normal running of turbine it runs along with turbine rotor & supplies oil
to Booster oil pump(BOP) from where oil gets depressurized & fed to T.G. Lube oil system.MOP takes
the suction oil from BOP discharge.

Make Dong Fang Steam Quantity 1 set


Turbines Company

Type: centrifugal pump capacity: 378 kg/Hr.

Pressure .128 Mpa/1.9 Mpa Rotating speed 3000 r/min


Inlet/Outlet

Main start up pump (MSP)-1 No.

This pump supplies the oil for MOP suction during T.G. startup,shutdown or emergency conditions. MSP
supplies oil to the inlet of the main oil pump when the speed of the turbine rotor is below 2850r/min.

Make Chengdu institute of Quantity 1 set


pump application

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
6

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 6 of 1

technology

Type: 150LY-23-1A capacity: 6300 ltrs/min.

Discharge 22.4 Mtrs.(0.25 Mpa) Rotating speed 1450


Pressure Head

Main start up pump’s (MSP)motor


Type YB2-225M-414 Power 45kW
Voltage 415 V AC Current 77.5 A
Rotating speed 1480 r/min Efficiency 92.8%

Booster oil pump (BOP)-1 no.

This pump serves double purpose in the lube oil system.At one hand it utilizes MOP discharge pressure
oil as suction of OIL TURBINE mounted on shaft of BOP which rotates the BOP & after utilizing the
pressure of MOP discharge pressure oil BOP fed the oil to T.G. Lube oil system.Secondly this booster
pump supplies the oil to MOP suction.The throttle v/v, bypass v/v & overflow v/v of oil turbo should be
adjusted & throttled to maintain MOP suction pr. 0.098-0.147 Mpa & bearing lube oil pr. Between 0.137
-0.176 Mpa.

Make Dong Fang Steam Quantity 1 set


Turbines Company

Type: centrifugal pump capacity: 6300 Ltrs./Min.

Pressure Outlet 0.25 MPa Rotating speed

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
7

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 7 of 1

Jacking oil pump(JOP)- 3 nos.


When turbine units are in stationary state, jacking oil is supplied to rotor journal bearings to jack or lift
the rotor so that hydrostatic pressure of oil reduces the friction between rotor & journal bearing & barring
gear can smoothly turn the rotor . There are 2 nos. ACJOP & 1 No. DCJOP installed in the system.

Make Dong Fang Steam Quantity 3 Nos.


Turbines Company

Type: centrifugal pump capacity: 140 Ltrs./Min.

Outlet Pressure 17 Mpa Rotating speed 1480 r/min

Jacking oil pump- motor


Type AC (2 nos.) & DC (1 Power 55 kW
No.)
Voltage 415 v AC & 220V DC Current
Rotating speed 1480 r/min Efficiency

Oil tank Heaters- 6 nos

In the MOT 6 nos. of electric heaters are provided for initial heating of lube oil at start up time if the
temperature of lube oil in MOT is about 20 deg C.Use these heaters to raise the oil temperatures till 35
deg C & then stop.

Make Dong Fang Steam Quantity 6 Nos.


Turbines Company
Type ISO VG-32 Power 90(6×15)KW

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
8

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 8 of 1

OIL FUME SEPERATOR -Vapor exhaust fan-2 nos.

The system is provided with oil fume separator device (vapor exhaust fans-2 nos.) which generates
slightly negative pressure inside the MOT causes the smooth flow of return oil in MOT & removes the oil
water vapors from the return oil & safely exhaust them in atmosphere.This improves turbine lube oil
quality & make system more reliable.

Make Hangzhou Kexing Quantity 2 Nos.


blower co ltd.

Type: SGFD-20-1(2) capacity: 1200 m3/hr

Total head 5000 Pa Rotating speed 2900 r/min

Vapour exhaust fan’s motor


Type YB2-132S1-2 TH Power 5.5 kW
Voltage 415 V Current 10.1 A
Rotating speed 2900r/min Efficiency

Cylindrical oil filters-2 Nos.

The system is provided with two nos. of oil filters installed on bearing lube oil supply circuit to maintain
the necessary lube oil cleanliness & quality in the system.

Make Jiujiang Branch of 707research Quantity 2 Nos.


institute of csic

Type: 707FM1625H4W25GH1.0F0.8 capacity: 5000 Ltrs./Min.


-DQ

Working 0.6 Mpa Filtering rating 25 microns


pressure

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
9

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 9 of 1

Oil cooler(Plate type heat exchanger) – 2 Nos

The lube oil system is equipped with 2 nos. of oil coolers (plate type heat exchangers)out of which one
will be in operation & other standby.it uses OCCW water as a cooling medium for taking heat of lube
oil.It generally keeps temperature of lube oil in the range 40-45 deg.C .

Make Tranter Heat Quantity 2 Nos


Exchanger co Ltd
Model GX-100x297 Area 2980 m2
Design/test 1.0/1.4 mpa Design temperature 100 deg c
pressure
Channel 1x148, 1x148 Plate material TP 316L/NBR
arrangement /Gasket Material
Cooling area 328.3 m 2 Cooling oil flow 295 m 3 /Hr.
Cooler inlet/outlet 65/45 Cooling water flow 402.9 m 3 /Hr.
temp.

Oil Purification Device- 1No.

One oil purification device is incorporated with Lube oil system .the oil purification device seperatly
installed near MOT at 0 mtrs. Elevation.It took suction from MOT & after purification fresh oil fed back to
MOT.

Type QYJB—12 Power 45 kW


Capacity 12m3/h Current

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
10

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 10 of 1

Rotating speed 2900r/min Efficiency


working pressure <0.5MPa filter precision ≤1μm
operation 20—750C water content in ≤10mg/L
temperature oil after treatment

gas content in oil ≤0.2% Filtration rate


99.9%
after treatment

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer.


SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.

SPECIAL TOOLS/ EQUIPMENTS: NIL

PRECHECKS AND ACTION BY FIELD ENGINEER

S No Description Ok Not Ok Remarks

1 All permits and cross permits have been returned.  

2 All mechanical/electrical/C&I work has completed &


working area is clear of any combustible or non
combustible materials(Housekeeping).  

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
11

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 11 of 1

3 All equipment interlock protection tests are completed


and qualified  

4 Main oil tank is filled with suitable amount of qualified Oil


and Oil level is normal (Local).  

5 OCCW pump is in service.  

6 Lube oil cooler switching valve is in line.  

7 Lube oil cooler CW inlet, outlet valves are open.


 
( OCCW )
8
Check that lube oil filter, M.O.T. tank bucket filter is in
cleaned condition & in service with standby available.  

Lube oil filter outlet valve is open.


9 Cooler outlet oil line all drain valve/vent valve is
closed.check all the connecting flanges of oil lines &  

cooler water line for any leakage,if any rectify the same.
10 Fire fighting system in respective area should be in
operating condition(Prechecking of all firefighting
 
nozzles, lines valves must done so that it may work
effectively during fire hazards.)
11 Check and make sure that lubricate oil temperature is
normal & there is no leakage in system.  

12 If oil temperature is Below 20 Deg.C then heaters must


be ON In the system.After reaching oil temp. 35 Deg.C
heater will stop. In this condition lube oil coolers should
not be in service.  

Vapor exhaust fan must be in START condition before


13 starting any oil pump in system.  

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
12

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 12 of 1

PRECHECKS AND ACTION BY DESK ENGINEER

S No Description Ok Not Ok Remarks

1 All permits and cross permits have been returned.  

Main oil tank is filled with suitable amount of qualified Oil


2 and Oil level is normal (DCS).  

3 Power supply module is ON. (TURBINE MCC).  

Keep pumps ON/ OFF selection in ON (i.e.) Remote,


4 emergency push button should be in release condition.  

Ensure that power supply to all equipments is in healthy


5 conditions & control & trip circuit is in service.  

OPERATING PROCEDURE –LUBE OIL SYSTEM


RESPONSIBILITY
Sr.
Description UCE D FE EE
No.
E
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power supply and control power supply available.Ensure that all
√ √ √
equipments interlock protections test are completed & qualified.
3 Main oil tank is filled with suitable amount of qualified Oil and Oil level
is normal in Local & DCS.(maintain oil level on higher side during √ √
initial start up +100 mm )
4 OCCW pump is in service.& lube oil cooler is charged in water side √

(Lube oil temp. is min. 38 deg C)
5 Lube oil temperature is in normal condition i.e. 35 deg. C,if not start
√ √
electric heaters & heat the oil till 35 deg C
6 Ensure the pump discharge & return oil lines circuit is in healthy
condition.No leakages in any lube oil or cooling water line √
flanges,Joints.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
13

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 13 of 1

START PERMISSIVE :

1 MOT Tank level normal.(+100 mm) √ √

2 DC EOP should be interlocked With TOP √

3 Power supply and control power supply available. √ √

LUBE OIL SYSTEM START UP SEQUENCE :


1 It should be ensured that all the checks has been completed as per
√ √
check list.
2 If oil temperature is below 20 deg C than heat the oil till 35 deg C &
then only start any pump,in this condition cut the water supply of oil √ √
cooler till temp. reaches 38 Deg C
3 Start the Vapor exhaust fan & check the vacuum inside the
√ √
MOT.Vacuum should be around 100-200 kpa.
4 Start the T.O.P. check the pressure & other parameters are normal,
Inspect the oil in return oil line view glass. TOP will be in service till
√ √
turbine attains 2850 RPM.

5 Check the lubricating oil system for leakage; ensure that the
lubricating oil pressure is not below 0.098MPa at the elevation of the √ √
front bearing housing.

6 Start the JOP. check the Discharge pressure & other parameters are
normal, check the individual bearings jacking oil pressure.JOP will be
√ √
in service till turbine attains 2500 RPM

7 Start the M.S.P. check the pressure & other parameters are normal.
MSP will be in service till turbine attains 2850 RPM √ √

8 Check & ensure the bearing lube oil return temperature is normal &
√ √
within limits
SHUTDOWN SEQUENCE:

PLANNED SHUTDOWN :

1 The Lube oil system can only be stopped if only the temperatures of √ √
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
14

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 14 of 1

HPT inner casing comes below 120 Deg C & seal oil system is
working normally.
2 Jacking oil pump can stop(i.e. Barring gear) if only temp. of HPT √ √
Inner casing comes below 150 deg C.
3 After stopping the MSP & TOP from DCS,stop the water supply to oil
coolers,if and only temperatures of oil comes to 35 Deg C. Release √ √
the DC EOP from interlock.
4 Shut down the vapor exhaust Fan when all the pumps of lubricating
oil system has stopped & return lube oil temperatures comes below √ √
40 deg C
5 Pay attention to oil level rise of main oil tank, when oil level is too
high, it should overflow into oil storage tank out of turbine hall. √

EMERGENCY SHUT DOWN:


1 During emergency shut down of turbine lube oil system ,Turbine will
√ √
be in TRIP condition.
.

INTERLOCKS & PROTECTIONS : Remarks

1 At R.P.M. >2850 R.P.M. MSP will be stopped.


2 If MOP Discharge pr. Low < 1.205 Mpa/Lube oil pr.< 0.115 Mpa than
TOP will start
3 If MOP Suction pr. Low <0.07 Mpa than MSP will start
4 If TOP is running & Lube oil pr.becomes low< 0.105 Mpa than EOP will
start
5 If Lube oil pr.becomes low< 0.07 Mpa than turbine will trip.
6 Main oil tank is lower -100 MM than LOW alarm acts.

OPERATING PROCEDURE – TURNING OIL PUMP


Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
15

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 15 of 1

INTRODUCTION: Turning Oil Pump (TOP) supplies oil to Turbo Generator bearings. There is one
AC motor driven TOP for supplying oil from bearing no.1 to 9 including thrust bearing. After TG attains a
speed of 3000 rpm, the shaft mounted Main Oil Pump (MOP) takes over and TOP is to be stopped. TOP
is to be kept select in ‘AUTO’ whenever the turbine is running. TOP is interlocked to start when the MOP
discharge pressure falls below 1.205MPa. TOP is rated to deliver 4685 Ltrs. meters per hour and is
driven by 415V, 3 phase, 75KW, 1480 rpm motor.

PRE CHECKS:

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer


SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.


SPECIAL TOOLS/ EQUIPMENTS: NIL
RESPONSIBILITY
Sr.
Description UC DE FE EE
No.
E
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power supply and control power supply available. √ √ √
3 Main oil tank is filled with suitable amount of qualified Oil and Oil level
√ √
is normal in Local & DCS.(maintain +100 mm)
4 OCCW pump is in service.& lube oil cooler is charged in water side
√ √
(Lube oil temp. is min. 38 deg C).
5 Lube oil temperature is in normal condition i.e. 35 deg. C,if not start
√ √
electric heaters & heat the oil till 35 deg C
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
16

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 16 of 1

6 No leakages in any lube oil or cooling water line flanges,joints . √ √


START PERMISSIVE :

1 MOT Tank level normal. √ √

2 DC EOP should be interlocked With TOP √ √

3 Power supply and control power supply available. √

TURNING OIL PUMP - START UP SEQUENCE :


1 It should be ensured that all the checks has been completed as per √

check list.
2 If oil temperature is below 20 deg C than heat the oil till 35 deg C &
then only start any pump,in this condition cut the water supply of oil √ √
cooler till temp. reaches 38 Deg C
3 Start the Vapor exhaust fan & check the vacuum inside the MOT. √ √
4 Start the T.O.P. check the presuure & other parameters are normal,
√ √
Inspect the oil in return oil line view glass.
5 Check & ensure the bearing lube oil return temperature is normal &
√ √
with in limits
6 Check & ensure the bearing lube oil return temperature is normal &
√ √
with in limits
SHUTDOWN SEQUENCE:

PLANNED SHUTDOWN :

1 The Turning oil pump(TOP) can only be stopped if only the turbine
rotor attains a speed of >2850 RPM or bearing temperatures of
Journal & thrust bearings comes below 50 deg C(lube oil system can √ √
stopped only When turbine HP inner casing temp. comes below 120
Deg C.)
2 Press the stop button on OIS and stop the TOP.

3 Check and confirm that emergency oil pump (EOP) can automatically
√ √
start and operate normally.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
17

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 17 of 1

4 When the EOP starts the red lamp for operation indication on the OIS
turn on. When the TOP oil pump changes over to EOP oil pump, the
resultant sudden short time oil pressure drop will be detected by the
turning gear interlock device and therefore in this case the turning
√ √
gear will stop operation.

Check and confirm whether turbine shaft is still rotating. If it has


stopped, restart the turning gear motor to make it engage and
perform the next operation.

TRIPPING OF PUMP :If suddenly TOP trips


1 Check and confirm that emergency oil pump (EOP) can automatically
√ √ √
start and operate normally.
2 Check all the relevant parameters of T.G. Lube oil system. √ √ √
EMERGENCY SHUT DOWN
1 During emergency shutdown of TOP , Make sure that EOP comes in
√ √ √
service .
2 Check the causes for emergency & Rectify the same. √ √
3
4

INTERLOCKS & PROTECTIONS : Remarks

1 Lube AC(TOP) oil pump auto start:


2 Turbine trip
3 Rotor is not repose and lube oil pressure is L(<0.115MPa)
4 Rotor rotate speed >2850r/min and main oil pump outlet oil pressure
<1.205 MPa

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
18

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 18 of 1

OPERATING PROCEDURES FOR MAIN START UP PUMP (MSP)

INTRODUCTION: Main startup pump(MSP) supplies oil to Main Oil pump (MOP) for suction head. At the
time of Turbine costing down, when turbine speed reduces to about 95%of rated speed(2850 RPM), the
discharge pressure of main oil pump is not high enough to drive booster pump, resulting in the shortage
of oil at main oil pump inlet. For safety sake MSP shall be started to feed oil to main oil pump inlet. There
is one AC motor driven MSP for supplying oil to MOP. During turbine rolling ,After TG attains a speed of
>2850 rpm, the shaft mounted Main Oil Pump (MOP) takes over and MSP is to be stopped. MSP is to be
kept select in ‘AUTO’ whenever the turbine is running. MSP is interlocked to start when the MOP suction
pressure falls below 0.07mpa.This is realized by electric interlock via pressure switch.

PRE CHECKS:

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer


SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.

SPECIAL TOOLS/ EQUIPMENTS: NIL

Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
19

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 19 of 1

2 Power supply and control power supply available. √ √ √


3 Main oil tank is filled with suitable amount of qualified Oil and Oil
level is normal in Local & DCS.(maintain +100 mm) √ √

4 OCCW pump is in service.& lube oil cooler is charged in water side

1. (Lube oil temp. is min. 38 deg C) √ √


2. Lube oil cooler switching valve is in line.
5 Lube oil temperature is in normal condition i.e. 35 deg. C,if not start
√ √
electric heaters & heat the oil till 35 deg C
6 No leakages in any lube oil or cooling water line flanges,joints.
√ √
START PERMISSIVE :

1 MOT Tank level normal. √ √

2 Put DC Emergency oil pump interlock switch into operation √ √

3 Power supply and control power supply available. √

Main Start up pump (MSP) - START UP SEQUENCE :


1 It should be ensured that all the checks has been completed as per
√ √ √
check list.
2 If oil temperature is below 20 deg C than heat the oil till 35 deg C &
then only start any pump,in this condition cut the water supply of oil √ √
cooler till temp. reaches 38 Deg C
3 Start the Vapor exhaust fan & check the vacuum inside the MOT. √ √
4 Start the T.O.P. check the pressure & other parameters are normal,
Inspect the oil in return oil line view glass. Then start MSP,Check and
√ √
make sure that all the indications of pressure meters are right.

5 Check and make sure that vibration and sound is normal. √ √


6 Check MOP suction as well discharge pressure from local pressure √ √
gauge in front of Turbine.MOP suction pressure should be 98~147
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
20

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 20 of 1

kpa and MOP discharge pressure is 1372~1550 kpa.


7 Check the level of MOT is normal and oil level is indicated on OIS.
√ √

SHUTDOWN SEQUENCE:

PLANNED SHUTDOWN :

1 Press the stop button on OIS and stop the MSP after turbine speed

reached >2850 rpm.
2 Check and confirm that suction (0.147MPa) as well discharge

pressure (1.55MPa) of MOP is normal after stopping MSP.
3 After stopping the pump put it on interlock. √

TRIPPING OF PUMP :If suddenly MSP trips


1 Check and confirm that emergency oil pump (EOP) can automatically
start and operate normally. √ √

2 Check all the relevant parameters of T.G. Lube oil system. √ √


EMERGENCY SHUT DOWN
1
2
3
4
INTERLOCKS & PROTECTIONS
1 MSP auto start √

1) Turbine trip √

2) Main oil pump inlet oil pressure <0.07MPa

OPERATING PROCEDURES FOR EMERGENCY OIL PUMP (EOP)


Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
21

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 21 of 1

INTRODUCTION Emergency oil pump (EOP) comes into service in the event of an emergency. This
is driven by a DC motor.In the event of total plant power failure or, if the AC driven auxiliary oil
pump(TOP) fail to start due to any reason this pump comes to operation by interlock when lube oil
header pressure drops to 0.105 Mpa to supply the lube oil to TG bearings for its safe coasting down and
subsequent baring gear operation.

PRE CHECKS:

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer


SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.


SPECIAL TOOLS/ EQUIPMENTS: NIL

Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 DC power supply is available. √ √
3 Pressure switch interlock is properly incorporated √ √
4 Main oil tank is filled with suitable amount of qualified Oil and Oil
level is normal in Local & DCS. √ √

START PERMISSIVE :

1 TOP fails during start & lube oil pressure lower than 0.105 Mpa. √ √

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
22

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 22 of 1

START UP SEQUENCE :
1 DC EOP will start if the lube oil header pressure is lower than
0.105mpa. & MOP/TOP fails due to any reasons(power failture or √ √
any other reason)
2 If the interlock does not work the pump can be started from OIS. √ √
3 After starting the pump check discharge pressure and motor current. √ √
4 Check and make sure that vibration and sound is normal. √ √
5 Check the level of MOT is normal and oil level is indicated on OIS. √

SHUTDOWN SEQUENCE:

PLANNED SHUTDOWN :

1 The DC EOP can be stopped from OIS when it is no longer required √


to run, say, when AC power is resumed to the station.
2 Stop the pump from OIS. √

3 After stopping the pump put it on interlock. √

TRIPPING OF PUMP :If suddenly EOP trips


1 If suddenly EOP trips & lube oil pr.<0.07 Mpa.Turbine will TRIP. √ √
2
INTERLOCKS & PROTECTIONS
1 Lube DC oil pump auto start: √ √

1) Lube AC oil pump stop

2) Rotor is not repose and lube oil pressure is L(<0.105MPa)

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
23

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 23 of 1

3) Lube AC oil pump auto start overtime

4) Turbine tripped and DC lube oil pump is in standby

OPERATING PROCEDURES FOR JACKING OIL PUMP(JOP)


INTRODUCTION When turbine units are in stationary state, jacking oil is supplied to rotor journal
bearings to jack or lift the rotor so that barring gear can smoothly turn rotor. The oil source of jacking oil
pump is the lubricating oil coming out of oil cooler with a pressure of about 0.176MPa, which can
effectively prevent JOP from cavitations corrosion due to air suction. Sucked oil is filtered through a
25µm duplex filter before flowing into jacking oil pump. After oil pressure boosted by jacking oil pump, oil
pressure at pump outlet is 16MPa.The pressure oil passes through discharge filter and finally flows into
each bearing through one way valve and throttle valves.There is Two AC motor driven jack oil
pump(JOP) and one DC driven jacking oil pump for the turbo generator. The jacking oil pump supplies
high pressure oil to each of turbo generator bearings(Bearings 3,4,5,6,7,8,)to jack up the rotor, thus
reducing the shaft to bearing metal frictional resistance during barring operation.

Normally the Two AC driven JOP runs for barring gear. In the event of TG tripping due to total plant AC
failure or outage of Both AC JOP due to any reason, the DC driven JOP is to be run.

PRE CHECKS:

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer

SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
24

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 24 of 1

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.

SPECIAL TOOLS/ EQUIPMENTS: NIL

Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power and control supplies are available
√ √
3 TOP or EOP is running and oil temperature should be 35~40°C.
√ √
4 Oil extraction fan is in service √ √
5 Generator seal oil system must be in service prior to JOP start up. √ √
6 Suction and discharge valves of the JOP to be run are in open

condition and drain valves are close.
7 Both the micro filters at JOP discharge are in service.

START PERMISSIVE :

1 JOP inlet pressure not low. √

START UP SEQUENCE :
1 Start the JOP from OIS. √
2 After starting the pump check the discharge pressure of pump &
individual bearing supply line. √ √

3 Check the running current and vibration of the pump. √ √


4 When turbine speed < 2500rpm or ACJOP A discharge pressure ≤
7mpa then interlock protection will start the AC JOP B. √ √

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
25

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 25 of 1

5 Similarly when AC jacking oil pump B will stop or turbine speed


<2500rpm or running pump outlet pressure low (≤7mpa), interlock √
protection will start the DC JOP.
6
SHUTDOWN SEQUENCE:

PLANNED SHUTDOWN :

1 When the TG set is no longer on barring gear the JOP can put off.

2 If TOP or DC emergency oil pump stop or turbine speed>2500 rpm


then jacking oil pump will stop. √

TRIPPING OF PUMP :If suddenly JOP trips


1 When one AC jacking oil pump will stop or turbine speed ≤2500rpm
or running pump outlet pressure low (≤7mpa), interlock protection
√ √
will start the second AC JOP.if second AC JOP does not start than
DC JOP will start.
2 when DC jacking oil pump will stop or turbine speed ≤2500rpm or
running pump outlet pressure low (≤7mpa), interlock protection will √ √
start the AC JOP.
EMERGENCY SHUT DOWN
1 If JOP trips in emergency,barring gear will stop. √ √
2 Turn the turbine rotor by manual barring gear. √ √
INTERLOCKS & PROTECTIONS : Remarks

1 Allow start jacking oil pump: Jacking oil pump inlet oil pressure not
low
2 jacking oil pump auto start:

1)Rotor rotate speed <2500rpm

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
26

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 26 of 1

2)Running pump A tripped (3-second pulse) and standby pump


interlock start .

3)Running pump outlet header pressure ”L”


3 When the running pump is tripped, the standby pump interlock start
failed, interlock start jacking oil pump C(DC JOP)
4 jacking oil pump auto stop:

Jacking oil pump inlet oil pressure is low and delay 5s.

Turbine rotor speed >2500rpm(3-second pulse)

OPERATING PROCEDURES FOR VAPOR EXHAUST FAN -2 nos.

INTRODUCTION During normal running of turbine , the lube oil supplied to various bearings comes
in to contact with condensate steam/water particles due to leakage through steam sealing rings& oil
catcher rings of journal & thrust bearings causing contamination of return oil. Further due to friction &
temperature rise in the system oil vapor will produce in the system.

Hence it is necessary to safely discharge the above oil & vapor fumes in to atmosphere for maintaining
the supply oil quality . for this purpose vapor exhaust fan (2 nos. )installed at the top of main oil tank

PRE CHECKS:

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
27

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 27 of 1

SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.


SPECIAL TOOLS/ EQUIPMENTS: NIL
Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power and control supplies are available. √ √
3 Ensure free rotation of fan motor √
4 Insure inlet v/v of vapor exhaust fan is open √ √
5 When starting the one fan the outlet v/v of second fan must be closed √
START PERMISSIVE :

1 Power control supply is normal √

START UP SEQUENCE :
1 Start the Fan by giving Start command from DCS √
2 Check the normal current of mootor √ √
3 check for any abnormal sound or vibration. √ √
4 Check for MOT tank vacuum - it should be around 100-200 kpa. √ √
SHUTDOWN SEQUENCE:
PLANNED SHUTDOWN :
1 If all the pumps of lubricating oil system has stopped & temperature √
of return oil is below 40 Deg C. then vapor exhaust fan can be √
stopped

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
28

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 28 of 1

2 Close the suction & discharge v/v (dampers) of Fan √

TRIPPING OF Fan :If suddenly vapor exhaust fan trips


1 When the fan is at standby status, if the running fan stops, the √
standby fan will start. √ √

2
EMERGENCY SHUT DOWN
1
2
3
4

ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer
o MFT: Main Fuel Trip.
o RB : Run Back

Important Note:

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
29

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 29 of 1

Signature Signature Signature

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
30

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 30 of 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
31

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 31 of 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
32

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 32 of 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
33

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 33 of 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:
34

KSK Mahanadi Power Company Ltd.


6 X 600 MW Power Plant KMPCL / Opr. / TURBINE
LUBE OIL SYSTEM/ 01
SOP FOR TURBINE LUBE OIL SYSTEM
Power from knowledge
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 34 of 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Saurabh Shrivastava Name: Name:
Designation: Asst. Manager Designation: Designation:

Вам также может понравиться