Вы находитесь на странице: 1из 6

SAFE WORK METHOD STATEME

Company Name: Blue Star Ltd. Project Name: Siemens, Kharghar


Date: Doc. Name.: Loading & Unloading of Materials (Pipes, Metal Sheets, B
Prepared By: Imran Khan NOTE : Sign off to be provided at tool box talks

Sr. Potential
Activity/Sub Activity
No. Hazards/Consequences

Unaware & unfamiliar


operator / Drivers may lead
Mobilization of driver /
to hitting/collision/topling of
1 operator & signalman
Farana/Crane could leads to
(manpower) to premises.
serious body injury or
property damage

Over speeding may result to


property damage and
Mobalization of personal injury
2
Farana/Crane

Exhaustion of Smoke from


Farana/Crane

Failure of Lifting
Equipments, tools and
tackles.

Rigging up the Load


(Pipes, Beams, Channels,
3
Structure, Metal Sheets,
Drums etc...)
Rigging up the Load
(Pipes, Beams, Channels,
3
Structure, Metal Sheets,
Drums etc...)

Rigging failure May leads to


fall of materials.

Hitting With Men or


Materials
Swing & Position the
4
Load

Collapse of Farana/Crane

5 Rig down the Load Equipment failure

6 Housekeeping Slip, Trip & Fall Hazards


Prepared By: Amol Waman Review By: Jayesh Makwana
(BLUE STAR LTD.) (CBRE)
SAFE WORK METHOD STATEMENT

mens, Kharghar
ding & Unloading of Materials (Pipes, Metal Sheets, Beams, Structure, etc...) by Crane/Frana
o be provided at tool box talks

Responsible
Control Measures
Person

1.Driver shall have Valid RTO issued crane operating license.


(security/ safety person to check )
2. Safety Person should be check farana crane third party
inspection documents ( form No. 11& Insurance etc.)
3.Safety Induction, Evaluation & TBT training covering the
requirements of safe operations inside the premises to all the Concerned
persons involved in the fharane movement (drivers, banksman Supervisor
etc) will be given by HSE Personnel’s.
4.Safety Inspection of fharana should be done before allowing
the site movement.
5. The permission of farana is given only after the permit
procedure is completed.

1.TBT will be given to the Workers.


2. Follow speed limit (15 km/hr)
3. Follow escort (Banks man) signals. Safety Officer
4. Barricate the area. & Concerned
5. Safety Sign boards should be display. Supervisor
6. Ensure Approved lifting plan lifting permit before starting
the work.

Pollution Under Control certificate issued by Government


Concerned
authorized agencies & the emission parameters are within
Supervisor
specified limit.

1. Farana/Crane document to be checked(Vehicle Insurance,


PUC, Form No. 11, RC Book, Driver License, etc...).
2. Farana/Crane to be checked with check list before entering
at site.
3. Ensure that lifting Slings dosen't contain any cut and have
it's test certificate and to be checked with Check list. Safety Officer
4. Ensure that the shakle (Bow, D) is in good condition and & Concerned
having it's test certificate and to be checked with check list. Supervisor
5. SLI indicater to be checked.
6. Proper and correct clamps to be used for load lifting.
7. For metal sheets llifting, proper plate lifting clamps to be
used.
8. Pre lifting plan to be discussed and submitted.
1. Never exceed SLI.
2. Never over load than the capacity of farana /crane.
3. Ensure that the load is lifted within 60 degree.
4. Ensure Farana hook lock is in working condition.
5. Check the crane hook & rop properly.
6. One pipe at a time to be lifted.
7. If the staging of material is not proper do not unload. Safety Officer
8. Activity to be done under Lifting expert or supervisor. & Concerned
9.Barricate the working area with safety sign. Supervisor
10. Crane swing radius free from obstricals.
11. Tag line to be provided to the lifted materials.
12. Swing area to be barricated.
13. Effective suppervisor will monitor the area.
14. Signages will be displayed. (lifting in progress)
15. Area to be barricated.

1. Escort (signal man) with the vehicle will be moving with it


continuously from the start to end point within the premises.
2. Barrication to be done.
3. Person never to be allowed under susspended load or within Concerned
swinging area. Supervisor
4. All the lifting activity to be done under supervision.
5. Proper PPE to be provided.(Safety Helmet, Jacket,Safety
Shoes,Safety Goggle,Hand Gloves,Etc.)

1.Ground condition to be checked compact and firm.


2. Follow the load chart displayed in Farana. Concerned
3. Follow the SWL. Supervisor
4.Never Exceed SLI.
1. Trained, Qualified and competent personal will engage the
work. Concerned
2. Certification and pre-check of equipment with check list to Supervisor
be done.
1. Maintaining good housekeeping.
2. barricating working area.
3. Use PPE's (safety belt, reflected jacket, steel toe shoes and
Concerned
safety goggles) at site.
Supervisor
4. Daily TBT should be conducted before start of work.
5.work permit to be closed after compeltion of the work
activity.
Review By: Jayesh Makwana Approved By: Sunil Puranik