EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements (SAEP-1160 Database) ... Applies to Plant Piping. Pipelines, Tanks & Vessels
Procedure Scope:
Production Welding, Welder Performance, Reporting, NDE
Tracking, Pressure Test Verification (Process Completion): Sch Q, Att. 6
A) Information is gathered, correlated, linked, stored, & reported by an
electronic format (Excel, Access, PDF, similar) acceptable to SA. SAEP-1160,
A1 B) Contractor Data Mgmt & Tracking System (SAEP-1160
Database) must be approved by SA prior to start of work on Capital Section 5.1
Projects
Page 1 of 10
Sch Q, Att. 6
SAEP-1160 Database Data Availability (SAEP-1160, Sect. 6.3):
SAEP-1160,
Welding Production Output for cumulative weld data and welder data
required by this document is to be reported weekly in the weld tracking &
A6 Section 5.4 &
welder performance report. Shop and field weld and welder data may be
included on the same report. Refer
Section 6.3*
to Att. 1 (Section 6.3) for Data & Reporting Details.
Page 2 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Weld ID & Traceability, Process Control
SAIC-W-2008 1-Dec-06 WELD-
Tracking (SAEP-1160 Database)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
B Detailed Requirements (SAEP-1160 Database) ... Quality Manager Checklist
Page 3 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Weld ID & Traceability, Process Control
SAIC-W-2008 1-Dec-06 WELD-
Tracking (SAEP-1160 Database)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Retests for HT
A) If any reading exceeds the specified limit by no more than 10
BHN, then a minimum of three (3) additional indentations shall be made
near the original high reading
B) Indicate acceptance or rejection of the required 3 additional HT test
on the same weld. If all three (3) retests are below specified limits, then
B13 same as above
the joint is acceptable. If any of the retest readings are found to exceed
the specified limits, then the weld shall be
considered unacceptable.
C) If any welds are found to be unacceptable, then two
additional welds from the same lot shall be tested. If more than one weld
in a lot is found to be unacceptable, then all welds in that lot are tested.
C PHYSICAL MARKING OF WELD ID NUMBERS BY SYSTEM (SEE ATTACHMENT 1, SAEP-1160, SECTION 6.2)
Page 4 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Weld ID & Traceability, Process Control
SAIC-W-2008 1-Dec-06 WELD-
Tracking (SAEP-1160 Database)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
All weld joints shall be marked for identification by
weld number & welder symbol. Identifications shall be
made with a suitable weather-proof marking material.
SAES-W-011,
Markings shall be placed in a location so they will be Section 16.
easily observed & remain visible for a time suitable*
to authorized SA inspector. SAES-W-010,
Section 15,
* Until Coating system has been approved to SAES-
C6 cover up completed / accepted* (Visual, NDT, Tested, etc) W-012, Section
welds. Note 1: Markings shall 15,
be compatible with subsequent coating or heat-shrink
sleeve applications. Note SAES-W-
2: Markers shall be low chloride type for SS. 017, Section 15,
This covers all applications
at SA.
D WELD MODIFICATIONS AFTER FINAL ACCEPTANCE (QA/QC Mgrs SEE ALSO SAIC-W-2036, SAIC-W-2013 & SAIC-W-2015)
Engineering Change Notice Procedure* covers such work.
Sch Q, Att. VI
SAIC-W-2036 is followed relative to Rework/Repairs
Tables
D1 SAIC-W-2013 is followed relative to Repairs.
Special
ID, Numbering, NDE & Special Processes are
Process
controlled.
REMARKS:
Page 5 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005) REV 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Weld ID & Traceability, Process Control
SAIC-W-2008 1-Dec-06 WELD-
Tracking (SAEP-1160 Database)
Attachment 1 - SAEP-1160 DATABASE, PROCESS CONTROL TRACKING (By Weld)