Вы находитесь на странице: 1из 10

Republic of the Philippines

Department of Education
Region V – Bicol
Schools Division Office
Camarines Norte
Paracale District
PALANAS ELEMENTARY SCHOOL

OFFICE PERFORMANCE COMMITMENT


AND REVIEW FORM (OPCRF)
SY 2017-2018

ANTONIO R. NAING JR.


Teacher-in-charge
OFFICE PERFORMANCE COMMITMENT AND REVIEW FORM (OPCRF)
Name of School Head: ANTONIO R. NAING JR. Name of Rater: WILFREDO J. GAVARRA
Position: Teacher-in-charge Position: Assistant Schools Division Superintendent
School: Palanas Elementary School Date of Review: ____________________________
Rating Period: June 2017-April 2018

KEY RESULTS TIME LINE WT. PER KEY PERFORMANCE INDICATORS ACTUAL RATING SCORE
MFO AREAS OBJECTIVES KRA/OBJ RESULTS
Q E T Q E T AVE
BASIC INSTRUCTIONAL 1.Conducted data driven June 2017- 25% 40% 5- 5 of 5 indicators were 5- 8 of 8 teachers
EDUCATION LEADERSHIP Monthly Instructional April 2018 met were observed
SERVICES Supervision to all teachers 4- 4 of 5 indicators were 4- 6 of 8 teachers
(100%) met were observed
 Approved 3- 3 of 5 indicators were 3 – 5 of 8 teachers
Supervisory Plan met were observed
 Supervisory 2- 2 of 5 indicators were 2 – 2 of 8 teachers
Accomplishment met were observed
Report 1-1 of 5 indicators was 1 – 0 of 8 teachers
 Observation Tool met were observed
 Record of Technical
Assistance

2.Attained desired March 0%


NAT6/LAPG3 Mean 2018
Performance Score of 75%
thru the implementation of
the following interventions/
programs/activities:
Peer Mentoring

3.By the end of SY 2017- June 2017- 15% 5- 5 of 5 interventions 5 – 0% Dropout


2018, the desired Dropout April 2018 were implemented Rate
Rate of zero (0%) was 4- 4 of 5 interventions 4 – 0.01% - 2%
attained thru the were implemented increased
implementation of the 3- 3 of 5 interventions 3 – 2.01% - 4%
following: were implemented increased
 Reading Program 2- 2 of 5 interventions 2 – 4.01% - 6%
 Home Visitation were implemented increased
 Deworming 1- 1 of 5 interventions 1 – 6.01% and
 Feeding Program were implemented above increased

LEARNING 1.By the end of March 2017 June 2017- 10% 20% 5-5 indicators were met 5-5
ENVIRONMENT the following school April 2018 4-4 indicators were met Construction
facilities were installed: 3-3 indicators were met completed at
 School Marker 2-2 indicators were met the end of
 MRF 1-1 indicator was met September
 Hand Washing 4-4
Facility Construction
 Gulayan Sa Paaralan completed first
 School Garden week of
with the following October
indicators: 3-3
 Complete Construction
 Durable completed at
 Painted the end of
 Used standard October
materials 2-2
 Used economical Construction
materials completed first
week of
November
1-1
Construction
completed last
week of
November
2. Implemented the June 2017- 5% 5-all programs, projects 5-submitted
following programs and April 2018 and activities were accomplishment
projects with submitted implemented report on or
accomplishment report. 4-4 programs, projects before the due
 Early enrolment and activities were date
 Brigada Eskwela implemented 4- submitted
 Computer set 3-3 programs, projects accomplishment
 Buzzer and activities were report 5 day
 Flower boxes implemented after the due
2-2 programs, projects date
and activities were 3- submitted
implemented accomplishment
1-1 program, project and report 7 days
activity were implemented after the due
date
2- submitted
accomplishment
report 2 weeks
after the due
date
1- No Submitted
accomplishment
3. By the end of SY 2017- June 2017- 5% 5 – constructed 1 5 – constructed
2018 the school constructed April 2018 makeshift classroom with temporary
1 makeshift classroom for 3 indicators perimeter fence
the pupils 4- constructed 1 makeshift last week of
classroom with 2 March 2018
with the following indicators 4- constructed
indicators: 3 – constructed 1 temporary
 Complete makeshift classroom with perimeter fence
 Durable 1 indicator on May 2018
 Painted 2- constructed 1 makeshift 3- constructed
classroom but not durable temporary
 Used standard
1-No makeshift classroom perimeter fence
materials was constructed on June 2018
2- constructed
 Used economical
temporary
materials
perimeter fence
on July 2018
1-5 constructed
temporary
perimeter fence
on August 2018
HUMAN 1.By the end of the SY 2017- June 2017- 2% 10% 5- 8 teachers were 5. Provided
RESOURCE 2018, technical assistance April 2018 provided technical technical
MANAGEMENT was provided to 8 teachers assistance through assistance to 8
AND on matters pertaining 4- 6 teachers were teachers
DEVELOPMENT classroom management, provided technical 4. Provided
skills and instructional assistance through technical
competence to improve 3- 4 teachers were assistance to 6
pupils performance through: provided technical teachers
 SLAC on ICT assistance through 3. Provided
2- 2 teachers were technical
 INSET provided technical assistance to 4
 SLAC on ELLNP assistance through teachers
 Capacity building- 1- No technical 2. Provided
activities thru 2nd assistance was technical
Foundation Day provided assistance to
2teachers
1. No technical
assistance was
provided
2. Conducted 2 School Based October 5% 5- Conducted 2 5- Conducted
Training/ seminars by 2017 School Based 2 School
October 2016 with: Trainings/Seminars Based
with approved Training/
 Approved Proposal
Seminars On
 Approved Training Proposal, Training
October 2016
Implementation Implementation Plan, 4- Conducted
Plan Accomplishment 2 School
 Approved report Based
Accomplishment 4- Conducted 1 Training/
report School Based Seminars on 1
Trainings/Seminars weeks late
with approved 3 -Conducted
Proposal, Training 2 School
Implementation Plan Based
Training/
3- Conducted 2
Seminars on 2
School Based weeks late
Trainings/Seminars 2-Conducted 2
with only one School Based
approved Proposal, Training/
Training Seminars on 3
Implementation Plan, weeks late
Accomplishment Conducted 2
report School Based
2- Conducted 1 Training/
Seminars on 4
School Based
weeks late
Trainings/Seminars 1-Conducted 2
with only one School Based
approved Proposal, Training/
Training Seminars on 3
Implementation Plan, weeks late
1- No school Based Conducted 2
INSET School Based
Training/
Seminars on 5
weeks late

3.By the end of the SY 2017- June 2017- 3% 5- 8 teachers encouraged 9- 10 teachers
2018 Encouraged 10 April 2018 to attend required applied the
teachers to attend required meetings/ conferences learning’s in
meetings/ conferences and and seminars/Workshop meetings/
seminars/Workshop to 4- 6 teachers encouraged conferences and
improved teachers’ teaching to attend required seminars/Workshop
skills and competencies meetings/ conferences 6- 8 teachers
and seminars/Workshop applied the
3- 5 teachers encouraged learning’s in
to attend required meetings/
meetings/ conferences conferences and
and seminars/Workshop seminars/Workshop
2- 4 teachers encouraged 5- 6 teachers
to attend required applied the
meetings/ conferences learning’s in
and seminars/Workshop meetings/
1. 3 and below teachers conferences and
encouraged to attend seminars/Workshop
required meetings/ 3- 4teachers
conferences and applied the
seminars/Workshop learning’s in
meetings/
conferences and
seminars/Workshop
1- 3 teachers and
below teachers
applied the
learning’s in
meetings/
conferences and
seminars/Workshop

PARENTS 1. By the end of school year June 2017- 3% 10% 5- 4 GAM were conducted 5- On scheduled
INVOLVEMENT 2017-2018, 4 General April 2018 4-3 GAM were conducted date
AND Assembly Meeting were 3-2 GAM were conducted 4-3 day after
COMMUNITY conducted to inform/update 2-1 GAM were conducted the scheduled
PARTNERSHIP stakeholders about the 1- 0 GAM were conducted date
school operations and 3-5 days after
performance. the scheduled
date
2-7 days after
the scheduled
date
1-10 days after
the scheduled
date
2.) By the end of school year June 2017- 5% 5-Acquired/utilized worth 5-Acquired and
2017-2018, April 2018 70,000.00 for the utilized by the
acquired/utilized 70,000.00 improvement of school end of Dec.
donations thru PTA and facilities/classrooms and 2016
other stakeholders for the school teaching learning 4-Acquired and
improvement of school process. utilized by the
facilities/classrooms and 4- Acquired /utilized end of Jan. 2017
school teaching learning worth 60,000.00 for the 3- Acquired and
process. improvement of school utilized by the
facilities/classrooms and end of Feb.
school teaching learning 2017
process. 2- 4 Acquired
3-Acquired /utilized worth and utilized by
50,000.00 for the the end of
improvement of school March 2017
facilities/classrooms and 1- 5 Acquired
school teaching learning and utilized by
process. the end of April
2- Acquired /utilized 2017
worth 40,000.00 for the
improvement of school
facilities/classrooms and
school teaching learning
process.
1- Acquired utilized worth
30,000.00 below for the
improvement of school
facilities/classrooms and
school teaching learning
process.
3.)By the end of school year June, 2017 2% 5- Encouraged and 5- Encouraged
2017-2018, encouraged to March, participated in 5 activities parents
stakeholder’s participation 2018 4- Encouraged and participation
in the different mandated participated in 4 activities twice a month
school activities; 3- Encouraged and in every activity
 Brigada Eskwela participated in 3 activities 4- Encouraged
 Gulayan sa Paaralan 2- Encouraged and twice in two
 Halamanan sa participated in 2 activities months
Paaralan 1: Encouraged and 3- Encouraged
 GPTA Meeting participated in 1 activity twice in three
months
2- Encouraged
twice in four
months
1-Encouraged
twice in five
months

SCHOOL 1. By the end of School year June to 10% 5-all programs, projects 5-5 indicators were
LEADERSHIP, 2017, conducted five school December, and activities were met
MANAGEMENT program and fund raising 2017 implemented 4-4 indicators were
AND activities to sustain the 4-4 programs, projects met
OPERATION continuous school and activities were 3-3 indicators were
improvement, staff capacity implemented met
building and improvement 3-3 programs, projects 2-2 indicators were
learners academic and activities were met
performance level. Program implemented 1-1 indicator was
and activities are the 2-2 programs, projects met
following: and activities were
 2nd Palanas implemented
elementary School 1-1 program, project and
Foundation Day activity were implemented
 ICT training of
teachers
 Makeshift
Construction
 Action research
with the following
indicators:
 Approved proposal
of Program and
activities
 Implemented the
program and
activities
 Generated Funding
for CI of the school
 Capacitated the LGU
Funded Teachers in
K-12 Curriculum

2.By the end of SY 2017- June 2017- 5% 20% 5- 5 out of 5 required 5- Required
2018, be able to submit the April 2018 reports were submitted reports were
required reports to the SDO 4- 4 out of 5 required submitted on
 Accomplishment reports were submitted time
report 3- 3 out of 5 required 4- Required
 Supervisory plan reports were submitted reports were
 School Form 4 2- 2 out of 5 required submitted 7
 School Form 7 reports were submitted days late
 Master class 1- 1 out of 5 required
program reports was submitted 3- Required
reports were
submitted 10
day late

2- Required
reports were
submitted 13
day late

1- Required
reports were
submitted 15
days and above
late

3.) By th end of SY 2017- June 2017- 5% 5- Attend 5 5- Attend 3 Division


2018 Attend April 2018 Seminars/trainings Seminars/trainings
Seminars/trainings workshop Sponsored by workshop
workshop Sponsored by DepEd. Sponsored by
DepEd. 4- Attend 4 DepEd.
Seminars/trainings 4- Attend 2 Division
workshop Sponsored by Seminars/trainings
DepEd. workshop
3 Attend 3 Sponsored by
Seminars/trainings DepEd.
workshop Sponsored by 3 Attend 3 District
DepEd. Seminars/trainings
2- Attend 2 workshop
Seminars/trainings Sponsored by
workshop Sponsored by DepEd.
DepEd. and 2- Attend 2 District
1-Attend 1 Seminars/trainings
Seminar/training workshop
workshop Sponsored by Sponsored by
DepEd.0 thousand below DepEd. and
1-No
Seminar/training
workshop
Sponsored by
DepEd.
100%
*To get the score, the rating is multiplied by the weight assigned. OVERALL
RATING

ANTONIO R. NAING JR. WILFREDO J. GAVARRA WILFREDO J. GAVARRA


Ratee Rater Approving Authority

Вам также может понравиться