Вы находитесь на странице: 1из 2

Doc. no.

SW -CL-38
Project: NH:37 Contract package – EW – II (AS-02/AS-18)
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(After painting and assembling at site) Ref. RFI.
No:

Location : Girder No:


Date : Item No:
Time :

Item Description CON CON SC Remarks

Y N Y N Y N
A) Final paint – One coat at Bridge Site
1 Is the prime coat fully dried before application of
Aluminum paint?
2 Type and commercial name of the paint?
3 Is the field- contact surfaces and surfaces that are to
be brought in contact with cement has been left
during painting?
4 Is the paint applied by spray / brush?
5 Is the inaccessible areas are coated by brushing
before application of painting?
6 Is the DFT tested? If yes, what is the average
thickness?
7 Is there any wrinkled, blistered coating, coating with
pin-holes, sags, lumps and other blemishes visible?
B) Assembling at site
1 Is the entire assembly in same line and in same
level?
2 Is the assembled section as per the approved
drawing?
3 Are all the dimensions as per approved drawing?
4 Are all the drills in correct distance from C/L of the
bearing as shown in the approved drawing?
5 Is there any mismatch in adjacent bolt holes?

6 Is the cross girder position as per drawing?


7 Are all bolts provided as per approved drawing ?
8 Tension / Torque in bolts are as per codal provision ?

Can the finished girder be allowed for erection? Yes No

138
Doc. no. SW -CL-38
Project: NH:37 Contract package – EW – II (AS-02/AS-18)
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(After painting and assembling at site) Ref. RFI.
No:

Signed for Contractor ________________________ Designation : ________________________ Date: ___________________

Signed for SC _______________________ Designation: _______________________ Date: ___________________