Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

SW-CL -41
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Random Checking of RE Wall Panel
No:

Location : Type of panel :


Date : Nos. of Panel :
Time :

Item Description CON CON SC Remarks


Yes No Y N
Shuttering & Reinforcements
1 Size & Shape of Panel in accordance to drawings?
2 Surface of Mould is smooth & clean?
3 Rebar tested and approved?
4 Rebar size & placing checked?
5 Cover of rebar checked?
6 Lug position checked?

Concreting
7 Lighting arrangement adequate?
8 Vibrator applied?
9 Slump Checked?
10 Source of concrete approved?
11 Grade of concrete?
12 Cube moulds taken?

Post Concreting (Stock Pile)


13 Surface finish & texture good?
14 Adequate curing is done (14 day’s)?
15 During lifting any damage / distress is seen?
16 Any patchwork done?
17 Patchwork acceptable?

Numbers of Panels checked & approved.


Cumulative Nos. checked & approved.
Cumulative Nos. completed.

Remarks:

Signed for contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate