Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

PC-CL-13 -1
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Bituminous Course Laying
No:

Location : CH __________ to CH __________ Other Information:

Mix Type: DBM /AC

Source:

Item Description CON CON SC Remarks


Yes No Y N

A Pre-laying
1 General Conditions
a) Weather okay?
b) Flood light in order for night work?

2 Surface Preparation Check


a) Underlying layer approved / in order?
b) Surface with prime coat / tack coat?
c) No free standing water?

3 Level Control And Alignment


a) Paving width checked?
b) Sensor wires checked?
c) Stringline checked?
d) Rolling to start from lower to higher?

4 Equipment Check (by Site


Foreman )
a) Screed extension set?
b) Screed heated?
c) Vibration / tamping systems check?
d) Gradeline sensor checked?
e) Slope sensor checked?
f) Sonic sensor checked?
g) Sensitivity checked?
h) Fuel and lubrication checked?
i) Augers and conveyors checked?
j) Roller fill with water?
k) Roller spray nozzles and sprinkle system
Checked?
l) Scrapper and wetting pads in good
condition?
m) Roller vibration system checked?
n) Steel drums straight across and free from
o) Hydraulic systems checked? i.e. screed,
hoppers and gates.
p) Tyre roller air pressure checked?
r) Power broom in order?
s) Air compressor in order?

Item Description CON CON SC

108
Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no. PC-CL-13 -1
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Bituminous Course Laying
No:

Remarks
YES NO Y N
5 Construction Joints
a) Joints cut and coated, if any?
b) Longitudinal joints offset at least 100 mm
from underlying layer
c) Transverse joints offset by minimum
0.5mm

6 Final Inspection
(with comments)
P F Date.

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate

109