Вы находитесь на странице: 1из 1
aby [ae [checked By: [Date faa Lob Tite [lob Nor Rew [001 SENSE Wes FR as t }SaB Manual %HL=[_2aialunitess Percentage of Lateral Force fo Vieg wow see Aopen 1.4 Too of Sanda Brae =| lunivess Jack is Braced or Un- Braced atte lites First ledger evel one cup down? STExt Im Total Distance of Jack Extension Tut Im Top it Distance t Tied lm Total Distance trom 1st ledger to the Braced Jack ve kn Permissible Load (Top Standard) 1.2 Botiom ot Standard Brac lunitoss Jacki Bracod or Un: Braced? ated =| lunitoss Fst ledger level one cup down? ' 1B Ext Im Total Distance of lack Extension Bui Im Base Lit Distance en B0_tea =| Im Total Distance tom tet ledger tothe Braced Jack _ Ve=[_2700/tN Permissible Load (Botom Standard) 1.3 Main Lit M_Litt: Im ‘Main Lift Distance q Vm-=|_—57.00/tN _Permissibe Load (Main Lit) = 1.4 Permissible Load (Lowest Vt. Vim, Vb} ‘vodoor: Vall=[__27.00}N Design Permissible Load UN-BRACED BRACED a Vlog Vlog Vlog Vieg Veg |S**2utine vg 2.1 Plan ‘Spacing of Post along X-direction ‘Spacing of Pest along ¥-direction Tributary Area ‘Number of Braced Post Bay stance along X-airection max) Litt distance along Y-drecion (max) Height of the Tower Assembly 3 Length or Width of Braced post (max) 3 PECTIN see tossing 31 Don Laas [asumeson and IF_Load Formwork Load comeinaisn [S_Load Dead Load ILoad Impact Load 32 Live fe toad Construction Live Load (Heavy Duty) lrsce 7-02 abi 2 od luniless Load Factor fr Dead Load |rci347-06 ot lnitoss Load Factor torLive Load wet. kPa Utimate Construction Load eT “4:1 Verical Load, Veg Weg =[_—1050}N Tota’ Vertical Force R supp 42 Horzontal Load HL HLs[—079)kN Tota Lateral Force 4a Roasion a Support Ih supp af TTAB KN. Maximum Reaction at Support 4.4 Force af Coupler: KN Total Force at Coupler (Allowable = 12.54 Utilization Post=[ OK lunitess SG8 Post Check 0.48. Coup =[__OK unites Coupler Check ‘007, SECTION AA

Вам также может понравиться