TAPI/TPSC

Serial No. ______________

HOT WORK PERMIT


HOT WORK SHOULD NOT COMMENCE UNTIL STAGE 1 TO 3 ARE DULY COMPLETED AND SIGNED BY RESPECTIVE PERSONNEL

STAGE 1 REQUESTED BY SUPERVISOR / TRADE FOREMAN NAME OF CONTRACTOR / COMPANY


PROJECT COMMENCEMENT DATE / /
TIME HRS
LOCATION COMPLETION DATE / /
TIME HRS
DESCRIPTION OF HOT WORK (gouging / burning / welding / preheating / brazing / grinding)

I have (1) highlighted the work at the Project Safety Coordination Committee Meeting and it has been coordinated.
(2) ensured that the hot-work area mentioned above and its surroundings are free of combustible and flammable materials.
(3) ensured compliance with the under-mentioned requirements prior to the commencement and during hot work.

Prominently display ‘hot-work’ permit with sketch sketch

Risk Assessment for the work has been carried out and briefed to the workers

Supply of sufficient forced ventilation, provision of adequate lighting

Gas hoses checked, tested and no leak.

Welding cables & electrode holders checked, and tested, welding sets earthed

Presence of appointed fire watchman and fire fighting equipment

Pre-job briefing will be conducted for all personnel involved in the operation

NAME :______________________________DESIGNATION:___________________________

SIGNATURE : ________________DATE : ___________________ TIME : ________________

Please tick the applicable requirements in the appropriate boxes.

STAGE 2 ENDORSEMENT BY SAFETY ASSESSOR (HOT-WORK TRADE)

I have (1) familiarised myself with the work schedule; and


(2) together with the applicant for the hot-work permit, made a proper inspection and assessment of the hot-work area and its surroundings and
(3) confirmed that the necessary safety requirements have been complied with; and
(4) confirmed that adequate safety measures have been taken

I hereby endorse the permit

COMMENTS: ______________________________________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________________________________________________

NAME: ____________________________________________________ SIGNATURE: _________________________ DATE: ________/_________/_________ TIME: ___________________ HRS

STAGE 3A APPROVAL BY THE PROJECT SAFETY COORDINATION COMMITTEE. CHAIRMAN

I have: (1) evaluated the hazards and the risks associated with the work
(2) coordinated the work activities on the project at the Project Safety Coordination Committee Meeting to ensure that no incompatible work will be carried out by all parties working on the
project.
(3) counter checked that all certificates issued earlier for incompatible operations have been withdrawn
(4) proper assessment of the hot-work area and its surroundings have been made so that the hot-work can be carried out safely.

I hereby approve the hot work

NAME: ____________________________________________________ SIGNATURE: ________________________ DATE: ________/________/___________TIME: ____________________HRS

STAGE 3B ACKNOWLEDGEMENT BY CONTRACTOR FOREMAN / SUPERVISOR

I hereby acknowledge that I understand the briefing conducted by the applicant of the permit on the safety measures to be taken for the work and I shall ensure compliance. I also undertake to brief all
my workers before commencement of the work.

__________________________________________ ________________________________________ ___________________________ ________/_______/________


NAME OF CONTRACTOR NAME OF CONTRACTOR’S SUPERVISOR SIGNATURE DATE

STAGE 4 NOTIFICATION OF COMPLETION OF HOT-WORK BY TRADE FOREMAN

The above mentioned ‘hot-work’ was completed on _______ /______ /___________ at ___________________ hours
NAME: ____________________________________________________ SIGNATURE: _________________________ DATE: ________ /_______ /__________ TIME : __________________ HRS

DAILY ENDORSEMENT BY THE PROJECT SAFETY COORDINATION COMMITTEE CHAIRMAN

DATE / TIME
SIGNATURE

(Requestor Copy to be returned upon completion)

P3-S04-F10 Rev 01/2013