Name of
M/S Abhi Engg Corporation Pvt Ltd Page No.
Customer
404,405 ARTMENT 4TH Floor Law College
Address of
Square, WHC Road Dharampeth Nagpur Report No.
Customer
440010
Name of
Nil. Report Date
Agency
Construction of CC Road Under Phase III in Customer
Name of Work
Nagpur City Ref No.
Ultra tech OPC 53 Cement, Flyash,
Sample 22mm ,10mm (CA) & Natural sand, BIPL Ref No.
Description crushed sand (FA) (1 Bag Each)
Dt. of Test
From 14/02/2019 Onwards Test Method
Conducted
Percentage Required per one cum of CA&FA aggregate (As Per Blending P
554
2/21/2019
Nill
Nil
IRC SP 049:2014
Grading II
Remark
% by wt of Total Dry Material
Remarks
IRC SP 049:2014
Remarks
IS 383 2016
IRC SP 049:2014
-
Remarks
IS 383 2016
IRC SP 049:2014
-
Remarks
Retained
2 of 5
Blending of DLC Mix Design
19.0 65.36 100.00 100.00 100.00 24.84 22.00 20.00 20.00 86.84 85.00 75 95
9.5 0.04 86.31 100.00 100.00 0.02 18.99 20.00 20.00 59.00 60.00 50 70
4.75 0.00 1.56 91.10 94.92 0.00 0.34 18.22 18.98 37.55 42.50 30 55
2.36 0.00 0.00 77.51 58.40 0.00 0.00 11.68 11.68 23.36 29.50 17 42
0.600 0.00 0.00 39.19 20.22 0.00 0.00 7.84 4.04 11.88 15.00 8 22
0.300 0.00 0.00 31.54 15.40 0.00 0.00 6.31 3.08 9.39 12.00 7 17
0.150 0.00 0.00 7.53 8.50 0.00 0.00 1.51 1.70 3.21 7.00 2 12
0.075 0.00 0.00 3.68 1.38 0.00 0.00 0.736 0.28 1.01 5.00 0 10
120
Lower
Limit
100 Upper
Limit
Mid Limit
80
% Passing
60
40
20
0
0.0 0.1 1.0 10.0 100.0
Sieves in mm
3 of 5
DATA SHEET FOR DENSITY-MOISTURE CONTENT OF DLC
Material Source (CA) AEC Metal Type of cement Ultra tech (OPC-53)
Material Source (FA) AEC Metal & Kanhan River Cement and
1:14
Aggregate Ratio
Maximum Density (gm/cc) = 2.585 OMC (%) = 5.90
% of Water Wt of Wet Sample Volume of Wet Density Dry Density Average Dry
Remarks
Added (gm) Mould (cc) (gm/cc) (gm/cc) Density (gm/cc)
9045 3375 2.680 2.552
5.00 8878 3375 2.631 2.505 2.538
9058 3375 2.684 2.556
9125 3375 2.704 2.563
5.50 9186 3375 2.722 2.580 2.571
9155 3375 2.713 2.571
9202 3375 2.727 2.572
6.00 9268 3375 2.746 2.591 2.583
9255 3375 2.742 2.587
9155 3375 2.713 2.547
6.50 9014 3375 2.671 2.508 2.534
9152 3375 2.712 2.546
9045 3375 2.680 2.505
7.00 8925 3375 2.644 2.471 2.490
9011 3375 2.670 2.495
DENSITY GRAPH
2.65
2.6
Dry Density
2.55
2.5
2.45
4 4.5 5 5.5 6 6.5 7 7.5 8
% Water content
4 of 5
COMPRESSIVE STRENGTH OF DLC CUBE
( As per IS : 516 )
Grade of Concrete DLC Cementious : Aggregate Ratio 1:14
Type of Cement Ultra tech OPC-53 Cementious Content (Per M3) 161
5 of 5
Material Source (CA) :- Samadatola Stone Quarry (Near Burhar)
Material Source (FA) :- Samadatola Stone Quarry (Near Burhar)
Summary of DLC Sieve Analysis Test Reports
AVERAGE % OF PASSING (25MM)
% of Passing
Sieve Size mm Average %
Sample - 1 Sample - 2 Sample - 3 Sample - 4 Sample - 5 Passing
sample No. :- 1 Total wt. (gms) :- 26815 sample No. :- 2 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
sample No. :- 3 Total wt. (gms) :- 24916 sample No. :- 4 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
29.10.2015
30.10.2015
%cum.
% passing
Retained
0.00 100
50.75 49.25
98.68 1.32
99.59 0.41
%cum.
% passing
Retained
0.00 100
46.83 53.17
97.19 2.81
98.95 1.05
For Authority Engineer Rep.
10 mm DLC Sieve Analysis Test Reports
sample No. :- 1 Total wt. (gms) :- 16305 sample No. :- 2 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
sample No. :- 3 Total wt. (gms) :- 15928 sample No. :- 4 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
29.10.2015
30.10.2015
%cum.
% passing
Retained
0.00 100
0.00 100.00
4.73 95.27
97.36 2.64
98.92 1.08
%cum.
% passing
Retained
0.00 100
0.00 100.00
6.45 93.55
97.59 2.41
99.18 0.82
For Authority Engineer Rep.
SUMMARY OF DLC - 01
1) DLC MIX DESIGN (BLENDING)
Material Percentage Source
25 mm Aggregate 38% Samadatola Stone Quarry (Near Burhar)
10 mm Aggregate 22% Samadatola Stone Quarry (Near Burhar)
Crushed Sand 40% Samadatola Stone Quarry (Near Burhar)
2) ALL In Aggregate Gradation for Dry Lean Concrete
SIEVE SIZE LIMIT AS PER MORT&H TABLE
% OF PASSING Remarks
(mm) 600-1
Remarks:
Remarks:
Remarks:
Remarks:
Remarks:
sample No. :- 1 Total wt. (gms) :- 1594 sample No. :- 2 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
sample No. :- 3 Total wt. (gms) :- 1874 sample No. :- 4 Total wt. (gm
IS Sieve Size weight of mat. cumm.wt. %cum. IS Sieve Size weight of mat. cumm.wt.
% passing
(mm) Retained retained Retained (mm) Retained retained
EPC CONTRACTOR
29.10.2015
30.10.2015
%cum.
% passing
Retained
0.00 100
0.00 100.00
0.00 100.00
7.27 92.73
23.84 76.16
62.77 37.23
73.54 26.46
88.68 11.32
95.46 4.54
%cum.
% passing
Retained
0.00 100
0.00 100.00
0.00 100.00
5.76 94.24
21.39 78.61
58.06 41.94
72.06 27.94
86.36 13.64
93.52 6.48
For Authority Engineer Rep.
MADHYA PRADESH ROAD DEVELOPMENT
DILIP BUILDCON LIMITED CORPORATION LIMITED
Rehabilitation and Up-gradation Two lane with paved shoulders of Shahdol-Anooppur-MP/Chhattishgarh Border Section (km
142/2 to km 245/00) of NH – 78 Design Length 91.80 km. in the State of Madya Pradesh on Engineering Procurement and
Construction (EPC) Mode
CLIENT AUTHORITY ENGINEER EPC CONTRACTOR
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. LTD. DILIP BUILDCON LIMITED
CORPORATION LIMITED
AGGREGATE IMPACT VALUE
IS: 2386 (Part 4) 1963
Date of sampling 29.10.2015
Source Samadatola Stone Quarry (Near Burhar)
Date of testing 01.11.2015
Sampling
Stock Yard (159+000 LHS DBL Camp 1 Near Burhar) Type of material Aggregate
Location
Weight of oven dry sample (A) gms 378 381 375 387 384
Impact Value = (C/A) x100 % 11.11 10.76 10.67 12.40 11.46 11.28
Remarks :-
For EPC Contractor Rep. For Authority Engineer Rep.
MADHYA PRADESH ROAD DEVELOPMENT
DILIP BUILDCON LIMITED CORPORATION LIMITED
Rehabilitation and Up-gradation Two lane with paved shoulders of Shahdol-Anooppur-MP/Chhattishgarh Border Section (km 14
to km 245/00) of NH – 78 Design Length 91.80 km. in the State of Madya Pradesh on Engineering Procurement and Constructio
(EPC) Mode
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. LTD. DILIP BUILDCON LIMITED
CORPORATION LIMITED
FLAKINESS INDEX
IS: 2386 (Part 1) 1963
Source Samadatola Stone Quarry (Near Burhar) Date of sampling 29.10.2015
Sampling Location Stock Yard (159+000 LHS DBL Camp 1 Near Burhar) Date of testing 01.11.2015
FLAKINESS
7.87 6.44 7.61 8.14 6.99
INDEX (%)
Remarks :-
For EPC Contractor Rep. For Authority Engineer
MADHYA PRADESH ROAD DEVELOPMENT
CORPORATION LIMITED
EPC CONTRACTOR
01.11.2015
Coarse Aggregate
Average
7.41
For Authority Engineer Rep.
MADHYA PRADESH RO
DILIP BUILDCON LIMITED DEVELOPMENT CORPORA
LIMITED
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. DILIP BUILDCON LI
CORPORATION LIMITED LTD.
Date of Testing: 01.11.2015 Sample Location: Stock Yard (159+000 LHS DBL Camp 1 Ne
Mass of
Mass of Wt.of Aggregate
Aggregate Weighted
Aggregate in passing through X=(B/A)*100 Y=(A/∑A)*100 retained on
Sieve size(mm) Flakiness
each thickness gauge
thickness Index=XY
fraction(A) (C)
gauge(B)
50mm-40mm - - - - - -
40mm-31.5mm - - - - - -
31.5mm-25mm - - - - - -
Elongation Index=(∑D/∑C)*100= -
Total =
For EPC Contractor Rep. For Authority Engine
MADHYA PRADESH RO
DILIP BUILDCON LIMITED DEVELOPMENT CORPORA
LIMITED
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. DILIP BUILDCON LI
CORPORATION LIMITED LTD.
Date of Testing: 01.11.2015 Sample Location: Stock Yard (159+000 LHS DBL Camp 1 Ne
Mass of
Mass of Wt.of Aggregate
Aggregate Weighted
Aggregate in passing through X=(B/A)*100 Y=(A/∑A)*100 retained on
Sieve size(mm) Flakiness
each thickness gauge
thickness Index=XY
fraction(A) (C)
gauge(B)
50mm-40mm - - - - - -
40mm-31.5mm - - - - - -
31.5mm-25mm - - - - - -
Elongation Index=(∑D/∑C)*100= -
Total =
MADHYA PRADESH RO
DILIP BUILDCON LIMITED DEVELOPMENT CORPORA
LIMITED
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. DILIP BUILDCON LI
CORPORATION LIMITED LTD.
Date of Testing: 01.11.2015 Sample Location: Stock Yard (159+000 LHS DBL Camp 1 Ne
50mm-40mm - - - - - -
40mm-31.5mm - - - - - -
31.5mm-25mm - - - - - -
Elongation Index=(∑D/∑C)*100= -
Total =
MADHYA PRADESH RO
DILIP BUILDCON LIMITED DEVELOPMENT CORPORA
LIMITED
Date of Testing: 01.11.2015 Sample Location: Stock Yard (159+000 LHS DBL Camp 1 Ne
Mass of
Mass of Wt.of Aggregate
Aggregate Weighted
Aggregate in passing through X=(B/A)*100 Y=(A/∑A)*100 retained on
Sieve size(mm) Flakiness
each thickness gauge
thickness Index=XY
fraction(A) (C)
gauge(B)
50mm-40mm - - - - - -
40mm-31.5mm - - - - - -
31.5mm-25mm - - - - - -
Elongation Index=(∑D/∑C)*100= -
Total =
For EPC Contractor Rep. For Authority Engine
MADHYA PRADESH RO
DILIP BUILDCON LIMITED DEVELOPMENT CORPORA
LIMITED
MADHYA PRADESH ROAD DEVELOPMENT THEME ENGINEERING SERVICES PVT. DILIP BUILDCON LI
CORPORATION LIMITED LTD.
Date of Testing: 01.11.2015 Sample Location: Stock Yard (159+000 LHS DBL Camp 1 Ne
Mass of
Mass of Wt.of Aggregate
Aggregate Weighted
Aggregate in passing through X=(B/A)*100 Y=(A/∑A)*100 retained on
Sieve size(mm) Flakiness
each thickness gauge
thickness Index=XY
fraction(A) (C)
gauge(B)
50mm-40mm - - - - - -
40mm-31.5mm - - - - - -
31.5mm-25mm - - - - - -
Elongation Index=(∑D/∑C)*100= -
ur-MP/Chhattishgarh
State of Madya Pradesh
EPC CONTRACTOR
P BUILDCON LIMITED
Wt.of aggregate
retained on length
gauge ( D )
-
thority Engineer Rep.
RADESH ROAD
NT CORPORATION
MITED
ur-MP/Chhattishgarh
State of Madya Pradesh
EPC CONTRACTOR
P BUILDCON LIMITED
Wt.of aggregate
retained on length
gauge ( D )
-
-
RADESH ROAD
NT CORPORATION
MITED
ur-MP/Chhattishgarh
State of Madya Pradesh
EPC CONTRACTOR
P BUILDCON LIMITED
RADESH ROAD
NT CORPORATION
MITED
ur-MP/Chhattishgarh
State of Madya Pradesh
EPC CONTRACTOR
P BUILDCON LIMITED
Wt.of aggregate
retained on length
gauge ( D )
-
thority Engineer Rep.
RADESH ROAD
NT CORPORATION
MITED
ur-MP/Chhattishgarh
State of Madya Pradesh
EPC CONTRACTOR
P BUILDCON LIMITED
Wt.of aggregate
retained on length
gauge ( D )
-
thority Engineer Rep.
MADHYA PRADESH ROAD DEVELOPMENT
DILIP BUILDCON LIMITED CORPORATION LIMITED
Average Silt
Sample No. 1 2 3 4 5
Content %
Remark
For EPC Contractor Rep. For Authority Engineer Rep.
MADHYA PRADESH ROAD
DILIP BUILDCON LIMITED DEVELOPMENT CORPORATION
LIMITED
Remarks :
For EPC Contractor Rep. For Authority Engineer Rep.
MADHYA PRADESH ROAD
DILIP BUILDCON LIMITED DEVELOPMENT CORPORATION
LIMITED
Remarks :
For EPC Contractor Rep. For Authority Engineer Rep.
MADHYA PRADESH ROAD
DILIP BUILDCON LIMITED DEVELOPMENT CORPORATION
LIMITED
AVERAGE % OF PASSING
% of Passing
Average %
Sieve Size mm
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Passing