PROJECT
CLIENT
CLIENTS CONSULTANT
CENTRAL ELECTRICITY AUTHORITY
CONTRACTOR
JYOTI STRUCTURES LTD
STRUCTURAL CONSULTANT
CONTENTS
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
3 11
iv)Design of Pile Cap-A+0
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
7 36
iv)Design of Pile Cap-A+3
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
11 60
iv)Design of Pile Cap-A+6
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
16 88
iv)Design of Pile Cap-B/C+0
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
20 114
iv)Design of Pile Cap-B/C+3
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
24 140
iv)Design of Pile Cap-B/C+6
I) Loading on pile cap,II) Shear on Pile, III)Check for Tesion & Compression,
28 166
iv)Design of Pile Cap-B/C+9
NORMAL CONDITION
For Base Slab Design For Column Design
Load Case & Description Moment Moment Shear Shear Force Uplift load Shear Force Shear
Vertical
Compression
about Z about X Force in X - in Z - on top of in X - Force in Z
Loads
load on top of
axis [Mz] axis [Mx] direction direction [Sz] Column direction - direction
[Sx] = Column [C] = [Fx] = [Fz] =
= = = [U] =
2a) GEOMETRY :
P P
Fx / Fz Pedestal
Ht, of =
Pedestal Concrete Top Lvl
h 0.225 m FGL 0.225
0.5
H = 1.475 m
Pile Cap
0.75 m
Cut off Level
0.075 m
L =
15.325 m
Generally as per Bore log sheets, the soil starta in top 10M of soil below G.L. at various location
is soft/medium/stiff clay.But medium clay is more prominent. Thus Probable value of K value
obtained as per Table 2 of IS:2911(Part I/Section-1)-1979 is considered as 48.79 kgf/cm2.
Thus for free head condition as per fig.4, L/D value workout to 6.5.
L/D = 6.5
Dia. Of Pile = 0.5 m
Hence L = DX 6.50
II) Forces and Moments at Bottom of Column..for Column design (Ultimate loads)
Load Load Load Load
FOR COLUMN case case case case
20 21 19 21
Vertical Load(Compression) P+
at bottom of Column = P + (Pw) = (b x d x h x 174.66 174.49 120.40 174.49 kN
S.W. of Col. 25)
U-
Uplift Load at bottom of
Column = P - S.W. of Col.
(Uw) = (b x d x h x 166.00 166.38 112.88 166.38 kN
25)
e) Mmt @ Major Axis due to min Mex kNm 3.84 3.84 2.65 3.65
f) Mmt @ Minor Axis due to min Mez kNm 3.84 3.84 2.65 3.65
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 3.84 3.84 3.34 3.65
b) Design Moment @ Minor Axi Muy kNmMz orMez+Maz 3.84 3.84 2.65 3.65
@ Major Axis
b) Referring to Interaction Diag. coef2 Mu/(fck*D* 0.06 0.06 0.055 0.06
of SP - 16, Mu / (fck*b*D )2
b)
2
@ Minor Axis
8 a) T'fore Mmnt carrying capacity Mux1 kNm coeff1*(fck 136.69 136.69 125.30 136.69
of Column @ Major Axis *b*D )
2
b) And Mmnt carrying capacity o Muz1 kNm coeff2*(fck 136.69 136.69 125.30 136.69
Column @ Minor Axis *D*b )
2
2) Total Moments for tower type "A+ 0" on Base Raft (Ultimate moments)
Load Load Load
Load
DUE TO TOWER case case case
case 20
21 19 21
Total Moment at Base along X-
22419 22419 9 22419 Kgm
Direction (Mwx) =
Total Moment at Base along Z -
40624 40664 43123 40624 Kgm
Direction (Mwz) =
1) Foundation Loads for tower type "A+ 0"(Designed loads) for Pile Cap:
Load Load Load
Load
FOR COLUMN case case case
case 20
21 19 21
Vertical loads (V) = V x F.O.S. 1245.2 1125.3 1141.8 1125.3 Kg
Shear in X-direction (Fwx) = Fwx x F.O.S. 5765.1 5765.1 5943.3 5765.1 Kg
Shear in Z-direction (Fwz) = Fwz x F.O.S. 1623.6 1623.6 0 1623.6 Kg
2) Total Moments for tower type "A+ 0" on Base Raft (Designed moments) For Pile Cap:
Load Load
Load case Load
DUE TO TOWER 20 case 21
case case
19 21
Total Moment at Base
24660.9 24660.9 9.9 24661
along X- Direction (Mwx) = Kgm
Total Moment at Base (Mwz) = 44686.4 44730.4 47435 44686 Kgm
along Z - Direction
II) PILE :-
a) Pile Data:
Diameter of Pile in mm = 500 mm
FGL
1.25m
Pile cap
b) Loading on Pile:-
Total Vertical load acting
on pile for design (P') = 326.2 kN
Load Load
TOTAL SHEAR ON PILE FOUNDATION Load case Load case case
20 case 21 19 21
Total Shear in X-Direction Fwx * N = 230.604 230.604 237.73 230.6 kN
Total Shear in Z-Direction Fwz * N = 64.944 64.944 0 64.944 kN
2 2
= Fwx + Fwz
Load Load
DIAGONAL SHEAR ON PILE FOUNDATION Load case Load case case
20 case 21 19 21
Diagonal Shear Fwd = 239.6 239.6 237.7 239.6 kN
Consider Load Case 20 & 21 for Tension & Compression calculation in End Pile
Load Case
Case 20 21
N2 x X2 = 3.92
N1 x X1 = 3.92
Fig. 2
a1 = B1xH1 = 0.52 m2
H2 = B2xB2+dXd = 0.91 m
a2 = B2 x H2 = 0.46 m2
i) For Pedestal:
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc = b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc =b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
Net compression on
= 292.50 kN
each Pile ( P )
(Factored )
Bending Moments -
Depth reqd :
Tk. of raft slab reqd. = Mmax x 106
2.76 1000
= 76 mm
Thickness assumed = d provided = 750 mm
d effective = 667 mm
--OK--
Reinforcement -
0.5 x 20 1- 1- ( 4.6xB.M.)x10 6 bd
Astreqd = 415 25 x b x d2
Reinforcement Provided :
Along Length of Pile Cap -
At top : Provide 20 F @ 180 c/c as main reinf ( 1745.329 )
Vertical Stirrups:-
Provide 12 F @ 150 c/c as dist. reinf ( 753.9822 )
Load Load
SHEAR ON EACH PILE case case Load Load
20 21 case 19 case 21
Horizontal
Shear on pile F Fwx' = 57.65 57.65 59.43 57.65 kN
for design (Fx') Np Fwz' = 16.24 16.24 0.00 16.24 kN
Moment on Pile:-
Load
TOTAL MOMENT ON PILE Load case Load Load
case 20 21 case 19 case 21
Moment on pile (Mwx') Fwx' x L/2 = 93.68 93.68 96.58 93.68 kNm
Moment on pile (Mwz') Fwz' x L/2 = 26.38 26.38 0.00 26.38 kNm
Load
PILE DESIGN Load case
case 20 21
Total vertical = 292.38 292.50 kN
(p) x F.O.S.
Load
Moment on pile (Mwx') x F.O.S. = 93.68 93.68 kNm
Moment on pile (Mwz') x F.O.S. = 26.38 26.38 kNm
4b) DESIGN OF PILES FOR VARIOUS LOAD CASES (Limit State Method):
SR. NOTA-
D E S C R I PT I O N UNIT FORMULA Load case 20 Load case 21
NO. -TION
I DESIGN DATA
Factotred Load on Pile
a) Axial load on Pile Pu kN 292.38 292.50
b) Moment @ Major Axis Mux kNm 93.68 93.68
c) Moment @ Minor Axis Muy kNm 26.38 26.38
d) Diameter of Pile D mm 500 500
e) Dia of reinf. bar F mm 16 16
f) No. of bars no. 12 12
g) Longi.reinf.in Pile Asc mm2 2413 2413
h) Unsupported length of Column
@ Major Axis lex mm 3250 3250
@ Minor Axis ley mm 3250 3250
i) Grade of Concrete fck N/mm2 M30 30 30
j) Grade of Steel fy N/mm 2
Fe415 415 415
k) Clear cover mm 50 50
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 93.68 93.68
b) Design Moment @ Minor Ax Muy kNmMy orMey+May 26.38 26.38
@ Minor Axis
NORMAL CONDITION
For Base Slab Design For Column Design
Load Case & Description Moment Moment Shear Shear Force Uplift load Shear Force Shear
Vertical
Compression
about Z about X Force in X - in Z - on top of in X - Force in Z
Loads
load on top of
axis [Mz] axis [Mx] direction direction [Sz] Column direction - direction
[Sx] = Column [C] = [Fx] = [Fz] =
= = = [U] =
a) GEOMETRY :
P P
Fx / Fz Pedestal
0.5
H = 1.625 m
Pile Cap
0.90 m
Cut off Level
0.075 m
L =
15.175 m
Generally as per Bore log sheets, the soil starta in top 15M of soil below G.L. at various location
is soft/medium/stiff clay.But medium clay is more prominent. Thus Probable value of K value
L/D = 6.5
Dia. Of Pile = 0.5 m
Hence L = DX 6.50
c) LOADING DATA:
a) Size of column
in m ( b x D ) = 0.45 x 0.45
No. of Leg / Col. = 1
II) Forces and Moments at Bottom of Column..for Column design (Ultimate loads)
Load Load Load Load
FOR COLUMN
case 20 case 21 case 18 case 20
Vertical Load(Compression) at P+
bottom of Column = P + S.W. of (Pw) = (b x d x h x 191.57 191.38 138.05 191.57 kN
Col. 25)
U-
Uplift Load at bottom of Column
(Uw) = (b x d x h x 182.15 182.52 128.89 182.15 kN
= P - S.W. of Col.
25)
Moment in X - Direction due to
(Mwx)
Fwx = (Fwx x h) 3.39 3.39 3.48 3.39 kNm
Moment in Z - Direction due to
(Mwz) = (Fwz x h) 0.83 0.83 0.00 0.83 kNm
Fwz
e) Mmt @ Major Axis due to min Mex kNm 4.21 4.21 3.04 4.01
f) Mmt @ Minor Axis due to min. Mez kNm 4.21 4.21 3.04 4.01
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 4.21 4.21 3.83 4.01
b) Design Moment @ Minor Axi Muy kNmMz orMez+Maz 4.21 4.21 3.04 4.01
@ Major Axis
b) Referring to Interaction Diag. coef2 Mu/(fck*D* 0.06 0.06 0.055 0.06
of SP - 16, Mu / (fck*b*D )2
b2)
@ Minor Axis
8 a) T'fore Mmnt carrying capacity Mux1 kNm coeff1*(fck 136.69 136.69 125.30 136.69
of Column @ Major Axis *b*D )
2
b) And Mmnt carrying capacity o Muz1 kNm coeff2*(fck 136.69 136.69 125.30 136.69
Column @ Minor Axis *D*b2)
2) Total Moments for tower type "A+ 0" on Base Raft (Ultimate moments)
Load Load
Load Load
DUE TO TOWER case 20
case
case 18
case
21 20
Total Moment at Base along X-
27042 27042 11 27042 Kgm
Direction (Mwx) =
Total Moment at Base along Z -
57045 57085 60009 57045 Kgm
Direction (Mwz) =
1) Foundation Loads for tower type "A+ 0"(Designed loads) for Pile Cap:
Load Load
Load Load
FOR COLUMN case 20
case
case 18
case
21 20
Vertical loads (V) = V x F.O.S. 1472.9 1353 1503.7 1473 Kg
Shear in X-direction (Fwx) = Fwx x F.O.S. 6623.1 6623.1 6801.3 6623 Kg
Shear in Z-direction (Fwz) = Fwz x F.O.S. 1623.6 1623.6 0 1624 Kg
2) Total Moments for tower type "A+ 0" on Base Raft (Designed moments) For Pile Cap:
Load
Load case Load Load
DUE TO TOWER 20 case 21
case
case 20
18
Total Moment at Base
29746.2 29746.2 12.1 29746
along X- Direction (Mwx) = Kgm
Total Moment at Base (Mwz) = 62749.5 62793.5 66010 62750 Kgm
along Z - Direction
II) PILE :-
a) Pile Data:
Diameter of Pile in mm = 500 mm
FGL
1.25m
Pile cap
b) Loading on Pile:-
Total Vertical load acting
on pile for design (P') = 477.5 kN
Load
TOTAL SHEAR ON PILE FOUNDATION Load case Load case Load
20 case 21 18 case 20
Total Shear in X-Direction Fwx * N = 264.924 264.924 272.05 264.92 kN
Total Shear in Z-Direction Fwz * N = 64.944 64.944 0 64.944 kN
2 2
= Fwx + Fwz
Load
DIAGONAL SHEAR ON PILE FOUNDATION Load case Load case Load
20 case 21 18 case 20
Diagonal Shear Fwd = 272.8 272.8 272.1 272.8 kN
Consider Load Case 20 & 21 for Tension & Compression calculation in End Pile
Load case
case 20 18
N2 x X2 = 4.79
20 case 18
N1 x X1 = 4.79
Fig. 1 & 2
a1 = B1xH1 = 0.70 m2
H2 = B2xB2+dXd = 1.07 m
a2 = B2 x H2 = 0.63 m2
i) For Pedestal:
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc = b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc =b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
Bending Moments -
Depth reqd :
Tk. of raft slab reqd. = Mmax x 106
2.76 1000
= 88 mm
Thickness assumed = d provided = 900 mm
d effective = 817 mm
--OK--
Reinforcement -
0.5 x 20 1- 1- ( 4.6xB.M.)x10 6 bd
Astreqd = 415 25 x b x d2
Reinforcement Provided :
Along Length of Pile Cap -
At top : Provide 20 F @ 170 c/c as main reinf ( 1847.996 )
Vertical Stirrups:-
Provide 12 F @ 170 c/c as dist. reinf ( 665.2784 )
8) LOADING ON PILE
Axial capacity of Pile = 2500 kN
Load Load
SHEAR ON EACH PILE case case Load Load
20 21 case 18 case 20
Horizontal
Shear on pile F Fwx' = 66.23 66.23 68.01 66.23 kN
for design (Fx') Np Fwz' = 16.24 16.24 0.00 16.24 kN
Moment on Pile:-
SR. NOTA-
D E S C R I PT I O N UNIT FORMULA Load case 20 Load case 21
NO. -TION
I DESIGN DATA
Factotred Load on Pile
a) Axial load on Pile Pu kN 343.38 282.71
b) Moment @ Major Axis Mux kNm 107.63 107.63
c) Moment @ Minor Axis Muy kNm 26.38 26.38
d) Diameter of Pile D mm 500 500
e) Dia of reinf. bar F mm 16 16
f) No. of bars no. 12 12
g) Longi.reinf.in Pile Asc mm2 2413 2413
h) Unsupported length of Column
@ Major Axis lex mm 3250 3250
@ Minor Axis ley mm 3250 3250
i) Grade of Concrete fck N/mm2 M30 30 30
j) Grade of Steel fy N/mm 2
Fe415 415 415
k) Clear cover mm 50 50
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 107.63 107.63
b) Design Moment @ Minor Axi Muy kNmMy orMey+May 26.38 26.38
@ Minor Axis
NORMAL CONDITION
For Base Slab Design For Column Design
Load Case & Description Moment Moment Shear Shear Force Uplift load Shear Force Shear
Vertical
Compression
about Z about X Force in X - in Z - on top of in X - Force in Z
Loads
load on top of
axis [Mz] axis [Mx] direction direction [Sz] Column direction - direction
[Sx] = Column [C] = [Fx] = [Fz] =
= = = [U] =
a) GEOMETRY :
P P
Fx / Fz Pedestal
0.5
H = 1.725 m
Pile Cap
1.0 m
Cut off Level
0.075 m
L =
15.075 m
Generally as per Bore log sheets, the soil starta in top 15M of soil below G.L. at various
location is soft/medium/stiff clay.But medium clay is more prominent. Thus Probable value of
L/D = 6.5
Dia. Of Pile = 0.5 m
Hence L = DX 6.50
c) LOADING DATA:
a) Size of column
in m ( b x D ) = 0.45 x 0.45
No. of Leg / Col. = 1
II) Forces and Moments at Bottom of Column..for Column design (Ultimate loads)
Load Load Load Load
FOR COLUMN
case 20 case 21 case 18 case 20
Vertical Load(Compression) at P+
bottom of Column = P + S.W. of (Pw) = (b x d x h x 203.41 203.22 150.28 203.22 kN
Col. 25)
U-
Uplift Load at bottom of Column
(Uw) = (b x d x h x 193.39 193.73 140.12 193.73 kN
= P - S.W. of Col.
25)
Moment in X - Direction due to
(Mwx)
Fwx = (Fwx x h) 3.39 3.39 3.48 3.39 kNm
Moment in Z - Direction due to
(Mwz) = (Fwz x h) 0.83 0.83 0.00 0.83 kNm
Fwz
e) Mmt @ Major Axis due to min Mex kNm 4.48 4.47 3.31 4.25
f) Mmt @ Minor Axis due to min. Mez kNm 4.48 4.47 3.31 4.25
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 4.48 4.47 3.83 4.25
b) Design Moment @ Minor Axi Muy kNmMz orMez+Maz 4.48 4.47 3.31 4.25
@ Major Axis
b) Referring to Interaction Diag. coef2 Mu/(fck*D* 0.06 0.06 0.055 0.06
of SP - 16, Mu / (fck*b*D )2
b2)
@ Minor Axis
8 a) T'fore Mmnt carrying capacity Mux1 kNm coeff1*(fck 136.69 136.69 125.30 136.69
of Column @ Major Axis *b*D )2
b) And Mmnt carrying capacity o Muz1 kNm coeff2*(fck 136.69 136.69 125.30 136.69
Column @ Minor Axis *D*b2)
2) Total Moments for tower type "A+ 0" on Base Raft (Ultimate moments)
Load
Load Load Load
DUE TO TOWER case
case 20 case 21 case 18
20
Total Moment at Base along X-
31678 31678 7 31678 Kgm
Direction (Mwx) =
Total Moment at Base along Z -
73474 73514 76944 73514 Kgm
Direction (Mwz) =
1) Foundation Loads for tower type "A+ 0"(Designed loads) for Pile Cap:
Load
Load Load Load
FOR COLUMN case 20 case 21 case 18
case
20
Vertical loads (V) = V x F.O.S. 1713.8 1593.9 1741.3 1593.9 Kg
Shear in X-direction (Fwx) = Fwx x F.O.S. 6623.1 6623.1 6801.3 6623.1 Kg
Shear in Z-direction (Fwz) = Fwz x F.O.S. 1623.6 1623.6 0 1623.6 Kg
2) Total Moments for tower type "A+ 0" on Base Raft (Designed moments) For Pile Cap:
Load case Load Load Load
DUE TO TOWER 20 case 21 case 18 case 20
Total Moment at Base along
34845.8 34845.8 7.7 34845.8
X- Direction (Mwx) = Kgm
Total Moment at Base along (Mwz) = 80821.4 80865.4 84638.4 80865.4 Kgm
Z - Direction
II) PILE :-
a) Pile Data:
Diameter of Pile in mm = 500 mm
FGL
1.25m
Pile cap
b) Loading on Pile:-
Total Vertical load acting
on pile for design (P') = 644.1 kN
2 2
= Fwx + Fwz
Consider Load Case 20 & 18 for Tension & Compression calculation in End Pile
Load case
case 20 18
N2 x X2 = 5.58
N1 x X1 = 5.58
Fig. 1 & 2
a1 = B1xH1 = 0.83 m2
H2 = B2xB2+dXd = 1.18 m
a2 = B2 x H2 = 0.75 m2
i) For Pedestal:
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc = b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
T v < Ks x Tc
Ks = 0.5+ Bc < 1
Where Bc =b/D = 1
ks = 0.5+Bc = 1.5
\ ks = 1
\ Ks x Tc = 1.37 N/mm2
Bending Moments -
Depth reqd :
Tk. of raft slab reqd. = Mmax x 106
2.76 1000
= 98 mm
Thickness assumed = d provided = 1000 mm
d effective = 917 mm
--OK--
Reinforcement -
0.5 x 20 1- 1- ( 4.6xB.M.)x10 6 bd
Astreqd = 415 25 x b x d2
Reinforcement Provided :
Along Length of Pile Cap -
At top : Provide 20 F @ 150 c/c as main reinf ( 2094.395 )
Vertical Stirrups:-
Provide 12 F @ 150 c/c as dist. reinf ( 753.9822 )
Moment on Pile:-
Load Load
PILE DESIGN
case 20 case 21
Total vertical = 394.74 334.53 kN
(p) x F.O.S.
Load
Moment on pile (Mwx') x F.O.S. = 107.63 107.63 kNm
Moment on pile (Mwz') x F.O.S. = 26.38 26.38 kNm
12) DESIGN OF PILES FOR VARIOUS LOAD CASES (Limit State Method):
SR. NOTA-
D E S C R I PT I O N UNIT FORMULA Load case 20 Load case 21
NO. -TION
I DESIGN DATA
Factotred Load on Pile
a) Axial load on Pile Pu kN 394.74 334.53
b) Moment @ Major Axis Mux kNm 107.63 107.63
c) Moment @ Minor Axis Muy kNm 26.38 26.38
d) Diameter of Pile D mm 500 500
e) Dia of reinf. bar F mm 16 16
f) No. of bars no. 12 12
g) Longi.reinf.in Pile Asc mm2 2413 2413
h) Unsupported length of Column
@ Major Axis lex mm 3250 3250
@ Minor Axis ley mm 3250 3250
i) Grade of Concrete fck N/mm2 M30 30 30
j) Grade of Steel fy N/mm 2
Fe415 415 415
k) Clear cover mm 50 50
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNmMx orMex+Max 107.63 107.63
b) Design Moment @ Minor Axi Muy kNmMy orMey+May 26.38 26.38
@ Minor Axis
14) DESIGN OF PILES FOR VARIOUS LOAD CASES (Limit State Method):
SR. NOTA-
D E S C R I PT I O N UNIT FORMULA Load case 20 Load case 21
NO. -TION
I DESIGN DATA
Factotred Load on Pile
a) Axial load on Pile Pu kN 3000 900
b) Moment @ Major Axis Mux kNm 90 0.00
c) Moment @ Minor Axis Muy kNm 0.00 0.00
d) Diameter of Pile D mm 500 500
e) Dia of reinf. bar F mm 20 20
f) No. of bars no. 12 12
g) Longi.reinf.in Pile Asc mm2 3770 3770
h) Unsupported length of Column
@ Major Axis lex mm 3250 3250
@ Minor Axis ley mm 3250 3250
i) Grade of Concrete fck N/mm2 M30 30 30
j) Grade of Steel fy N/mm 2
Fe415 415 415
k) Clear cover mm 50 50
IV DESIGN MOMENTS
5 a) Design Moment @ Major Axi Mux kNm Mx orMex+Max 90.00 20.85
b) Design Moment @ Minor Axi Muy kNm My orMey+May 69.50 20.85
@ Minor Axis
B) PILE CAP:--
PROPERTIES:-
Thickness of Footing = 750 mm
Width of Pile Cap = 2795.463 mm
Length of Pile Cap = 2795.463 mm
REINFORCEMENT:-
Vertical Stirrups:-
Provide 12 F @ 150 c/c as dist. reinf ( 754 )
C) PILE :--
A) PEDESTAL C2:--
B) PILE CAP:--
PROPERTIES:-
Thickness of Footing = 900 mm
Width of Pile Cap = 3196 mm
Length of Pile Cap = 3196 mm
REINFORCEMENT:-
Along Length of Pile Cap -
At top : Provide 20 F @ 170 c/c as main reinf ( 1848 )
Vertical Stirrups:-
Provide 12 F @ 170 c/c as dist. reinf ( 665 )
C) PILE :--
A) PEDESTAL C3:--
Longitudinal Reinforcement = 16 Y 8
Lateral Ties = 8Y @ 150c/c Throughout
REINFORCEMENT:-
Along Length of Pile Cap -
At top : Provide 20 F @ 150 c/c as main reinf ( 2094 )
Vertical Stirrups:-
Provide 12 F @ 150 c/c as dist. reinf ( 754 )
C) PILE :--