Вы находитесь на странице: 1из 152

LISTA DE PRECIOS

FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
MAQUINARIA/EQUIPOS
1 HERRAMIENTA MENOR DIA $ 7,000.00
2 MEZCLADORA DE CONCRETO HR $ 11,500.00
3 VIBRADOR DE CONCRETO HR $ 15,000.00
4 COMPACTADOR TIPO RANA HR $ 11,500.00
5 MOTONIVELADORA HR $ 70,000.00
6 FORMALETA METALICA DIA $ 3,000.00
7 COMPACTADOR MANUAL HR $ 10,000.00
8 ANDAMIO DIA $ 1,000.00
9 CAMIONETA HR $ 15,000.00
10 FORMALETA DIA $ 1,000.00
11 VIBROCOMPACTADOR MECANICO HR $ 70,000.00
12 EQUIPO DE SOLDADURA HR $ 12,000.00
13 VOLQUETA M3/KM $ 800.00
14 VOLQUETA HR $ 20,000.00
15 RETROCARGADOR HR $ 45,000.00
16 $ 0.00
MANO DE OBRA
17 MAESTRO DIA 80% $ 50,000.00
18 OFICIAL DIA 80% $ 35,000.00
19 AYUDANTE DIA 80% $ 25,000.00
21 ELECTRICO DIA 80% $ 60,000.00
22 CADENERO DIA 80% $ 20,000.00
TRANSPORTE KM
25 FLETE TRITURADO PIEDRA M3 50 $ 800.00
26 FLETE ARENA M3 50 $ 800.00
27 FLETE CEMENTO Y OTROS KG 1 $ 50.00
MATERIALES OBRA CIVIL bB
28 CEMENTO GRIS KG $ 500.00
29 ARENA M3 $ 37,000.00
30 TRITURADO DE 3/4" M3 $ 47,000.00
31 AGUA LT $ 12.00
32 CEMENTO BLANCO 40 KG BTO $ 30,000.00
33 TEMOSA UND $ 650.00
34 SIKA TIPO 1 KG $ 5,000.00
35 PERFIL DE ALUMINIO ML $ 1,000.00
36 ACERO DE REFUERZO 60000 PSI KG $ 3,800.00
37 ALAMBRE NEGRO KG $ 3,500.00
38 PEGACOR KG $ 750.00
39 ACERO DE REFUERZO 60000 PSI KG $ 3,800.00
40 ACERO DE REFUERZO 37000 PSI GB $ 3,700.00
41 PUNTILLA 2½" LB $ 2,250.00
42 HIERRO ¼ A-37 KG $ 2,200.00
43 VARILLA 1/2" ML $ 2,700.00
LISTA DE PRECIOS
FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
44 EPOXICO ADHESIVO GLB $ 2,700.00
45 LADRILLO H-10 UND $ 1,000.00
46 SOLDADURA PARA PVC GAL $ 56,700.00
47 LIMPIADOR PARA PVC GAL $ 45,000.00
48 EPOXICO TAPA GOTERAS TEJA ASBESTOCEMENTO UND $ 5,000.00
49 LAVAPLATOS EN ACERO INOXIDABLE UND $ 85,000.00
50 LLAVE DE BOLA UND $ 10,000.00
51 CINTA TEFLON UND $ 450.00
52 TEJA ONDULADA # 8 UND $ 40,803.00
53 TUBERIA PVC HIDRAULICA DE 3/4" ML $ 7,000.00
54 TUBERIA PVC HIDRAULICA DE ½ ML $ 5,800.00
55 ACCESORIOS HIDRAULICOS GB $ 30,000.00
56 ACCESORIOS PARA INSTALACION DE MODULOS DE OFICINA M2 $ 12,000.00
57 MODULO DE OFICINA M2 $ 95,000.00
58 BOMBILLO AHORRADOR UND $ 12,000.00
59 BALASTO UND $ 50,000.00
60 REGLETA PLASTICA 2" ML $ 2,000.00
61 TOMCORRIENTE DOBLE LUMINEX UND $ 5,000.00
62 CURVA CONDUIT 1/2" UND $ 500.00
63 ALAMBRE CU No 14 DESNUDO ML $ 700.00
64 TUBERIA DE ½" CONDUIT ML $ 3,000.00
65 ALAMBRE # 12 THHN ML $ 1,100.00
66 CINTA Y ACCESORIO ELECTRICO GB $ 1,000.00
67 PLAFON GB $ 2,000.00
68 INTERRUPTOR DOBLE LUMINEX UND $ 9,600.00
69 CAJA OCTAGONAL UND $ 1,200.00
70 CAJA RECTANGULAR UND $ 1,200.00
71 TUBERIA PVC SANITARIA DE 2" ML $ 12,000.00
72 TUBERIA PVC SANITARIA DE 3" ML $ 22,000.00
73 TUBERIA PVC SANITARIA DE 4" ML $ 31,350.00
74 SANITARIO ACUACER BLANCO SUNSET TIPO 100 UND $ 120,000.00
75 LAVAMANOS ACUACER 732 TIPO 100 UND $ 66,000.00
76 MANGUERA CONEXIÓN LAVAMANOS y SANITARIO UND $ 2,300.00
77 INCRUSTACIONES ACUACER UND $ 26,000.00
78 PUERTA Y MARCO METALICO 0.80X200 UND $ 120,000.00
79 SIFON SANITARIO 2" UND $ 8,000.00
80 CODOS PVC 3" UND $ 3,845.00
81 CODOS PVC 2" UND $ 2,121.00
82 TEES PVC D=3" UND $ 3,394.00
83 TEES PVC DOBLE REDUCIDA UND $ 60,000.00
LISTA DE PRECIOS
FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
84 YEE PVC DOBLE REDUCIDA UND $ 49,000.00
85 BAJANTE LAVAMANOS UND $ 4,420.00
86 SIFON LAVAPLATOS UND $ 5,270.00
87 Piedra Bolo Rajon M3 $ 20,000.00
88 CERAMICA 30X30 M2 $ 25,000.00
89 CERAMICA 20X20 ANTIDESLIZANTE M2 $ 22,000.00
90 CODO SANITARIO 4" UND $ 14,000.00
91 TANQUE SEPTICO DE 1000 LTS UND $ 300,000.00
92 SIFON SANITARIO 4" UND $ 28,000.00
93 YEE SANITARIA DE 4" und $ 17,942.00
94 ACCESORIOS SANITARIOS DE 2" GLB $ 30,000.00
95 ACCESORIOS SANITARIOS DE 4" ML $ 40,000.00
96 TANQUE ANAEROBICO 1000 LTS UND $ 350,000.00
97 TANQUE RETENEDOR DE GRASAS 250 LTS UND $ 85,000.00
LISTA DE PRECIOS
FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
98 LAVADERO PREFABRICADO EN GRANITO 0.8 x 0.6 UND $ 135,000.00
99 DUCHA SENCILLA PRISMA REF 51470 UND $ 25,000.00
100 TANQUE PLASTICO CAPACIDAD 500 LT. UND $ 90,000.00
101 ACERO PDR 60 KG $ 2,800.00
102 PINTURA KORAZA EXTERIOR GAL $ 80,000.00
103 PINTURA KORAZA INTERIORES GAL $ 65,000.00
104 BARNIZ EXTERIOR GAL $ 55,000.00
105 ESMALTES PARA USO EXTERIORES GAL $ 65,000.00
106 TINNER GAL $ 7,000.00
107 PANEL DIVISORIO M2 $ 12,500.00
108 TEJA ESPAÑOLA M2 $ 9,000.00
109 PILAR DE 13X13 L:3 MTS M2 $ 35,000.00
110 MADERA LAMINADA M2 $ 43,000.00
111 POLIETILENO CALIBRE 4 M2 $ 16,000.00
112 CINTA PERMEABLE DE ALTA ADHERENCIA UND $ 15,500.00
113 AISLANTE ACUSTICO M2 $ 10,000.00
114 GRAPAS LB $ 3,000.00
115 ESQUINERO EN MADERA ML $ 17,500.00
116 BANDA EN MADERA E:10 CM PULIDA ML $ 8,000.00
117 REJA METALICA SEGÚN DISEÑO M2 $ 20,000.00
118 PORTON METALICO SEGÚN DISEÑO M2 $ 70,000.00
119 PINTURA PARA EXTERIORES GAL $ 75,732.00
120 ANTICORROSIVO GAL $ 38,000.00
121 TUBO METALICO A.N. 2.7/8" pint. antic. ML $ 10,000.00
122 ORINAL MEDIANO REF: 08860 - 100-103-155 UND $ 140,000.00
123 TORNILLO UND $ 450.00
124 TRINITARIO UND $ 40,000.00
125 Valla informativa de 8mX4m GBL $ 2,500,000.00
126 LUMINARIA CIRCULAR FLUORESCENTE UND $ 15,000.00
127 ACCESORIOS PARA ENGRANAJE DE ARCHIVO UND $ 190,000.00
128 LAMPARA 2X48 SLIM LINE UND $ 56,000.00
129 TOMA CORRIENTE COMUN UND $ 5,500.00
130 LAMINA DE DRYWALL M2 $ 20,000.00
131 ESTRUCTURA DE SOPORTE GLB $ 5,000.00
132 ALAMBRE ML $ 1,500.00
133 MASILLA GLB $ 3,000.00
134 PINTURA BLANCA GAL $ 65,000.00
135 LAMINA DE ICOPOR M2 $ 8,000.00
LISTA DE PRECIOS
FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
136 FLANCHE METALICO ML $ 10,000.00
137 LAMINA DE ZINC LISO CAL 31 M2 $ 13,400.00
138 ADITIVO SIKA FLEX ML $ 28,000.00
139 MASILLA ML $ 38,000.00
140 TUBO 3X1,1/2 CAL 20 ML $ 6,800.00
141 GANCHO PARA TEJA DE ETERNIT UND $ 900.00
142 PUERTA 0.90X2.00M Metalica cal 20 UND $ 140,000.00
143 PUERTA 0.70X2.00M Metalica cal 20 UND $ 130,000.00
144 Marco y reja metalica para baño 0.80*0.40 UND $ 84,000.00
145 Material de Relleno m3 $ 20,000.00
146 Base granular m3 $ 28,500.00
147 Pintura para pavimentos ml $ 650.00
148 Oiti h=1.20 UND $ 7,500.00
149 Penitentes 2mts UND $ 21,000.00
150 Empradizado m2 $ 2,500.00
151 Oiti h=2.00mts UND $ 75,000.00
152 Cedro h=0.60mts UND $ 5,000.00
153 Zunglia h=0.55mts UND $ 650.00
154 Malla para gavion cal 12 (10x10cm) 1x1x2 UND $ 57,000.00
155 Abono organico gallinaza bult $ 4,000.00
156 Liston de Madera 9x15cm en Cedro ml $ 12,000.00
157 Liston de Madera 9x6cm en Cedro ml $ 8,500.00
158 Puntillas lb $ 2,000.00
159 Trapecios de 3cmX2cm ml $ 2,000.00
160 Teja Plana de gress m2 $ 22,000.00
161 Piedra rajon m3 $ 20,000.00
162 alambre para cocido gavion kg $ 2,700.00
163 Jamba de gres para bordillo und $ 1,050.00
164 Base Asfaltica MDC # 2 rodadura M3 $ 240,000.00
165 Acometida Publica alambre 2 # 8 Duct 1" GLB $ 30,000.00
166 Baranda metalica tub. 2" 1.00mts con socalo en tubo 1" ml $ 185,000.00
167 Porta Bicicletas metalico en tuberia de 2" y 1" und $ 220,000.00
168 Canal Metalico 0.20X0.15mts ml $ 25,000.00
169 Bajante de 1" galv. 6mts und $ 185,000.00
170 Lampara doble copa ornamental UND $ 855,000.00
171 TUBERIA DE 36" ML $ 240,000.00
172 Base Asfaltica MDC # 3 M3 $ 350,000.00
173 SIKA TIPO 1 KG $ 5,550.00
LISTA DE PRECIOS
FECHA: 16 de September de 2019

PROYECTO: #REF!

PROPONENTE:

No. VALOR
DESCRIPCION UNIDAD
Art. UNITARIO
174 ELEMENTOS DE ASEO GLB $ 50,000.00
175 LIJA DE AGUA PLI $ 1,100.00
176 PINTURAMA TIPO III GLN $ 35,000.00
0.00%
PRECIO CON IVA PRECIO SIN IVA
2,380.90 2,052.50
2,900.00 2,500.00
62,640.00 54,000.00
34,220.00 29,500.00
174.00 150.00
11,600.00 10,000.00
440.80 380.00
34,800.00 30,000.00
10,382.00 8,950.00
3,364.00 2,900.00
62,640.00 54,000.00
10,440.00 9,000.00
754.00 650.00
29,000.00 25,000.00
0.00
0.00

300.00 155.00 $ 500.00 50.00 25000.00


18,500.00 12,500.00 37,000.00 8.00 296,000.00
28,000.00 24,000.00 47000 8.00 376,000.00
5.80 5.00
31,700.00 300.00
9,000.00
1,914.00 1,650.00
17,000.00 1,300.00
3,500.00 1,300.00
2,500.00 181.00
1,700.00 100.00
2,200.00 40,000.00
1,300.00 302.00
2,250.00 95,000.00
2,200.00 60,000.00
2,700.00 1,400.00
0.00%
4,500.00 9,500.00
600.00 4,800.00
190.00 4,800.00
3,480.00 3,000.00
8,800.00 20,000.00
65,000.00 100,000.00
2,500.00 200,000.00
700.00
40,803.00
180.00
2,000.00
1,900.00
56,500.00
27,200.00
91,500.00
8,800.00
2,000.00
80,000.00
9,000.00
16,200.00
1,670.00
450.00
1,000.00
1,200.00
5,500.00
785.00
785.00
7,000.00
10,000.00
15,000.00
120,000.00
66,000.00
2,300.00
16,000.00
120,000.00
85,000.00
3,845.00
2,121.00
3,394.00
2,630.00
0.00%
5,783.00
4,420.00
5,270.00
16,000.00
18,000.00
4,500.00
750.00
300,000.00
16,772.00
17,942.00
9,000.00
15,000.00
350,000.00
85,000.00
0.00%
135,000.00
40,500.00
90,000.00
2,500.00
57,000.00
12500
65,000.00
8,500.00
4,500.00
10,000.00
9,000.00
35,000.00
11,000.00
11,000.00
15,500.00
1,500.00
1,500.00
18,000.00
3,000.00
20,000.00
70,000.00
45,000.00
30,000.00
18,000.00
140,000.00
0.00%

$ 120,000.00
DEPARTAMENTO DE SANTANDER MUNICIPIO DE SABANA DE TORRES

MANTENIMIENTO Y ADECUACION DE LA INFRAESTRUCTURA DEL CENTRO VIDA MA


GALVIS MARTINEZ DEL MUNICIPIO DE SABANA DE TORRES

PRESUPUESTO OFICIAL
ITEM DESCRIPCION UNIDAD CANTID V/ UNIT.
1.00 OBRAS CIVILES
1.01 Demolición de cunetas existentes (incluye retiro de material) ML 74.50 $ 2,000,000.00
1.02 Excavación manual en material común en seco M3 71.10 $ 3,500,000.00
1.03 Demolición de Cajas recolectoras Und 5.00 $ 3,500,000.00
Construcción de Cárcamos perimetrales en concreto de 2500
1.04 ML 74.50 $ 2,000,000.00
PSI incluye tapa rejilla metálica
Construcción de cajas recolectoras de aguas lluvias
1.05 1mX1mX0,8m en ladrillo incluye friso interior y tapa en Und 6.00 $ 2,000,000.00
concreto reforzado
Suministro e instalación de tubería de 8" para la red de
1.06 ML 198.90 $ 33,750.00
alcantarillado pluvial
Resane y pintura en paredes de los modulo de los
1.07 M2 9.60 $ 18,730.00
dormitorios
Demolición de rampas 1,3m de ancho de acceso a Zona
1.08 ML 3.60 $ 62,078.00
medica y comedores
Suministro e instalación de baranda metálica para
1.09 ML 16.00 #REF!
pasamanos en las rampas
1.10 Pintura para interiores en módulos de dormitorios M2 540.00 #REF!

SUBTOTAL
2.00 INSTALACIONES ELECTRICAS
2.01 Suministro e instalación de bombillos ahorradores de 25W Und 87.00 #REF!
2.02 Suministro e instalacion de flotadores sistema de bombeo Und 2.00 #REF!
Mantenimieto de lampara de 2X96 (incluye cambio de
2.03 Und 18.00 #REF!
balastro y bombilla fluorecente)
Mantenimieto de lampara de 2X48 (incluye cambio de
2.04 Und 12.00 #REF!
balastro y bombilla fluorecente)
2.05 Suministro e Instalación de Plafones de pasta Und 5.00 #REF!
2.06 Und 25.00 #REF!
Mantenimiento de acometida electrica de luminarias 2X96
Mantenimiento de aires tipo Mini Split de 12000 BTU (Incluye
2.07 Und 3.00 #REF!
recarga)
Desmonte mantenimiento y reubicación de de un aire tipo
2.08 Und 1.00 #REF!
Mini Split de 12000 BTU
2.09 Mantenimiento de un extractor de grasa Und 1.00 #REF!
2.10 Mantenimiento de 32 ventiladores de techo Und 32.00 #REF!
Mantenimiento y alimentación eléctrica de la caja de control
2.11 Und 1.00 #REF!
del cuarto de enfriamiento
Mantenimiento de la bomba Hidroflow (mantenimiento y
2.12 Und 1.00 #REF!
limpieza de conectores del automatico)
Acometida electrica lampara exterior (desde el cuarto de
2.13 Und 1.00 #REF!
lavatraperos)
DEPARTAMENTO DE SANTANDER MUNICIPIO DE SABANA DE TORRES

MANTENIMIENTO Y ADECUACION DE LA INFRAESTRUCTURA DEL CENTRO VIDA MA


GALVIS MARTINEZ DEL MUNICIPIO DE SABANA DE TORRES

PRESUPUESTO OFICIAL
ITEM DESCRIPCION UNIDAD CANTID V/ UNIT.
Mantenimiento de lámparas tipo Bolardo del patio Central
2.14 Und 16.00 #REF!
(Incluye cambio de bombillo)
SUBTOTAL
3.00 INSTALACION DE CAMARAS CCTV
3.01 Instalación de cámaras Und 16.00 #REF!
3.02 Suministro e instalacion de Gabinete Rack 9 secciones Und 1.00 #REF!
3.03 Punto de acometida para camara CCTV Und 16.00 #REF!
SUBTOTAL
4.00 OTROS
4.01 Suministro y cambio de Grifería duchas Und 10.00 #REF!
4.02 Instalación teja española en el quiosco Und 35.00 #REF!
4.03 Mantenimiento drywall cielo raso en capilla bodega recepción M2 52.00 #REF!
4.04 Cambio de grifería Lavamanos Und 6.00 #REF!
Realce rampa de acceso de automóviles en concreto de
4.05 M3 3.96 #REF!
3000 psi
4.06 Suministro e instalacion de malla angeo tragaluz ML 50.00 #REF!
4.07 Limpieza y replanteo de cuneta en vía pavimentada ML 45.00 #REF!
SUBTOTAL
5.00 ADECUACION DE BAÑO PARA DISCAPACITADOS
5.01 Demilocion de muros en mamposteria m2 6.90 #REF!
5.02 Desmonte de puertas metalicas und 4.00 #REF!
5.03 Desmonte de sanitario existente und 2.00 #REF!
5.04 Adecuacion de punto sanitario para sanitario 4" und 1.00 #REF!
5.05 Adecuacion de punto Hidraulico para sanitario 1/2" und 1.00 #REF!
5.06 Instalacion de Sanitario existente und 1.00 #REF!
5.07 Viga de cimentacion (incluye anclaje a viga existente) ML 2.30 #REF!
5.08 mamposteria M2 2.60 #REF!
5.09 Vigeta aerea de ,10*30 ML 2.30 #REF!
5.10 Enchape de muros M2 2.60 #REF!
5.11 Desmonte de griferia e instalacion de ducha telefono Und 1.00 #REF!
5.12 suministro e instalacion de puerta metalica de 2*1 Und 2.00 #REF!
SUBTOTAL
COSTO DIRECTO
AIU 35.0%
COSTO TOTAL
DEPARTAMENTO DE SANTANDER MUNICIPIO DE SABANA DE TORRES

MANTENIMIENTO Y ADECUACION DE LA INFRAESTRUCTURA DEL CENTRO VIDA MA


GALVIS MARTINEZ DEL MUNICIPIO DE SABANA DE TORRES

PRESUPUESTO OFICIAL
ITEM DESCRIPCION UNIDAD CANTID V/ UNIT.

Arq PAOLA ANDREA URQUIJO RODRIGUEZ


NDER MUNICIPIO DE SABANA DE TORRES

FRAESTRUCTURA DEL CENTRO VIDA MARTHA JANETH


MUNICIPIO DE SABANA DE TORRES

PUESTO OFICIAL
V/PARCIAL

$ 149,000,000.00
$ 248,850,000.00
$ 17,500,000.00
$ 149,000,000.00

$ 12,000,000.00

$ 6,712,875.00

$ 179,808.00

$ 223,481.00

#REF!
#REF!

#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
NDER MUNICIPIO DE SABANA DE TORRES

FRAESTRUCTURA DEL CENTRO VIDA MARTHA JANETH


MUNICIPIO DE SABANA DE TORRES

PUESTO OFICIAL
V/PARCIAL
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
NDER MUNICIPIO DE SABANA DE TORRES

FRAESTRUCTURA DEL CENTRO VIDA MARTHA JANETH


MUNICIPIO DE SABANA DE TORRES

PUESTO OFICIAL
V/PARCIAL
OBRA: construccion de carcamo en cabañas 2,3 y 5 SEDE RECREACIONAL CAJASAN
CONTRATISTA: SAS
02 DE SEPTIEMBRE DE 2019

PRESUPUESTO

ITEM DESCRIPCIÓN UND CANT VR. UNIT TOTAL


1.00 PRELIMINARES
1.01 Demolición canaleta existente ML 40.00 $ 6,000 $ 240,000
1.03 Excavación 50 X 40 ML 40.00 $ 8,000 $ 320,000
SUBTOTAL $ 560,000

2.00 MATERIALES
2.01 Bultos de cemento UN 17 $ 23,000 $ 391,000
2.02 Mts de arena MTS 2 $ 60,000 $ 120,000
2.03 Mts de triturado MTS 2 $ 55,000 $ 110,000
2.04 Latas metálicas - alquiler UN 60 $ 600 $ 36,000
2.05 carretilla UN 1 $ 160,000 $ 160,000
2.06 FLETES Y RETIRADA DE ESCOMBROS VIAJES 2 $ 80,000 $ 160,000
SUBTOTAL $ 977,000

3.00 CONSTRUCCION
3.01
Fundida de carcamo en concreto equivalente a 40 ml ML 40 $ 28,000 $ 1,120,000
3.02
Hechura de 40mL de reja para canaleta, con varilla de 1/2 y riel en ángulo de 1 y 1/2 por 3/16, fondo en anticorrosivo y terminado enML
pintura color
20 al gusto.
$ 30,000 $ 600,000
SUBTOTAL $ 1,720,000

4.00 ASEO
4.01 ASEO Y LIMPIEZA GENERAL DE OBRA GL 1.00 $ 100,000 $ 100,000
SUBTOTAL $ 100,000

TOTAL COSTO DIRECTO $ 3,357,000


ADMINISTRACION 12% $ 402,840
IMPREVISTOS 8% $ 268,560
TOTAL $ 4,028,400
$ 0
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: 1.03 Excavación 50 X 40

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 SUB/ESTUDIO SUELOS GLB 1.00 $ 2,000,000.00 0% $ 2,000,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD
ML

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 2,000,000.00

$ 2,000,000.00
$ 2,000,000.00

$ 2,000,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS FECHA

PROYECTO: 0 12/30/1899

CAPITULO: PRELIMINARES UNIDAD


ITEM: Err:509 Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT. VR. PARCIAL

SUBTOTAL EQUIPOS/HERRAMIENTAS $ 0.00


VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS $ -

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO % VR. PARCIAL

SUBTOTAL DE MATERIALES $ -
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS $ -

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM VR. PARCIAL

SUBTOTAL TRANSPORTE $ -
VALOR REDONDEADO SUBTOTAL TRANSPORTE $ -

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO. VR. PARCIAL
SUB/DISEÑO ESTRUCTURAL 1.00 $ 3,500,000.00 0% $ 3,500,000.00 $ 1.00 $ 3,500,000.00

SUBTOTAL MANO DE OBRA $ 3,500,000.00


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA $ 3,500,000.00

TOTAL COSTO DIRECTO $ 3,500,000.00


ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS FECHA

PROYECTO: 0 12/30/1899

CAPITULO: PRELIMINARES UNIDAD


ITEM: Err:509 Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT. VR. PARCIAL

VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS $ -

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO % VR. PARCIAL

SUBTOTAL DE MATERIALES $ -
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS $ -

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM VR. PARCIAL
26

SUBTOTAL TRANSPORTE $ -
VALOR REDONDEADO SUBTOTAL TRANSPORTE $ -

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO. VR. PARCIAL
19 SUB/DISEÑO ARQUITECT UND 1.00 $ 3,500,000.00 0% $ 3,500,000.00 $ 1.00 $ 3,500,000.00

SUBTOTAL MANO DE OBRA $ 3,500,000.00


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA $ 3,500,000.00

TOTAL COSTO DIRECTO $ 3,500,000.00


ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
SUB/DISEÑO HIDRA Y SANT UND 1.00 $ 2,000,000.00 0% $ 2,000,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL

$ -

DESPERDICIO % VR. PARCIAL


$ -
$ -
$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL


$ -
$ -

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 2,000,000.00

$ 2,000,000.00
$ 2,000,000.00

$ 2,000,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.

VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
SUB/DISEÑO ELECTRICO UND 1.00 $ 2,000,000.00 0% $ 2,000,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL

$ -

DESPERDICIO % VR. PARCIAL


$ -
$ -
$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 2,000,000.00

$ 2,000,000.00
$ 2,000,000.00

$ 2,000,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) 1

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

Materiales para Campamento (incluye madera rolliza, tabla, puntilla GLB 1 1080385

Grava M3 1 88000

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26 Transporte de Grava 1.00 m3-km 35

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 2.00 $ 48,000.00 80% 86400
19 AYUDANTE DIA 2.00 $ 27,000.00 80% 48600

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 3,375.00 $ 3,375.00

$ 3,375.00
$ 3,375.00

DESPERDICIO % VR. PARCIAL

4% $ 1,123,600.00

4% $ 91,520.00

$ 1,215,120.00
$ 1,215,120.00

PRECIO/KM VR. PARCIAL


$ 1,200.00 $ 42,000.00

$ 42,000.00
$ 42,000.00

RDTO. VR. PARCIAL


8.00 $ 21,600.00
8.00 $ 12,150.00

$ 33,750.00
$ 33,750.00

$ 1,294,245.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 225.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
MADERA ROLLIZA ML 3 $ 2,500.00 5%
LAMINAS CERRAMIENTO ML 2.5 $ 3,000.00 5%
ELEMENTOS MENORES (PUNTILLAS,CUNCHO ETC) Glb 1 $ 480.94 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 60.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 60.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 225.00

$ 225.00
$ 225.00

VR. PARCIAL
$ 7,875.00
$ 7,875.00
$ 504.98

$ 16,254.98
$ 16,255.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 810.00
$ 1,440.00

$ 2,250.00
$ 2,250.00

$ 18,730.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 141,300.00
EQUIPO DE TOPOGRAFIA DIA 0.14 $ 220,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
ESTACAS Y MATERIAL MENOR GLB 1 $ 50,000.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
19 CADENEROS DIA 15.00 $ 27,000.00 80% $ 48,600.00 $ 3.00
TOPOGRAFO DIA 15.00 $ 130,000.00 80% $ 234,000.00 $ 3.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 141,300.00
$ 1,518,970.96

$ 1,660,270.96
$ 1,660,271.00

VR. PARCIAL
$ 52,500.00

$ 52,500.00
$ 52,500.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 243,000.00
$ 1,170,000.00

$ 1,413,000.00
$ 1,413,000.00

$ 3,125,771.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 5,250.00
8 COMPRESOR DIA 10.00 $ 60,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 25.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 25.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 5,250.00
$ 6,000.00

$ 11,250.00
$ 11,250.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 3,456.00
$ 1,944.00

$ 5,400.00
$ 5,400.00

$ 16,650.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR DIA 1.00 $ 1,944.00
CARRETILLA BUGIE UND 24.68 $ 180,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 0.00 $ 48,000.00 80% $ 86,400.00 $ 2.50
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 2.50

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 1,944.00
$ 7,292.34

$ 9,236.34
$ 9,236.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ -
$ 19,440.00

$ 19,440.00
$ 19,440.00

$ 28,676.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 486.00
8 CARRETILLA BUGIE DIA 83.57 $ 180,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 0.00 $ 48,000.00 80% $ 86,400.00 $ 1.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 486.00
$ 2,153.77

$ 2,639.77
$ 2,640.00

VR. PARCIAL

$ -

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ -
$ 4,860.00

$ 4,860.00
$ 4,860.00

$ 7,500.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 2.16 $ 5,250.00
8 COMPRESOR DIA 0.00 $ 60,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 20.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 20.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 2,427.04

$ 2,427.04
$ 2,427.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 4,320.00
$ 2,430.00

$ 6,750.00
$ 6,750.00

$ 9,177.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 2.16 $ 5,250.00
8 COMPRESOR DIA 0.84 $ 60,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 5.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 2,427.04
$ 71,220.19

$ 73,647.23
$ 73,647.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 17,280.00
$ 9,720.00

$ 27,000.00
$ 27,000.00

$ 100,647.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS FECHA

PROYECTO: 0 12/30/1899

CAPITULO: PRELIMINARES UNIDAD


ITEM: Err:509 Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT. VR. PARCIAL

VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS $ -

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO % VR. PARCIAL

VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS $ -

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM VR. PARCIAL
26

SUBTOTAL TRANSPORTE $ -
VALOR REDONDEADO SUBTOTAL TRANSPORTE $ -

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO. VR. PARCIAL
SUB/LEGALIZACIONES UND 1.00 $ 11,586,660.00 0% $ 11,586,660.00 $ 1.00 $ 11,586,660.00
LICENCIAS

SUBTOTAL MANO DE OBRA $ 11,586,660.00


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA $ 11,586,660.00

TOTAL COSTO DIRECTO $ 11,586,660.00


ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: 2.01 Bultos de cemento

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 2,700.00
8 CARRETILLA BUGIE DIA 44.92 $ 180,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 5.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

UN

VR. PARCIAL
$ 2,700.00
$ 4,007.10

$ 6,707.10
$ 6,707.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 17,280.00
$ 9,720.00

$ 27,000.00
$ 27,000.00

$ 33,707.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: 2.02 Mts de arena

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,350.00
8 BENITIN DIA 14.72 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

MTS

VR. PARCIAL
$ 1,350.00
$ 8,150.96

$ 9,500.96
$ 9,501.00

VR. PARCIAL
$ -

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 4,860.00

$ 13,500.00
$ 13,500.00

$ 23,001.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: 2.03 Mts de triturado

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 MEZCLADORA DE CEMENTO DIA 4.00
FORMALETA GLB 1.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO 2500 PSI M3 0.600 $ 350,000.00
PIEDRA BOLO M3 0.600 $ 45,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 3,375.00 $ 3,375.00
$ 97,678.00 $ 24,419.50
$ 10,000.00 $ 10,000.00

$ 37,794.50
$ 37,795.00

DESPERDICIO % VR. PARCIAL


5% $ 220,500.00
5% $ 28,350.00
$ -

$ 248,850.00
$ 248,850.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 4.00 $ 21,600.00
$ 4.00 $ 12,150.00

$ 33,750.00
$ 33,750.00

$ 320,395.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 MEZCALADORA DE CEMENTO DIA 50.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 2500 SIN BOMBA M3 0.050 $ 324,838.10

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M2

VR. UNIT. VR. PARCIAL


$ 270.00 $ 270.00
$ 85,000.00 $ 1,700.00

$ 1,970.00
$ 1,970.00

DESPERDICIO % VR. PARCIAL


5% $ 17,054.00

$ 17,054.00
$ 17,054.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 50.00 $ 1,728.00
$ 50.00 $ 972.00

$ 2,700.00
$ 2,700.00

$ 21,724.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: 2.05 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
FORMALETA GLB 1.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI CON BOMBA M3 1.000 $ 350,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 9,180.00 $ 9,180.00
$ 22,519.00 $ 22,519.00

$ 31,699.00
$ 31,699.00

DESPERDICIO % VR. PARCIAL


5% $ 367,500.00
$ -
$ -
$ -

$ 367,500.00
$ 367,500.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 2.00 $ 43,200.00
$ 2.00 $ 24,300.00
$ 2.00 $ 24,300.00

$ 91,800.00
$ 91,800.00

$ 490,999.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: 2.06 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
FORMALETA GLB 1.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI M3 1.000 $ 350,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 6,750.00 $ 6,750.00
$ 13,926.18 $ 13,926.18

$ 20,676.18
$ 20,676.00

DESPERDICIO % VR. PARCIAL


5% $ 367,500.00
$ -
$ -
$ -

$ 367,500.00
$ 367,500.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 2.00 $ 43,200.00
$ 2.00 $ 24,300.00

$ 67,500.00
$ 67,500.00

$ 455,676.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
FORMALETA GLB 1.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI M3 1.000 $ 350,000.00
DIILATADORES Y PERFILES PARA ACABADO GLB 1.000 $ 50,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 12,240.00 $ 12,240.00
$ 62,709.00 $ 62,709.00

$ 74,949.00
$ 74,949.00

DESPERDICIO % VR. PARCIAL


5% $ 367,500.00
5% $ 52,500.00
$ -
$ -

$ 420,000.00
$ 420,000.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.50 $ 57,600.00
$ 1.50 $ 32,400.00
$ 1.50 $ 32,400.00

$ 122,400.00
$ 122,400.00

$ 617,349.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: 2.08 ACERO DE REFUERZO PDR60

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 246.86

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
ALAMBRE NEGRO KG 0.050 $ 1,917.31 5%
ACERO REFUERZO PDR 60 KG 1.000 $ 2,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 35.00
19 AYUDANTE DIA 0.00 $ 27,000.00 80% $ 48,600.00 $ 35.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

KG

VR. PARCIAL
$ 246.86

$ 246.86
$ 247.00

VR. PARCIAL
$ 100.66
$ 2,625.00
$ -
$ -

$ 2,725.66
$ 2,726.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 2,468.57
$ -

$ 2,468.57
$ 2,469.00

$ 5,442.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
FORMALETA GLB 9.40

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI M3 0.300 $ 320,000.00
IMPERMEABILIZACION DE CARCAMO GLB 1.000 $ 25,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

11/4/2016

UNIDAD

Err:509

VR. UNIT. VR. PARCIAL


$ 2,700.00 $ 2,700.00
$ 62,709.00 $ 6,670.43

$ 9,370.43
$ 9,370.00

DESPERDICIO % VR. PARCIAL


5% $ 100,800.00
5% $ 26,250.00
$ -
$ -

$ 127,050.00
$ 127,050.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 5.00 $ 17,280.00
$ 5.00 $ 9,720.00

$ 27,000.00
$ 27,000.00

$ 163,420.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CONSTRUCCION
ITEM: 3.01 Fundida de carcamo en concreto equivalente a 40 ml

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 3,060.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
PLATINAS DE ANCLAJE UND 1.000 $ 187,110.48 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 CUADRILLA ESTRUCTURA MET DIA 1.00 $ 85,000.00 80% $ 153,000.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

ML

VR. PARCIAL
$ 3,060.00

$ 3,060.00
$ 3,060.00

VR. PARCIAL
$ 196,466.00

$ 196,466.00
$ 196,466.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 30,600.00

$ 30,600.00
$ 30,600.00

$ 230,126.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CONSTRUCCION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,500.00
SOLDADOR ELECTRICO DIA 30.01 $ 85,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
PERFIL COL 2*2,66 KG 15.080 $ 11,500.00 5%
SOLDADURA PTO 0.030 $ 35,955.02 5%
TORNILLERIA GLB 1.000 $ 4,500.00 5%
PINTURA GLB 1.000 $ 5,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 CUADRILLA ESTRUCTURA DIA 1.00 $ 75,000.00 80% $ 135,000.00 $ 6.00
19

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 1,500.00
$ 2,832.78

$ 4,332.78
$ 4,333.00

VR. PARCIAL
$ 182,091.00
$ 1,132.58
$ 4,725.00
$ 5,775.00

$ 193,723.58
$ 193,724.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 22,500.00

$ 22,500.00
$ 22,500.00

$ 220,557.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CONSTRUCCION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,500.00
SOLDADOR ELECTRICO DIA 30.00 $ 85,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
RIOSTRA METALICA KG 15.080 $ 6,476.34 5%
SOLDADURA PTO 0.030 $ 35,955.02 5%
TORNILLERIA GLB 1.000 $ 4,500.00 5%
PINTURA GLB 1.000 $ 5,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 CUADRILLA ESTRUCTURA DIA 1.00 $ 75,000.00 80% $ 135,000.00 $ 6.00
19

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 1,500.00
$ 2,833.33

$ 4,333.33
$ 4,333.00

VR. PARCIAL
$ 102,546.30
$ 1,132.58
$ 4,725.00
$ 5,775.00

$ 114,178.88
$ 114,179.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 22,500.00

$ 22,500.00
$ 22,500.00

$ 141,012.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CONSTRUCCION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,500.00
SOLDADOR ELECTRICO DIA 5.00 $ 85,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
CERCHA METALICA KG 7.540 $ 11,500.00 5%
CORREAS METALICA KG 7.540 $ 11,500.00 5%
SOLDADURA PTO 0.050 $ 35,955.02 5%
TORNILLERIA GLB 1.000 $ 4,500.00 5%
PINTURA GLB 1.000 $ 13,377.86 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 CUADRILLA ESTRUCTURA DIA 1.00 $ 75,000.00 80% $ 135,000.00 $ 4.00
19

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 1,500.00
$ 17,000.00

$ 18,500.00
$ 18,500.00

VR. PARCIAL
$ 91,045.50
$ 91,045.50
$ 1,887.64
$ 4,725.00
$ 14,046.76

$ 202,750.40
$ 202,750.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 33,750.00

$ 33,750.00
$ 33,750.00

$ 255,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,350.00
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
TEJA METALICA M2 1.000 $ 39,478.57 5%
ACCESORIOS GLB 1.000 $ 5,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 1,350.00

$ 1,350.00
$ 1,350.00

VR. PARCIAL
$ 41,452.50
$ 5,775.00

$ 47,227.50
$ 47,228.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 4,860.00

$ 13,500.00
$ 13,500.00

$ 62,078.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: GRADERIA
ITEM: Err:509 ACERO DE REFUERZO PDR60

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 246.86

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
ALAMBRE NEGRO KG 0.050 $ 1,917.31 5%
ACERO REFUERZO PDR 60 KG 1.000 $ 2,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 35.00
19 AYUDANTE DIA 0.00 $ 27,000.00 80% $ 48,600.00 $ 35.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

KG

VR. PARCIAL
$ 246.86

$ 246.86
$ 247.00

VR. PARCIAL
$ 100.66
$ 2,625.00
$ -
$ -

$ 2,725.66
$ 2,726.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 2,468.57
$ -

$ 2,468.57
$ 2,469.00

$ 5,442.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: GRADERIA
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.37
FORMALETA GLB 4.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI SIN BOMBA M3 0.110 $ 320,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 1,928.57 $ 5,260.52
$ 22,519.00 $ 5,629.75

$ 10,890.27
$ 10,890.00

DESPERDICIO % VR. PARCIAL


5% $ 36,960.00
$ -
$ -
$ -

$ 36,960.00
$ 36,960.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 7.00 $ 12,342.86
$ 7.00 $ 6,942.86

$ 19,285.71
$ 19,286.00

$ 67,136.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,350.00
8 BENITIN DIA 14.72 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

MTS

VR. PARCIAL
$ 1,350.00
$ 8,150.96

$ 9,500.96
$ 9,501.00

VR. PARCIAL
$ -

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 4,860.00

$ 13,500.00
$ 13,500.00

$ 23,001.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: Err:509 Bultos de cemento

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 2,700.00
8 CARRETILLA BUGIE DIA 44.92 $ 180,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 5.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

UN

VR. PARCIAL
$ 2,700.00
$ 4,007.10

$ 6,707.10
$ 6,707.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 17,280.00
$ 9,720.00

$ 27,000.00
$ 27,000.00

$ 33,707.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 2,700.00
8 BENITIN DIA 12.53 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
BASE GRANURAL PARA PISO M3 1.000 $ 85,000.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 5.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

MTS

VR. PARCIAL
$ 2,700.00
$ 9,576.15

$ 12,276.15
$ 12,276.00

VR. PARCIAL
$ 89,250.00

$ 89,250.00
$ 89,250.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 17,280.00
$ 9,720.00

$ 27,000.00
$ 27,000.00

$ 128,526.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
FORMALETA GLB 1.85
BOMBA DE CONCRETO GLB 10.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CONCRETO SIMPLE 3000 PSI SIN BOMBA M3 0.100 $ 320,000.00
ENDURECEDOR SIKA PARA CONCRETO KG 5.000 $ 1,336.61

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

M3

VR. UNIT. VR. PARCIAL


$ 3,375.00 $ 3,375.00
$ 22,519.00 $ 12,159.80
$ 30,000.00 $ 3,000.00

$ 18,534.80
$ 18,535.00

DESPERDICIO % VR. PARCIAL


5% $ 33,600.00
5% $ 7,017.22
$ -
$ -

$ 40,617.22
$ 40,617.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 4.00 $ 21,600.00
$ 4.00 $ 12,150.00

$ 33,750.00
$ 33,750.00

$ 92,902.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509

ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) 3.47 $ 2,745.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

Malla de 10x10x1/4" m2 1 $ 12,500.00 20%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26 Transporte de triturado 0.00 m3-km 35.00 $ 1,200.00
Transporte de arena 0.00 m3-km 35.00 $ 1,200.00
SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 200.00
19 AYUDANTE DIA 4.00 $ 27,000.00 80% $ 48,600.00 200.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 790.06

$ 790.06
$ 790.00

VR. PARCIAL

$ 15,000.00

$ 15,000.00
$ 15,000.00

VR. PARCIAL
$ -
$ -
$ -
$ -

VR. PARCIAL
$ 432.00
$ 972.00

$ 1,404.00
$ 1,404.00

$ 17,194.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 2,322.00
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
SISTEMA PINTURA SPORT SIKA M2 1.000 $ 30,911.90 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 3.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 2,322.00

$ 2,322.00
$ 2,322.00

VR. PARCIAL
$ 32,457.50
$ -

$ 32,457.50
$ 32,458.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 14,580.00

$ 23,220.00
$ 23,220.00

$ 58,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509

ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) 1.00
8 EQUIPO DE SOLDADURA 0.80

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

Tuberia de de 3" comercial ml 7 $ 85,000.00


Tuberia de de 2" comercial ml 5.6 $ 55,000.00
Soldadura Kg 1.7 $ 20,000.00
Tableros acrilico baloncesto con marco metalico aro y red UND 1 $ 1,279,045.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 SOLDADOR DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

Err:509

VR. UNIT. VR. PARCIAL


$ 28,080.00 $ 28,080.00
$ 120,000.00 $ 150,000.00

$ 178,080.00
$ 178,080.00

DESPERDICIO % VR. PARCIAL

10% $ 654,500.00
10% $ 338,800.00
10% $ 37,400.00
$ 1,279,045.00

$ 2,309,745.00
$ 2,309,745.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


0.80 $ 191,250.00
0.80 $ 60,750.00

$ 252,000.00
$ 252,000.00

$ 2,739,825.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509

ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) 1.00 $ 8,064.00
8 EQUIPO DE SOLDADURA 2.00 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

Pintura gl 0.1 $ 55,000.00 5%


Tuberia de de 2" comercial ml 4 $ 30,647.86 5%
Soldadura Kg 0.8 $ 20,000.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 SOLDADOR DIA 1.00 $ 85,000.00 80% $ 153,000.00 2.50
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 2.50

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 8,064.00
$ 60,000.00

$ 68,064.00
$ 68,064.00

VR. PARCIAL

$ 5,775.00
$ 128,721.00
$ 16,800.00

$ 151,296.00
$ 151,296.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 61,200.00
$ 19,440.00

$ 80,640.00
$ 80,640.00

$ 300,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509

ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) 10.00 $ 288.00
8 CORTADORA PARA CONCRETO DISCO DIAMANTADO ML 1.00 $ 5,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

Sika road ml 1 $ 800.00 5%


Vulken 750 Toxement o similar gl 0.05 $ 120,000.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
OFICIAL 1.00 $ 48,000.00 80% $ 86,400.00 30.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 28.80
$ 5,000.00

$ 5,028.80
$ 5,029.00

VR. PARCIAL

$ 840.00
$ 6,300.00

$ 7,140.00
$ 7,140.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 2,880.00

$ 2,880.00
$ 2,880.00

$ 15,049.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 5.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CAJA DE DISTRIBUCION UNID. 1.000 $ 80,000.00
TORNILLO RAPIDO DE 1" UNID. 10.000 $ 200.00
CONECTORES UNID. 4.000 $ 2,500.00
DUCTO DE ACOMETIDA ML 60.000 $ 15,000.00
CABLES DE ACOMETIDA ML 60.000 $ 21,456.33

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 34,020.00 $ 34,020.00
$ 157,000.00 $ 31,400.00

$ 65,420.00
$ 65,420.00

DESPERDICIO % VR. PARCIAL


5% $ 84,000.00
0% $ 2,000.00
0% $ 10,000.00
0% $ 900,000.00
0% $ 1,287,380.00
$ -
$ -
$ -

$ 2,283,380.00
$ 2,283,380.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 153,000.00
$ 1.00 $ 97,200.00
$ 1.00 $ 90,000.00

$ 340,200.00
$ 340,200.00

$ 2,689,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 14.18

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBOS CONDUIT 3/4" ML 1.000 $ 2,700.00
CABLE # 8 DE COBRE 7 HILOS ML 0.450 $ 55,000.00
AMARRES PLASTICOS UNID. 2.000 $ 450.00
CINTA BANDY ML 1.000 $ 8,000.00
HEBILLAS DE 5/8" UNID. 4.000 $ 5,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 680.40 $ 680.40
$ 314,000.00 $ 22,142.80

$ 22,823.20
$ 22,823.00

DESPERDICIO % VR. PARCIAL


5% $ 2,835.00
5% $ 25,987.50
0% $ 900.00
0% $ 8,000.00
0% $ 20,000.00
$ -
$ -
$ -

$ 57,722.50
$ 57,723.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 50.00 $ 3,060.00
$ 50.00 $ 1,944.00
$ 50.00 $ 1,800.00

$ 6,804.00
$ 6,804.00

$ 87,350.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 37.67

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBOS CONDUIT 3/4" ML 0.000 $ 2,700.00
CABLE ACOMETIDA LAMPARA ML 8.000 $ 7,826.45
AMARRES PLASTICOS UNID. 20.000 $ 450.00
CAJAS TERMINALES UND 2.000 $ 8,000.00
HEBILLAS DE 5/8" UNID. 0.000 $ 5,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 2,502.00 $ 2,502.00
$ 314,000.00 $ 8,335.59

$ 10,837.59
$ 10,838.00

DESPERDICIO % VR. PARCIAL


5% $ -
5% $ 65,742.20
0% $ 9,000.00
0% $ 16,000.00
0% $ -
$ -
$ -
$ -

$ 90,742.20
$ 90,742.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 10.00 $ 15,300.00
$ 10.00 $ 9,720.00

$ 25,020.00
$ 25,020.00

$ 126,600.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 57.24

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBOS CONDUIT 3/4" ML 16.000 $ 2,700.00
CABLE ACOMETIDA LAMPARA ML 16.000 $ 7,826.45
AMARRES PLASTICOS UNID. 20.000 $ 450.00
CAJAS TERMINALES UND 2.000 $ 8,000.00
HEBILLAS DE 5/8" UNID. 0.000 $ 5,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 4,170.00 $ 4,170.00
$ 314,000.00 $ 5,486.15

$ 9,656.15
$ 9,656.00

DESPERDICIO % VR. PARCIAL


5% $ 45,360.00
5% $ 131,484.40
0% $ 9,000.00
0% $ 16,000.00
0% $ -
$ -
$ -
$ -

$ 201,844.40
$ 201,844.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 6.00 $ 25,500.00
$ 6.00 $ 16,200.00

$ 41,700.00
$ 41,700.00

$ 253,200.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 100.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TABLERO DE CONTROL UNID. 1.000 $ 971,085.00
CABLE DE COBRE # 6 DE 7 HILOS ML 20.000 $ 7,000.00
CONTACTOR CON BOBINA DE 220V UNID. 1.000 $ 850,000.00
AUTOMATICOS UNID. 12.000 $ 12,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 42,525.00 $ 42,525.00
$ 314,000.00 $ 3,140.00

$ 45,665.00
$ 45,665.00

DESPERDICIO % VR. PARCIAL


0% $ 971,085.00
5% $ 147,000.00
0% $ 850,000.00
$ 144,000.00

$ -

$ 2,112,085.00
$ 2,112,085.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 0.80 $ 191,250.00
$ 0.80 $ 121,500.00
$ 0.80 $ 112,500.00

$ 425,250.00
$ 425,250.00

$ 2,583,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 103.97

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TABLERO PROTECCION ALUMBRADO UNID. 1.000 $ 450,000.00
CABLE DE COBRE # 6 DE 7 HILOS ML 10.000 $ 7,000.00
AUTOMATICOS UNID. 12.000 $ 12,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 25,680.00 $ 25,680.00
$ 314,000.00 $ 3,020.07

$ 28,700.07
$ 28,700.00

DESPERDICIO % VR. PARCIAL


0% $ 450,000.00
5% $ 73,500.00
$ 144,000.00

$ -

$ 667,500.00
$ 667,500.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.50 $ 102,000.00
$ 1.50 $ 64,800.00
$ 1.00 $ 90,000.00

$ 256,800.00
$ 256,800.00

$ 953,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 50.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
LAMPARAS LED DE400W UNID. 1.000 $ 970,786.00
TORNILLOS TODOROSCA DE 5/16" UNID. 1.000 $ 1,500.00
CINTA AISLANTE UNID. 0.670 $ 4,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 34,020.00 $ 34,020.00
$ 314,000.00 $ 6,280.00

$ 40,300.00
$ 40,300.00

DESPERDICIO % VR. PARCIAL


0% $ 970,786.00
0% $ 1,500.00
5% $ 2,814.00
$ -
$ -
$ -
$ -
$ -

$ 975,100.00
$ 975,100.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 153,000.00
$ 1.00 $ 97,200.00
$ 1.00 $ 90,000.00

$ 340,200.00
$ 340,200.00

$ 1,355,600.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 100.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CAJA DE DISTRIBUCION DE 40X40 UNID. 1.000 $ 167,443.81

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
UND

VR. UNIT. VR. PARCIAL


$ 5,004.00 $ 5,004.00
$ 314,000.00 $ 3,140.00

$ 8,144.00
$ 8,144.00

DESPERDICIO % VR. PARCIAL


5% $ 175,816.00
$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ 175,816.00
$ 175,816.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 5.00 $ 30,600.00
$ 5.00 $ 19,440.00

$ 50,040.00
$ 50,040.00

$ 234,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 10.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
VARILLA DE COBRE DE 2.40M ESPEZOR 5/8" UNID. 2.000 $ 212,075.00
HIDROSOLDA KG 30.000 $ 12,500.00
CONECTOR COPER WELLL DE 5/8" UNID. 1.000 $ 12,000.00
CAJA DE CONCRETO DE 40X40X40 UNID. 1.000 $ 350,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 ELECTRICISTA DIA 1.00 $ 85,000.00 80% $ 153,000.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00
AUXILIAR DIA 1.00 $ 50,000.00 80.00% $ 90,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 56,700.00 $ 56,700.00
$ 314,000.00 $ 31,400.00

$ 88,100.00
$ 88,100.00

DESPERDICIO % VR. PARCIAL


0% $ 424,150.00
5% $ 393,750.00
0% $ 12,000.00
0% $ 350,000.00
$ -
$ -
$ -
$ -

$ 1,179,900.00
$ 1,179,900.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 0.60 $ 255,000.00
$ 0.60 $ 162,000.00
$ 0.60 $ 150,000.00

$ 567,000.00
$ 567,000.00

$ 1,835,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00
8 ANDAMIOS DIA 30.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CANAL GALVANIZADO CAL 22 ML 1.000 $ 36,949.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 CUADRILLA CANALES DIA 1.00 $ 85,000.00 80% $ 153,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 1,912.50 $ 1,912.50
$ 314,000.00 $ 10,466.67

$ 12,379.17
$ 12,379.00

DESPERDICIO % VR. PARCIAL


0% $ 36,949.00

$ -
$ -
$ -
$ -

$ 36,949.00
$ 36,949.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 8.00 $ 19,125.00

$ 19,125.00
$ 19,125.00

$ 68,453.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.84
8 ANDAMIOS DIA 0.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBERIA PVC AGUAS LLUVIAS DE 4" ML 1.000 $ 18,500.00
UNION PVC 4" UND 1.000 $ 6,500.00
SOLDADURA UND 0.010 $ 58,500.00
LIMPIADOR UND 0.010 $ 36,949.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 450.00 $ 537.21
$ 314,000.00

$ 537.21
$ 537.00

DESPERDICIO % VR. PARCIAL


0% $ 18,500.00
0% $ 6,500.00
0% $ 585.00
0% $ 369.49
$ -
$ -
$ -
$ -

$ 25,954.49
$ 25,954.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 30.00 $ 1,620.00
$ 30.00 $ 2,880.00

$ 4,500.00
$ 4,500.00

$ 30,991.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.84

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBERIA NOVAFORT PVC 160 mm (6") ML 1.000 $ 28,500.00
UNION PVC 4" UND 1.000
SOLDADURA UND 0.010 $ 58,500.00
LIMPIADOR UND 0.010 $ 36,949.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 675.00 $ 805.81

$ 805.81
$ 806.00

DESPERDICIO % VR. PARCIAL


0% $ 28,500.00
0% $ -
0% $ 585.00
0% $ 369.49
$ -
$ -
$ -
$ -

$ 29,454.49
$ 29,454.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 20.00 $ 2,430.00
$ 20.00 $ 4,320.00

$ 6,750.00
$ 6,750.00

$ 37,010.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.84
8 ANDAMIOS DIA 0.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
CAJA DE INSPECCION PREFABRICADA UND 1.000 $ 273,086.00
TAPA PARA CAJA DE INSPECCION UND 1.000 $ 65,000.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 1,350.00 $ 1,611.62
$ 314,000.00

$ 1,611.62
$ 1,612.00

DESPERDICIO % VR. PARCIAL


0% $ 273,086.00
0% $ 65,000.00

$ -
$ -
$ -
$ -

$ 338,086.00
$ 338,086.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 10.00 $ 4,860.00
$ 10.00 $ 8,640.00

$ 13,500.00
$ 13,500.00

$ 353,198.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.99
8 ANDAMIOS DIA 0.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.
TUBERIA SANITARIA 4" ML 2.000 $ 18,500.00
UNION PVC 4" UND 2.000 $ 6,500.00
SOLDADURA UND 0.100 $ 58,500.00
LIMPIADOR UND 0.100 $ 36,949.00
CODO PVC 4" 90 C*C UND 1.000 $ 6,500.00
CODO PVC 4" 45 C* E UND 1.000 $ 6,500.00

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 1,350.00 $ 1,367.25
$ 314,000.00

$ 1,367.25
$ 1,367.00

DESPERDICIO % VR. PARCIAL


0% $ 37,000.00
0% $ 13,000.00
0% $ 5,850.00
0% $ 3,694.90
0% $ 6,500.00
0% $ 6,500.00
$ -
$ -

$ 72,544.90
$ 72,545.00

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 10.00 $ 4,860.00
$ 10.00 $ 8,640.00

$ 13,500.00
$ 13,500.00

$ 87,412.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: Err:509 Bultos de cemento

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 2,700.00
8 CARRETILLA BUGIE DIA 44.92 $ 180,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 5.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 5.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

UN

VR. PARCIAL
$ 2,700.00
$ 4,007.10

$ 6,707.10
$ 6,707.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 17,280.00
$ 9,720.00

$ 27,000.00
$ 27,000.00

$ 33,707.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,350.00
8 BENITIN DIA 14.72 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

MTS

VR. PARCIAL
$ 1,350.00
$ 8,150.96

$ 9,500.96
$ 9,501.00

VR. PARCIAL
$ -

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 4,860.00

$ 13,500.00
$ 13,500.00

$ 23,001.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: MATERIALES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 27,000.00
8 BENITIN DIA 5.00 $ 120,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
TUBERIA SANITARIA 6" ML 10.000 $ 25,500.00 5%
SILLA Y 6" UND 2.000 $ 6,500.00 0%
SOLDADURA UND 0.500 $ 58,500.00 0%
LIMPIADOR UND 0.500 $ 36,949.00 0%
ARREGLO EN POZO DE ENTREGA UND 1.000 $ 656,710.91 10%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 2.00 $ 48,000.00 80% $ 86,400.00 $ 1.00
19 AYUDANTE DIA 2.00 $ 27,000.00 80% $ 48,600.00 $ 1.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 27,000.00
$ 24,000.00

$ 51,000.00
$ 51,000.00

VR. PARCIAL
$ 267,750.00
$ 13,000.00
$ 29,250.00
$ 18,474.50
$ 722,382.00

$ 1,050,856.50
$ 1,050,857.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 172,800.00
$ 97,200.00

$ 270,000.00
$ 270,000.00

$ 1,371,857.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS FECHA

PROYECTO: 0 12/30/1899

CAPITULO: Err:509 UNIDAD


ITEM: Err:509 Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT. VR. PARCIAL
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.84 $ 1,350.00 $ 1,611.62

SUBTOTAL EQUIPOS/HERRAMIENTAS $ 1,611.62


VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS $ 1,612.00

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO % VR. PARCIAL
SILLA YEE DE 160 mm X 110 mm UND 1.000 $ 72,000.00 0% $ 72,000.00
UNION PVC 4" UND 1.000 0% $ -
SOLDADURA UND 0.010 $ 58,500.00 0% $ 585.00
LIMPIADOR UND 0.010 $ 36,949.00 0% $ 369.49
$ -
$ -
$ -
$ -

SUBTOTAL DE MATERIALES $ 72,954.49


VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS $ 72,954.00

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM VR. PARCIAL
26

SUBTOTAL TRANSPORTE $ -
VALOR REDONDEADO SUBTOTAL TRANSPORTE $ -

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO. VR. PARCIAL
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00 $ 4,860.00
OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00 $ 8,640.00

SUBTOTAL MANO DE OBRA $ 13,500.00


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA $ 13,500.00

TOTAL COSTO DIRECTO $ 88,066.00


ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 5.00 $ 5,250.00
PULIDORA CON DISCO DIAMANTADO DIA 23.81 $ 60,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 0.00 $ 48,000.00 80% $ 86,400.00 $ 20.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 20.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 1,050.00
$ 2,520.11

$ 3,570.11
$ 3,570.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ -
$ 2,430.00

$ 2,430.00
$ 2,430.00

$ 6,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.87 $ 5,250.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 15.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 15.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 6,000.09

$ 6,000.09
$ 6,000.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 5,760.00
$ 3,240.00

$ 9,000.00
$ 9,000.00

$ 15,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 2.33 $ 5,250.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
ANCLAJE EPOXICO INCLUYE EPOXICO UND 1.000 $ 2,500.00 0%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 20.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 20.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD
Err:509

VR. PARCIAL
$ 2,250.17

$ 2,250.17
$ 2,250.00

VR. PARCIAL
$ 2,500.00

$ 2,500.00
$ 2,500.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 4,320.00
$ 2,430.00

$ 6,750.00
$ 6,750.00

$ 11,500.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: PRELIMINARES
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 246.86

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
ALAMBRE NEGRO KG 0.050 $ 1,917.31 5%
ACERO REFUERZO PDR 60 KG 1.000 $ 2,500.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 35.00
19 AYUDANTE DIA 0.00 $ 27,000.00 80% $ 48,600.00 $ 35.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 246.86

$ 246.86
$ 247.00

VR. PARCIAL
$ 100.66
$ 2,625.00
$ -
$ -

$ 2,725.66
$ 2,726.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 2,468.57
$ -

$ 2,468.57
$ 2,469.00

$ 5,442.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 1.00 $ 1,350.00
8 FORMALETA DIA 4.78 $ 62,709.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %
CONCRETO SIMPLE 3000 PSI M3 0.100 $ 350,000.00 5%

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 OFICIAL DIA 1.00 $ 48,000.00 80% $ 86,400.00 $ 10.00
19 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00 $ 10.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL
$ 1,350.00
$ 13,130.68

$ 14,480.68
$ 14,481.00

VR. PARCIAL
$ 36,750.00

$ 36,750.00
$ 36,750.00

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 8,640.00
$ 4,860.00

$ 13,500.00
$ 13,500.00

$ 64,731.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND. VR. UNIT.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.00 $ 70,000.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT. DESPERDICIO %

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM. PRECIO/KM
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT RDTO.
18 SUB/REFORMA VENTANERIA GLB 1.00 $ 700,000.00 0% $ 700,000.00 $ 1.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


FECHA

12/30/1899

UNIDAD

Err:509

VR. PARCIAL

$ 0.00
$ -

VR. PARCIAL
$ -

$ -
$ -

VR. PARCIAL

$ -
$ -

VR. PARCIAL
$ 700,000.00

$ 700,000.00
$ 700,000.00

$ 700,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: Err:509
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
SUB/RESANES PISOS Y PLACAS GLB 1.00 $ 1,000,000.00 0% $ 1,000,000.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

Err:509

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL


$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 1,000,000.00

$ 1,000,000.00
$ 1,000,000.00

$ 1,000,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: CIMENTACION
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
SUB/PINTURA MUROS GLB 1.00 $ 700,000.00 0% $ 700,000.00
CARPINTERIA METALICA

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


OS
FECHA

12/30/1899

UNIDAD

Err:509

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL

$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 700,000.00

$ 700,000.00
$ 700,000.00

$ 700,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: ASEO
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1 HERRAMIENTA MENOR (10% mano de obra) DIA 0.84
8 ANDAMIOS DIA 0.00

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26 VOLQUETA PARA RETIRO ESCOMBROS 1.00 M3 22.08

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL


$ 607.50 $ 722.14
$ 314,000.00

$ 722.14
$ 722.00

DESPERDICIO % VR. PARCIAL

$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL


$ 1,000.00 $ 22,079.00

$ 22,079.00
$ 22,079.00

RDTO. VR. PARCIAL


$ 8.00 $ 6,075.00

$ 6,075.00
$ 6,075.00

$ 28,876.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: ASEO
ITEM: 4.01 ASEO Y LIMPIEZA GENERAL DE OBRA

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 AYUDANTE DIA 1.00 $ 27,000.00 80% $ 48,600.00

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
GL

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL

$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 10.00 $ 4,860.00

$ 4,860.00
$ 4,860.00

$ 4,860.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: ASEO
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 SUB/ENSAYO LABORATORIO GLB 1.00 $ 200,000.00 0% $ 200,000.00
COMPRENSION CONCRETO

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL

$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 200,000.00

$ 200,000.00
$ 200,000.00

$ 200,000.00
ANALISIS DE PRECIOS UNITARIOS
CONTRATISTA: CONSTRUCTORA HABITAT DEL ORIENTE SAS

PROYECTO: 0

CAPITULO: ASEO
ITEM: Err:509 Err:509

I. EQUIPOS/HERRAMINETAS
No. ART. DESCRIPCION UNID. REND.
1
8

SUBTOTAL EQUIPOS/HERRAMIENTAS
VALOR REDONDEADO SUBTOTAL DE EQUIPOS/HERRAMIENTAS

II. MATERIALES E INSUMOS


No. ART. DESCRIPCION UNID. CANT. VR. UNIT.

SUBTOTAL DE MATERIALES
VALOR REDONDEADO SUBTOTAL DE MATERIALES E INSUMOS

III. TRANSPORTE
No. ART. DESCRIPCION CANT. UNID. KM.
26

SUBTOTAL TRANSPORTE
VALOR REDONDEADO SUBTOTAL TRANSPORTE

IV. MANO DE OBRA


No. ART. DESCRIPCION UNID. CANT. JORNAL %. PREST. P.UNIT
18 SUB/ENSAYO LABORATORIO GLB 1.00 $ 200,000.00 0% $ 200,000.00
PROCTOR MODIFICADO

SUBTOTAL MANO DE OBRA


VALOR REDONDEADO SUBTOTAL DE MANO DE OBRA

TOTAL COSTO DIRECTO


S
FECHA

12/30/1899

UNIDAD
Err:509

VR. UNIT. VR. PARCIAL

$ 0.00
$ -

DESPERDICIO % VR. PARCIAL

$ -
$ -
$ -
$ -

$ -
$ -

PRECIO/KM VR. PARCIAL

$ -
$ -

RDTO. VR. PARCIAL


$ 1.00 $ 200,000.00

$ 200,000.00
$ 200,000.00

$ 200,000.00

Вам также может понравиться