REYES CONSTRUCCIONES Y CONSULTORIA EIRL.

PRESUPUESTO
FECHA: 15/01/2019
SUBCONTRATISTA
REYES CONSTRUCCIONES Y CONSULTORIA E.I.R.L
PRESUPUESTO RED COMPLEMENTARIA DE RED DE AGUA Y ALCANTARILLADO Y CONEXIÓNES DOMICILIARIAS
CLIENTE "ASOCIACION CULTURAL PERUANO BRITANICO"
LUGAR AV LOS RUISEÑORES 215, SUB LOTE A5, FUNDO INQUISIDOR - SANTA ANITA

Item Descripcion Unid. Metrado Precio S/. Parcial S/.


1 SISTEMA DE ALCANTARILLADO 38,641.25

1.01 OBRAS PROVISIONALES 4,500.00


OBTENCION Y GESTION DE PERMISOS OCUPACION DE VIAS Y DE 1.00 4,000.00 4,000.00
DESVIO DE TRANSITO
1.01.01 glb
CAMPAMENTO PROVISIONAL INC.CASETAS DE GUARDIANIA Y glb 1.00 500.00 500.00
ALAMACEN
1.01.02
1.02 TRABAJOS PRELIMINARES 4,196.93

1.02.01 CINTA PLASTICA P/SEÑAL DE PELIGRO m 73.00 0.62 45.26

1.02.02 LIMPIEZA DE TERRENO MANUAL m 73.00 0.66 48.18


TRANQUERA TIPO TIJERA 2.40x1.2M PARA SEÑAL DE PELIGRO 4.00 203.84 815.36
1.02.03 und
1.02.04 TRAZO Y REPLANTEO INICIAL DE OBRA m 73.00 1.19 86.87

1.02.05 PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DU m 4.00 233.94 935.76
1.02.06 PUENTE METALICO 2,4x1,20 m PARA PASE VEHICULAR S/ZANJA S/D 5.00 353.10 1,765.50
(PROV. DURANTE LA OBRA)
Unid.
1.02.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 500.00 500.00

1.03 MOVIMIENTO DE TIERRAS 13,764.88

1.03.01 EXCAV. (MAQ.)P/TUB.T.NORMAL DE 1.01m a 1.50m PROF. m 73.00 33.26 2,427.98


REFINE Y NIVELAC. DE ZANJA.T. N. PARA TUB. DE 1.01 A 1.50m 73.00 4.52 329.96
PROF.
1.03.02 m
1.03.03 PREPARARCION Y COLOCACION CAMA DE APOYO PARA TUB. 73.00 8.56 624.88
E=0.10 m C/A. GRUESA
m
RELLENO DE ZANJA ALREDEDOR DE TUBERIA 30 CMS SOBRE 73.00 35.22 2,571.06
TUB.C/A.GRUESA
1.03.04 m
1.03.05 RELLENO Y COMPACTACION DE ZANJA CON MAT. DE PRESTAMO 73.00 75.00 5,475.00
ANTES AFIRMADO
m
1.03.06 ELIMINACION DE MATERIAL EXCEDENTE 73.00 32.00 2,336.00
ml
1.04 ROTURA Y REPOSICION DE PAVIMENTOS 4,329.44
1.04.01 CORTE,ROTURA Y REPOSICION DE VEREDAS 4.00 125.51 502.04
ml
1.04.02 CORTE,ROTURA Y REPOSICION DE PAVIMENTO DE ASFALTO e = 2" 63.79 60.00 3,827.40
ml
1.05 SUMINISTRO E INSTALACION DE TUBERIAS 3,025.85
1.05.01 INSTALACION DE TUBERIA DE 200 mm PVC UF SN 2 73.00 38.20 2,788.60
m
1.05.02 PRUEBA HIDRAULICA 73.00 3.25 237.25
m
1.06 INSTALACION DE BUZONES 8,250.00
1.06.01 INSTALACION DE BUZONES 2.00 3,500.00 7,000.00
U
1.06.02 EMPALME A BUZON EXISTENTE 1.00 1,250.00 1,250.00
U
1.06 CNX DOMICILIARIA DE ALCANTARILLADO 2.00 1,800.00 3,600.00
u
2 SISTEMA DE AGUA POTABLE 30,183.02

2.01 TRABAJOS PRELIMINARES 6,011.58

2.01.01 CINTA PLASTICA P/SEÑAL DE PELIGRO m 92.90 0.62 57.60

2.01.02 LIMPIEZA DE TERRENO MANUAL m 92.90 0.66 61.31


TRANQUERA TIPO TIJERA 2.40x1.2M PARA SEÑAL DE PELIGRO 4.00 203.84 815.36
2.01.03 und
2.01.04 TRAZO Y REPLANTEO INICIAL DE OBRA m 92.90 1.19 110.55

2.01.05 PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. DU m 4.00 233.94 935.76
PUENTE METALICO 2,4x1,20 m PARA PASE VEHICULAR S/ZANJA S/D 10.00 353.10 3,531.00
(PROV. DURANTE LA OBRA)
2.01.06 Unid.
2.01.07 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 500.00 500.00

2.02 MOVIMIENTO DE TIERRAS 10,046.21

2.02.01 EXCAV. (MAQ.)P/TUB.T.NORMAL DE 1.01m a 1.50m PROF. m 92.90 19.19 1,782.75


REFINE Y NIVELAC. DE ZANJA.T. N. PARA TUB. DE 1.01 A 1.50m 92.90 3.25 301.93
PROF.
2.02.02 m
PREPARARCION Y COLOCACION CAMA DE APOYO PARA TUB. 92.90 7.19 667.95
E=0.10 m C/A. GRUESA
2.02.03 m
RELLENO DE ZANJA ALREDEDOR DE TUBERIA 30 CMS SOBRE 92.90 19.39 1,801.33
TUB.C/A.GRUESA
2.02.04 m
RELLENO Y COMPACTACION DE ZANJA CON MAT. DE PRESTAMO 92.90 35.60 3,307.24
ANTES AFIRMADO
2.02.05 m
2.02.06 ELIMINACION DE MATERIAL EXCEDENTE ml 92.90 23.52 2,185.01
2.03 ROTURA Y REPOSICION DE PAVIMENTOS 5,639.22
2.03.01 CORTE,ROTURA Y REPOSICION DE VEREDAS 2.00 125.51 251.02
ml
2.03.02 CORTE,ROTURA Y REPOSICION DE PAVIMENTO DE ASFALTO e = 2" 92.90 58.00 5,388.20
ml
2.04 SUMINISTRO E INSTALACION DE TUBERIAS 6,686.01
2.04.01 TERMOFUSION DE TUBERIAS DE 160 mm HDPE 92.90 31.20 2,898.48
m
2.04.02 SUMINISTRO E INSTALACION DE TUBERIA DE 160 mm HDPE 92.90 37.52 3,485.61
m
2.04.03 PRUEBA HIDRAULICA 92.90 3.25 301.93
m
2.05 CNX DOMICILIARIA de 50mm 1.00 1,800.00 1,800.00
u

COSTO DIRECTO 68,824.27

GASTOS GENERALES 12% 8,258.91

UTILIDAD 5% 3,441.21

SUBTOTAL 80,524.40

IGV 18% 14,494.39

TOTAL 95,018.79
Nueva Propuesta
Metrado Precio

1 5,000.00
5000 1.00 5,000.00 5000 0.00 -1,000.00

1 1,500.00
1500 1.00 1,500.00 1500 0.00 -1,000.00
0 0.00 0.00 0 0.00 0.00
73 0.62 45.26 73.00 0.62 45.26 0.00 0.00
73 0.66 48.18 73.00 0.66 48.18 0.00 0.00

4 203.84
815.36 4.00 203.84 815.36 0.00 0.00
73 1.19 86.87 73.00 1.19 86.87 0.00 0.00
4 233.94 935.76 4.00 233.94 935.76 0.00 0.00

5 353.1
1765.5 5.00 353.10 1765.5 0.00 0.00
1 1,500.00 1500 1.00 1,500.00 1500 0.00 -1,000.00
0 0.00 0.00 0 0.00 0.00
73 33.26 2427.98 73.00 33.26 2427.98 0.00 0.00

73 4.52
329.96 73.00 4.52 329.96 0.00 0.00

73 8.56
624.88 73.00 8.56 624.88 0.00 0.00

73 35.22
2571.06 73.00 35.22 2571.06 0.00 0.00

73 75
5475 73.00 75.00 5475 0.00 0.00
73 32 2336 73.00 32.00 2336 0.00 0.00
0 0.00 0.00 0 0.00 0.00
4 125.51 502.04 4.00 125.51 502.04 0.00 0.00

63.79 60
3827.4 63.79 60.00 3827.4 0.00 0.00
0 0.00 0.00 0 0.00 0.00
73 38.2 2788.6 73.00 38.20 2788.6 0.00 0.00
73 3.25 237.25 73.00 3.25 237.25 0.00 0.00
0 0.00 0.00 0 0.00 0.00
2 3,905.00 7810 2.00 3,905.00 7810 0.00 -405.00
1 1,250.00 1250 1.00 1,250.00 1250 0.00 0.00
2 2,850.00 5700 2.00 2,850.00 5700 0.00 -1,050.00
0 0.00 0.00 0 0.00 0.00
0 0.00 0.00 0 0.00 0.00
0 0.00 0.00 0 0.00 0.00
92.9 0.62 57.598 92.90 0.62 57.598 0.00 0.00
92.9 0.66 61.314 92.90 0.66 61.314 0.00 0.00

4 203.84
815.36 4.00 203.84 815.36 0.00 0.00
92.9 1.19 110.551 92.90 1.19 110.551 0.00 0.00
4 233.94 935.76 4.00 233.94 935.76 0.00 0.00

10 353.1
3531 10.00 353.10 3531 0.00 0.00
1 1,500.00 1500 1.00 1,500.00 1500 0.00 -1,000.00
0 0.00 0.00 0 0.00 0.00
92.9 19.19 1782.751 92.90 19.19 1782.751 0.00 0.00

92.9 3.25
301.925 92.90 3.25 301.925 0.00 0.00

92.9 7.19
667.951 92.90 7.19 667.951 0.00 0.00

92.9 19.39
1801.331 92.90 19.39 1801.331 0.00 0.00

92.9 35.6
3307.24 92.90 35.60 3307.24 0.00 0.00
92.9 23.52 2185.008 92.90 23.52 2185.008 0.00 0.00
0 0.00 0.00 0 0.00 0.00
2 125.51 251.02 2.00 125.51 251.02 0.00 0.00

92.9 58
5388.2 92.90 58.00 5388.2 0.00 0.00
0 0.00 0.00 0 0.00 0.00
92.9 31.2 2898.48 92.90 31.20 2898.48 0.00 0.00

92.9 37.52
3485.608 92.90 37.52 3485.608 0.00 0.00
92.9 3.25 301.925 92.90 3.25 301.925 0.00 0.00
1.00 8,500.00 8500 1.00 1,800.00 1800 0.00 -6,700.00

16,635.85 85,460.12 78,760.12 -12,155.00


10,255.21 9,451.21
4,273.01 3,938.01
19,463.94 99,988.34 92,149.34 11,624.94
17,997.90 16,586.88
117,986.24 108,736.22

19,463.94
90,915.12

7,839.00
REYES CONSTRUCCIONES Y CONSULTORIA EIRL.

PRESUPUESTO
FECHA: 15/01/2019

SUBCONTRATISTA
REYES CONSTRUCCIONES Y CONSULTORIA E.I.R.L
PRESUPUESTO RED COMPLEMENTARIA DE RED DE AGUA Y ALCANTARILLADO Y CONEXIÓNES DOMICILIARIAS
CLIENTE "ASOCIACION CULTURAL PERUANO BRITANICO"

LUGAR AV LOS RUISEÑORES 215, SUB LOTE A5, FUNDO INQUISIDOR - SANTA ANITA

Item Descripcion Unid. Metrado Precio S/. Parcial S/.


1 SISTEMA DE ALCANTARILLADO 46,067.10

OBRAS PROVISIONALES 6,500.00


1.01
OBTENCION Y GESTION DE PERMISOS OCUPACION DE VIAS Y DE 1.00 5,000.00 5,000.00
DESVIO DE TRANSITO
1.01.01 glb
CAMPAMENTO PROVISIONAL INC.CASETAS DE GUARDIANIA Y glb 1.00 1,500.00 1,500.00
ALAMACEN
1.01.02
TRABAJOS PRELIMINARES 5,196.93
1.02
CINTA PLASTICA P/SEÑAL DE PELIGRO 73.00 0.62 45.26
1.02.01 m 12 7.44
LIMPIEZA DE TERRENO MANUAL 73.00 0.66 48.18
1.02.02 m 12 7.92
TRANQUERA TIPO TIJERA 2.40x1.2M PARA SEÑAL DE PELIGRO 4.00 203.84 815.36
1.02.03 und 0
TRAZO Y REPLANTEO INICIAL DE OBRA 73.00 1.19 86.87
1.02.04 m 0
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. 4.00 233.94 935.76
1.02.05 DURANTE LA OBRA) m 0
1.02.06 PUENTE METALICO 2,4x1,20 m PARA PASE VEHICULAR S/ZANJA S/D 5.00 353.10 1,765.50
(PROV. DURANTE LA OBRA)
Unid. 0
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 1,500.00 1,500.00
1.02.07 glb 0
MOVIMIENTO DE TIERRAS 13,764.88
1.03 0
EXCAV. (MAQ.)P/TUB.T.NORMAL DE 1.01m a 1.50m PROF. 73.00 33.26 2,427.98
1.03.01 m 12 399.12
REFINE Y NIVELAC. DE ZANJA.T. N. PARA TUB. DE 1.01 A 1.50m 73.00 4.52 329.96
PROF.
1.03.02 m 12 54.24
1.03.03 PREPARARCION Y COLOCACION CAMA DE APOYO PARA TUB. 73.00 8.56 624.88
E=0.10 m C/A. GRUESA
m 12 102.72
RELLENO DE ZANJA ALREDEDOR DE TUBERIA 30 CMS SOBRE 73.00 35.22 2,571.06
TUB.C/A.GRUESA
1.03.04 m 12 422.64
1.03.05 RELLENO Y COMPACTACION DE ZANJA CON MAT. DE PRESTAMO 73.00 75.00 5,475.00
ANTES AFIRMADO
m 12 900
1.03.06 ELIMINACION DE MATERIAL EXCEDENTE 73.00 32.00 2,336.00
ml 12 384
1.04 ROTURA Y REPOSICION DE PAVIMENTOS 4,329.44
0
1.04.01 CORTE,ROTURA Y REPOSICION DE VEREDAS 4.00 125.51 502.04
ml 0
1.04.02 CORTE,ROTURA Y REPOSICION DE PAVIMENTO DE ASFALTO e = 2" 63.79 60.00 3,827.40
ml 12 720
SUMINISTRO E INSTALACION DE TUBERIAS 3,025.85
1.05 0
1.05.01 INSTALACION DE TUBERIA DE 200 mm PVC UF SN 2 73.00 38.20 2,788.60
m 12 458.4
1.05.02 PRUEBA HIDRAULICA 73.00 3.25 237.25
m 0
1.06 INSTALACION DE BUZONES 8,250.00
0
1.06.01 INSTALACION DE BUZONES 2.00 3,500.00 7,000.00
U 0
1.06.02 EMPALME A BUZON EXISTENTE 1.00 1,250.00 1,250.00
U 0
1.06 CNX DOMICILIARIA DE ALCANTARILLADO 2.00 2,500.00 5,000.00
u 0
0
2 SISTEMA DE AGUA POTABLE 30,883.02
0
TRABAJOS PRELIMINARES 7,011.58
2.01 0
CINTA PLASTICA P/SEÑAL DE PELIGRO 92.90 0.62 57.60
2.01.01 m 0
LIMPIEZA DE TERRENO MANUAL 92.90 0.66 61.31
2.01.02 m 0
TRANQUERA TIPO TIJERA 2.40x1.2M PARA SEÑAL DE PELIGRO 4.00 203.84 815.36
2.01.03 und 0
TRAZO Y REPLANTEO INICIAL DE OBRA 92.90 1.19 110.55
2.01.04 m 0
Item Descripcion Unid. Metrado Precio S/. Parcial S/.
PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA S/D (PROV. 4.00 233.94 935.76
2.01.05 DURANTE LA OBRA) m 0
PUENTE METALICO 2,4x1,20 m PARA PASE VEHICULAR S/ZANJA S/D 10.00 353.10 3,531.00
(PROV. DURANTE LA OBRA)
2.01.06 Unid. 0
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 1,500.00 1,500.00
2.01.07 glb 0
MOVIMIENTO DE TIERRAS 10,046.21
2.02 0
EXCAV. (MAQ.)P/TUB.T.NORMAL DE 1.01m a 1.50m PROF. 92.90 19.19 1,782.75
2.02.01 m 0
REFINE Y NIVELAC. DE ZANJA.T. N. PARA TUB. DE 1.01 A 1.50m 92.90 3.25 301.93
PROF.
2.02.02 m 0
PREPARARCION Y COLOCACION CAMA DE APOYO PARA TUB. 92.90 7.19 667.95
E=0.10 m C/A. GRUESA
2.02.03 m 0
RELLENO DE ZANJA ALREDEDOR DE TUBERIA 30 CMS SOBRE 92.90 19.39 1,801.33
TUB.C/A.GRUESA
2.02.04 m 0
RELLENO Y COMPACTACION DE ZANJA CON MAT. DE PRESTAMO 92.90 35.60 3,307.24
ANTES AFIRMADO
2.02.05 m 0
ELIMINACION DE MATERIAL EXCEDENTE 92.90 23.52 2,185.01
2.02.06 ml 0
2.03 ROTURA Y REPOSICION DE PAVIMENTOS 5,639.22
0
2.03.01 CORTE,ROTURA Y REPOSICION DE VEREDAS 2.00 125.51 251.02
ml 0
2.03.02 CORTE,ROTURA Y REPOSICION DE PAVIMENTO DE ASFALTO e = 2" 92.90 58.00 5,388.20
ml 0
2.04 SUMINISTRO E INSTALACION DE TUBERIAS 6,686.01
0
2.04.01 TERMOFUSION DE TUBERIAS DE 160 mm HDPE 92.90 31.20 2,898.48
m 0
2.04.02 SUMINISTRO E INSTALACION DE TUBERIA DE 160 mm HDPE 92.90 37.52 3,485.61
m 0
2.04.03 PRUEBA HIDRAULICA 92.90 3.25 301.93
m 0
2.05 CNX DOMICILIARIA de 50mm 1.00 1,500.00 1,500.00
u 0
0
3,500.00
grifo contraimcendio U 1 1 3500
76,950.12
COSTO DIRECTO 6956.48
12% 9,234.01 834.78
GASTOS GENERALES
5% 3,847.51 347.82
UTILIDAD
90,031.64
SUBTOTAL 8139.0816
18% 16,205.70 1,465.03
IGV
106,237.34
TOTAL 9604.116288