Вы находитесь на странице: 1из 70

Sunfree Series

User Manual

SAJ Hybrid Solar Inverter


Sunfree Series

www.saj-electric.com

- 0 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Preface

Thank you for choosing an SAJ hybrid solar inverter. We are pleased to
provide you with first-class products and exceptional service.
This manual includes information for installation, operation, maintenance,
trouble shooting and safety. Please follow the instructions of this manual
so that we can ensure delivery of our professional guidance and
wholehearted service.
Customer-orientation is forever our commitment. We hope this document
proves to be of great assistance in your journey for a cleaner, greener
world.
Please check for the latest version at www.saj-electric.com

Guangzhou Sanjing Electric Co., Ltd.

Zero-Carbon Innovator

- 1 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Content

Preface .................................................................................................... - 1 -
Chapter 1 Safety Precautions .............................................................. - 4 -
1.1 Scope of Application ............................................................................... - 4 -
1.2 Safety Instructions ................................................................................... - 4 -
1.3 Target Group............................................................................................ - 5 -

Chapter 2 Preparation .......................................................................... - 6 -


2.1 Safety Instructions ................................................................................... - 6 -
2.2 Explanations of Symbols......................................................................... - 8 -

Chapter 3 Product Information .......................................................... - 10 -


3.1 Application Scope of Products .............................................................. - 10 -
3.2 Specification for Product Model ........................................................... - 11 -
3.3 Overview and Dimensions of products ................................................. - 11 -
3.4 Datasheet ............................................................................................... - 12 -

Chapter 4 Instructions for installation ............................................... - 14 -


4.1 Safety Instructions ................................................................................. - 14 -
4.2 Pre-installation Check ........................................................................... - 14 -
4.3 The Determination of the Installation Method and Position ................. - 16 -
4.4 Mounting Procedure .............................................................................. - 18 -

Chapter 5 Electrical Connection ........................................................ - 20 -


5.1 Safety Instruction for Hot-line Job ........................................................ - 20 -
5.2 Specifications for Electrical Interface ................................................... - 21 -
5.3 AC input wire Connection ..................................................................... - 22 -
5.4 Backup Output Connection ................................................................... - 23 -
5.5 PV Connection .................................................................................... - 25 -
5.6 Battery connection ................................................................................ - 28 -

- 2 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.7 Communication Connection.................................................................. - 29 -

Chapter 6 Debugging Instructions ..................................................... - 31 -


6.1 Introduction of Human-computer Interface .......................................... - 31 -
6.2 First Run Setup ...................................................................................... - 32 -
6.3 Monitoring Operation and Battery manage system .............................. - 55 -

Chapter 7 Fault Code and Troubleshooting ....................................... - 56 -


Chapter 8 Recycling and Disposal .................................................... - 60 -
Chapter 9 Guarantee Service ............................................................. - 61 -
Chapter 10 Contact SAJ..................................................................... - 62 -
SAJ Warranty Policy .......................................................................... - 63 -
Warranty Card ...................................................................................... - 67 -

- 3 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 1 Safety Precautions

1.1 Scope of Application


This User Manual describes instructions and detailed procedures for installing,
operating, maintaining, and troubleshooting of the following SAJ hybrid solar
inverters:
Sunfree 5K, Sunfree 4K, Sunfree 5K-HC, Sunfree 4K-HC,

Please keep this manual all time available in case of emergency.

1.2 Safety Instructions

DANGER
· DANGER indicates a hazardous situation which, if not avoided, will result in death or
serious injury.

WARNING
· WARNING indicates a hazardous situation which, if not avoided, can result in death or
serious injury or moderate injury.

CAUTION
· CAUTION indicates a hazardous condition which, if not avoided, can result in minor or
moderate injury.

NOTICE
· NOTICE indicates a situation that can result in potential damage, if not avoided.

- 4 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

1.3 Target Group


Only qualified electricians who have read and fully understood all safety

regulations contained in this manual can install, maintain and repair the inverter.
Operators must be aware of the high-voltage device.

- 5 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 2 Preparation

2.1 Safety Instructions

DANGER
· There is possibility of during to electrical shock and high voltage.
· Do not touch the operating component of the inverter, it might result in burning or death.
· To prevent risk of electric shock during installation and maintenance, please make sure
that all AC and DC terminals are plugged out.
· Do not touch the surface of the inverter while the housing is wet, it might lead to electrical
shock.
· Do not stay close to the inverter while there are severe weather conditions including storm,
lighting, etc.
· Before opening the housing, the SAJ inverter must be disconnected from the grid and PV
generator; you must wait at least five minutes to let the energy storage capacitors fully
discharged after disconnecting from power source.

WARNING
·The installation, service, recycling and disposal of the inverters must be performed by
qualified personnel only in compliance with national and local standards and regulations.
·Any unauthorized actions including modification of product functionality of any form may
cause lethal hazard to the operator, third parties, the units or their property. SAJ is not
responsible for the loss and these warranty claims.
·The SAJ inverter must only be operated with PV generator. Do not connect any other
source of energy to the SAJ inverter.
·Be sure that the PV generator and inverter are well grounded in order to protect properties
and persons.

CAUTION
·The inverter will become hot during operation. Please do not touch the heat sink or
peripheral surface during or shortly after operation.
·Risk of damage due to improper modifications.
·Risk of damage due to improper modifications.

- 6 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

NOTICE
·Public utility only.
·The PV inverter is designed to feed AC power directly to the public utility power grid; do
not connect AC output of the inverter to any private AC equipment.

- 7 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

2.2 Explanations of Symbols


Symbol Description
Dangerous electrical voltage
This device is directly connected to public grid, thus all work to the inverter shall
only be carried out by qualified personnel.
DANGER to life due to high electrical voltage!
There might be residual currents in inverter because of large capacitors. Wait 5
MINUTES before you remove the front lid.

NOTICE, danger!
This is directly connected with electricity generators and public grid.

Danger of hot surface


The components inside the inverter will release a lot of heat during operation. Do
not touch metal plate housing during operating.

An error has occurred


Please go to Chapter 9 “Troubleshooting” to remedy the error.

This device SHALL NOT be disposed of in residential waste


Please go to Chapter 8 “Recycling and Disposal” for proper treatments.

Without Transformer
This inverter does not use transformer for the isolation function.

Security Certificate
The inverter complies with European product safety instructions.

CE Mark
Equipment with the CE mark fulfills the basic requirements of the Guideline
Governing Low-Voltage and Electro-magnetic Compatibility.

SAA Mark
The inverter complies with the requirement of Equipment and Product Safety Act in
Australia.

- 8 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

CQC Mark
Equipment standard with China Quality Inspection Center safety directive.

No unauthorized perforations or modifications


Any unauthorized perforations or modifications are strictly forbidden, if any
defect or damage(device/person) is occurred, SAJ shall not take any
responsibility for it.

- 9 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 3 Product Information

3.1 Application Scope of Products


Sunfree series products are hybrid solar inverters without transformers, and the
inverters are important components of energy storage systems.

The Sunfree inverters change the DC generated by solar panels into AC which is in
accordance with the requirements of public grid and send the AC into the grid,
Reduce the load pressure of the grid.

When the grid failure, provide 230V AC source to supply important loads,
achieve off-grid backup power supply function.

Figure3.1 Sunfree series application

- 10 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

3.2 Specification for Product Model


Sunfree 5k -HC
① ② ③
① Sununo Plus represents for product name.
② XK represents rated power XkW of inverter, for example 5K means 5kW.
③ HC represents the inverter has the function of high charge current.

3.3 Overview and Dimensions of products


The dimensions of Sununo Plus series products is shown in Figure 3.2.

C
Sunfree 4K/5K/4K-HC/5K-HC
Figure 3.2 Dimensions of Sunfree series Products

- 11 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

3.4 Datasheet
Sunfree 4K/5K specification sheet
MODEL Sunfree 4K Sunfree 5K
DC Input Data
Max. PV Array Power [W] 4200 5200
Maximum PV Array Open Circuit Voltage [v] 580
MPPT Range @ Operating Voltage [v] 90~550
Start Voltage [v] 120
Min. DC Voltage [v] 80
Max. DC Input Current PV1/PV2[A] 11 / 11
Number of DC Connection/MPPT Tracker
2/2
Number
DC Switch Integrated
Battery Data
Battery Type Li-ion battery / Lead-acid battery
Battery Voltage/Range of Voltage [v] 48 / 42~58
Maximum/Rated Charge Current [A] 50 / 50
Min. Battery Capacity [AH] 100
3-Stage Adaptive With Maintenance / 3-Stage
Charging Curve
Adaptive With Maintenance
Grid-Tie Operation
Rated Output Power [W] 36801 / 4000 4600² / 5000
Rated Output Current [A] 16 / 17.4 20 / 21.7
Rated Grid voltage/Range [v] 220V,230V,240V / 180V~280V
Rated Grid Frequency / Range [Hz] 50Hz / 60 Hz ± 5 Hz
Power Factor >0.99
Total Harmonic Distortion (THDi) <3%
AC Output Data
Rated Output Power 36801W/ 4000VA 4600²W/ 5000VA
AC Voltage Regulation [v] 230 ± 1%
Rated Output Frequency Regulation [Hz] 50 ± 0.02
Total Harmonic Distortion (THDi) <5%(non-linear load);<3%(Linear load)
Overload(Batt. Mode) 6000VA(150% 10s) 7500VA(150% 10s)
Overload(Grid. Mode) 6000VA(150% 1min) 7500VA(150% 1min)

- 12 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Efficiency
Max. Efficiency 97.60%
Euro Efficiency 97.00%
MPPT Adaptation Efficiency >99.5%
Protection
AC Short Circuit Protection Integrated
Overload Protection Integrated
DC Voltage High/Low Protection Integrated
AC Voltage High/Low Protection Integrated
AC Frequency High/Low Protection Integrated
High Temperature Protection Integrated
Anti-islanding protection Integrated
Valley Peak Period Selection Integrated
Interface
PV Connection Type MC4/H4
Battery Connection Type Terminal Block
AC Connection Type Terminal Block
Display LCD
RS485*2& RS232(Integrated)
;Wi-Fi / GPRS /
Communication
Ethernet(Optional)
General Data
Topology Transformerless
Protection Degree IP65
Ambient Temperature Range -25~60℃(45~60℃ derating)
Relative humidity 0~100%(No Condensing)
Max. Operating Altitude 2000m
Noise emision <25dB
Cooling method Nature convection
Dimensions(W×H×D) 470mm*470mm*200mm
Weight 30kg
Certification CE & VDE & SAA
Standard Warranty 5 Years
1.Meet the grid standard that AC current per phase not exceeding 16A.
2.Meet the VDE - ARN - N 4105 that biggest apparent power of single-phase is 4600 VA.

- 13 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 4 Instructions for installation

4.1 Safety Instructions

DANGER
· Dangerous to life due to potential fire or electricity shock.
· Do not install the inverter near any inflammable or explosive items.
· This inverter will be directly connected with HIGH VOLTAGE power generation device;
the installation must be performed by qualified personnel only in compliance with national
and local standards and regulations.

NOTICE
· This equipment is suit for the pollution degree II.
· Inappropriate or the harmonized installation environment may jeopardize the life span of
the inverter.
· Installation directly exposed under intensive sunlight is not recommended.
· The installation site must be well ventilated.

4.2 Pre-installation Check


4.2.1 Check the Package
Although SAJ’s inverters have surpassed stringent testing and are checked before
they leave the factory, it is uncertain that the inverters may suffer damages during
transportation. Please check the package for any obvious signs of damage, and if
such evidence is present, do not open the package and contact your dealer as soon as
possible

4.2.2 Check the Assembly Parts


After opening the package, please refer to Table 4.1 and 4.2 to check the
completeness of the assembly parts. Please contact your dealer if anything is
damaged or missing.

- 14 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

A B C D E

F G H I
Table 4.1 Assembly Parts List

Object Name Number Unit Remarks

A Inverter 1 Set
B Rear Panel 1 Piece
C DC Connector 2 Pair
D M6×50 hex head screw 3 Piece
E Expansion tube 3 Piece
M5×12 hex head screw
F 2 Piece
and gasket
G AC connector 1 Piece

H H4 Splitter 1 Piece

I User Manual 1 Copy

Table 4.2 Quantity of Assembly Parts and Instructions

- 15 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

4.3 The Determination of the Installation Method and Position


4.3.1 Mounting Method

Figure 4.1 Mounting Method

(1) The equipment employs natural convection cooling, and it can be installed
indoor or outdoor.
(2) Please install the equipment under the guidance of Figure4.1. Vertical
installation on floor level is recommended. Mount vertically or tilted backwards by
max. 15°. Never install the inverter tilted forwards, sideways, horizontally or
upside down.
(3) Install the inverter at eye level for convenience when checking the LCD display
and possible maintenance activities.
(4) When mounting the inverter, please consider the solidly of wall for inverter,
including accessories. Please ensure the Rear Panel tightly.
Before installation, make sure that the wall has enough strength to hold the screws
and bear the weight of the equipment, Please make sure the equipment is installed
properly.

- 16 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

4.3.2 Installation Position


Do not expose the inverter to direct solar irradiation as this could cause power
derating due to overheating. The ambient temperature should be between -25°C ~
+60°C(-13° F ~ 140° F)(This temperature range is not equivalent to the
temperature range required by the battery pack)to ensure optimum operation.
Choose locations with sufficient air exchange. Ensure additional ventilation, when
necessary.
To make sure the installation spot is suitably ventilated, if multiple SAJ grid-tie
hybrid solar inverters are installed same area, the following safety clearance in
Figure 4.2 shall be followed for proper ventilation conditions.

30CM

30CM 50CM 50CM


30CM

Figure 4.2 Minimum Clearance

- 17 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

4.4 Mounting Procedure


4.4.1 Mark the Positions of the Drill Holes of the Rear Panel
The mounting position should be marked as shown in Figure 4.3.

Figure 4.3 Dimensions of rear panel of Sunfree inverter

4.4.2 Drill Holes and Place the Expansion Tubes


According to the guides, drill 4 holes in the wall (in conformity with position marked
in Figure 4.4, and then place expansion tubes in the holes using a rubber mallet.

260
Ø8

100

Figure 4.4 Drill holes dimensions of Sunfree inverter

- 18 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

4.4.3 Mount the Screws and the Rear Panel


The panels should be mounted in the mounting position by screws as shown in
Figure 4.5.

Figure 4.5 Mount the Rear Panel of Sunfree inverter

4.4.4 Mount the Inverter

Carefully mount the inverter to the rear panel as shown in Figure 4.6, Make sure
that the rear part of the equipment is closely mounted to the rear panel.

Figure 4.6 Mount Sunfree inverter

- 19 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 5 Electrical Connection

5.1 Safety Instruction for Hot-line Job


Electrical connection must only be operated on by professional technicians. Please
keep in mind that the inverter is a bi-power supply equipment. Before connection,
necessary protective equipment must be employed by technicians including
insulating gloves, insulating shoes and safety helmet.

DANGER
· Dangerous to life due to potential fire or electricity shock.
· When power-on, the equipment should in conformity with national rules and regulations.
· The direct connection between the inverter and high voltage power systems must be
operated by qualified technicians in accordance with local and national power grid standards
and regulations.

WARNING

· When the photovoltaic array is exposed to light, it supplies a DC voltage to the inverter.

NOTICE
·Electrical connection should in conformity with proper stipulations, such as stipulations for
cross-sectional area of conductors, fuse and ground protection.
·The overvoltage category on DC input port is II,on AC output port is III.

- 20 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.2 Specifications for Electrical Interface

Figure 5.1 Electrical Interface of Sunfree inverter

Code Name
A Battery Plug Terminal
B RS485 & DRM Port
C RS232 /Wi-Fi Port
D DC Input
E DC Switch
F AC Output
G Backup Plug Terminal
Table 5.1 Specifications for Interface

- 21 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.3 AC input wire Connection


Caution:For safety operation and regulation compliance, it`s requested to install a breaker
(600V/60A) between grid and inverter.
Cable Cross-sectional area(mm²)
External diameter(mm)
Range Recommend
4.0-6.0 4.0 4.2~5.3

Table 5.2 Recommended Specifications of AC Cables

5.3.1 Open the waterproof cover, feed the AC cable through the AC
waterproof hole.

Figure 5.2 Thread the cables

- 22 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.3.2 Connect the cables according to connection marks of L, N and PE.

Figure 5.3 Connect the Cables

5.3.3 Secure all parts of the AC connector tightly.

Figure 5.4 Screw the Connector

5.4 Backup Output Connection


Cable Cross-sectional area(mm²)
External diameter(mm)
Range Recommend
4.0-6.0 4.0 4.2~5.3

Table 5.3 Recommended Specifications of AC output Cables

- 23 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.4.1 Feed the AC cable through the AC waterproof hole.

Figure 5.5 Feed cable

5.4.2 Connect the cables according to connection marks of L, N and PE.

Figure 5.6 Connect cable

5.4.3 Screw all parts of the AC connector.

Figure 5.7 Screw the connector

- 24 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.4.4 Connect the AC connector to the equipment securely, ensuring the pins
are connected directly. Then the connection of AC cable is completed.

Figure5.8 Connect the Inverter

5.5 PV Connection
Cross-sectional Area of Cables(mm²) Outside Diameter of the
Scope Recommended Value Cables(mm)
4.0-6.0 4.0 4.2~5.3
Table5.3 Recommended Specifications of DC Cables

DC connector is made up of the positive connector and the cathode connector

1. Insulated Enclosure 2. Lock Screw 3. Positive Connector


Figure 5.9 Positive Connector

1. Insulated Enclosure 2. Lock Screw 3. Cathode Connector


Figure 5.10 Cathode Connector

- 25 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

NOTICE
· Please place the connector separately after unpacking in order to avoid confusion for
connection of cables.
· Please connect the positive connector to the positive side of the solar panels, and connect the
cathode connector to the cathode side of the solar side. Be sure to connect them in right position.

Connecting Procedures:
(1)Tighten the lock screws on positive and cathode connector.

(2)Use specified strip tool to strip the insulated enclosure of the positive and
cathode cables with appropriate length.

1.Positive Cable 2. Cathode Cable


Figure 5.11 Connecting Cables

(3)Feed the positive and cathode cables into corresponding lock screws.

(4)Put the metal positive and cathode terminals into positive cable and cathode
cable whose insulated enclosure has been stripped, and crimp them tightly with a
wire crimper. Make sure that the withdrawal force of the pressed cable is bigger than
400N.

(5)Plug the pressed positive and cathode cables into relevant insulated enclosure,

- 26 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

a“click” should be heard or felt when the contact cable assembly is seated correctly.

(6)Fasten the lock screws on positive and negative connectors into corresponding
insulated enclosure and make them tight.
(7)Connect the positive and cathode connectors into positive and negative DC
input terminals of the inverter, a “click” should be heard or felt when the contact
cable assembly is seated correctly.

1. Connection Port

Figure 5.12 Connect the Inverter

NOTICE
· Before insert the connector into DC input terminal of the inverter, please make sure that the DC
switch of the inverter is OFF.

- 27 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.6 Battery connection


Caution:For safety operation and regulation compliance, it`s requested to install a breaker
(600V/150A) between battery and inverter.
Cross-sectional Area of Cables(mm²) Outside Diameter of the
Scope Recommended Value Cables(mm)
22-25 22 25~30
Table5.4 Recommended Specifications of DC Cables

5.6.1 Open the waterproof cover, then feed the battery cable through the AC
waterproof hole.

Figure5.13 Open the Waterproof Cover

5.6.2 Fixing the battery cable on the battery’s copper terminal by positive and
negative in order.

Figure 5.14 Connect the Battery Cable

- 28 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.7 Communication Connection


5.7.1 Serial Port Definition
Sunfree Series Hybrid Inverter has a RS232 communication port Integrated .

Figure 5.15 9-Pin serial port

Pin Number Description Effect

1 DCD(Data Carrier Detect) Data carrier detection


2 RxD(Received Data) Serial data input
3 TxD(Transmitted Ready) Serial data output
4 DTR(Data Terminal) Data terminal ready
5 GND(Signal Ground) Ground line
6 DSR(Data Send Ready) Data Send Ready
7 RTS (Request To Send) Request To Send
8 CTS (Clear To Send) Clearly Send
9 RI (Ring Indicator) Ringtone
Table 5.5 9-Pin serial port introduction

(1) RS232 connect with Wi-Fi module, please reference Wi-Fi user manual.
(2) RS232 connect with Ethernet module, please reference Ethernet user manual.

(3) RS232 connect with GPRS module, please reference GPRS user manual.

- 29 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

5.7.2 RJ45 Pin Port Definition.


Left Right
1 EXT SYNC 1 DRM 1/5
2 GND 2 DRM 2/6
3 NONE 3 DRM 3/7
4 CANH 4 DRM 4/8
5 CANL 5 RefGen
6 GND 6 Com/DRM 0
7 RS485-A+ 7 V+
8 RS485-B- 8 V-

Table 5.6 RJ45 pin port definition

5.7.3 Open the waterproof cover, pass the prepared communication cable
through each component, insert corresponding communication port, then
tighten the screws.

Figure 5.16 Connection of communication cable

- 30 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 6 Debugging Instructions

6.1 Introduction of Human-computer Interface

A POWER

B FAULT POWER

C
FAULT

RUN RUN

ESC ENT

ESC ENT

D E F G

Figure 6.1 Human-computer Interface

Object Description

Yellow LED light = Power - After the equipment is powered on, the yellow LED
A
light will go on

Red LED light = Error - The red LED light will go on when an Error occurs, it
B
will go off automatically after Errors are resolved

Green LED light = operation - The green LED light will flash when the equipment
C
is in normal operation.

F Down/Right Click

E Up/Left Click

Table 6.1 Instructions of the Interface

- 31 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

The inverter provides two buttons for inquiry of operational information and
parameters, these two buttons can be used repeatedly.

Name of the button Operation Description


Press time shorter
Return to parent menu or cancel the demand
than 2 second
ESC
Press time longer
Cut off output to load
than 2 second
Move the cursor to the right or enter submenu or
Press time shorter
edit status
than 2 second
ENT
Press time longer
Turn on output load
than 2 second
Table 6.2 Instructions for buttons

6.2 First Run Setup


6.2.1 System time setting
When the inverter begins to run for the first time, please configure the time of
system, and the inverter LCD will display as below:

Figure 6.2.1-1 System time setting

When the cursor selected the edit box, press ENT to edit status, set the target value
by pressing or . If Press time longer than 2 seconds, the value will decrease or
increase quickly. With the edit status, switching different value setting by pressing
ENT. Drop out of edit status by pressing ESC. With the edit status, switch different
edit box or button by pressing or .

- 32 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Operating and interface description:

With user selected the edit box of Date, edit the system date by pressing ENT, and
switch to the setting of M/D/Y, set the target value by pressing or , drop out of
edit status by pressing ESC. Same operation as edit system time.

Note: With the cursor selected the edit box, appear dialog box to request setting
system time while press ESC. This dialog box prompt user not across the debugging
at first time running. LCD will display as below:

Figure 6.2.1-2 System time setting (Prompt by ESC)

6.2.2 Battery data setting


While inverter using at first time, after set system time, then set the battery data,
LCD will display as below:

Figure 6.2.2-1 Battery setting

- 33 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Operating and interface description:

With user selected the edit box of Battery Type, edit the battery species by pressing
ENT, switch the selected object by pressing or , drop out of edit status by
pressing ESC; Selected the edit box of Battery Capacity, set the battery capacity,
selected the edit box of Discharge, set the Battery discharge depth.
Note: With the cursor selected the edit box, appear dialog box to request setting
system time while press ESC. This dialog box prompt user not across set battery
data.

Figure 6.2.2-2 Battery setting(Prompt by ESC)

6.2.3 Set The Country


When the inverter begins to run for the first time, please configure the
country of usage, and the inverter LCD will display as below:

Figure 6.2.3-1 Country setting

- 34 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Operating and interface description:

Users can press "▼ " or"▲ " to select the correct country and press "ENT" button to
confirm the selection.
While a country contain several compliances, they will occur the next to this
country, as shown below:

Figure 6.2.3-2 Country setting(Country with several compliances)

LCD will show countries to selected, users could press or to move cursor
“>” , select correct country and press “ENT”.
If users can not fond out the corrsponding country,please stop the setting and
contact the after sales for confirmatior.

Note: With the cursor selected the edit box, appear dialog box to request setting
system time while press ESC. This dialog box prompt user set country grid
compliance, not across this step.

Figure 6.2.3-3 Grid compliance setting(Prompt by ESC)

- 35 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

6.2.4 Inverter System Main Interface


After the country has been set, system will reset and show main interface, as show
below. ( Standby mode ).

Figure 6.2.4-1 Main Interface

If system running normally, main screen will show the power flowing illustration, as
show below.

Figure 6.2.4-2 Power flow illustration(System running normally)

If system running in different states, power flow illustration will switch as states. For
example, when in Off-grid state, cut off the Grid, the dynamic power flow arrow will
disappear. When no PV power, the PV dynamic power flow arrow will disappear.
When no load output, the load output dynamic power flow arrow will disappear.
In system main screen, user could press or to view chart.

- 36 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-3 PV power and daily generation

Figure 6.2.4-4 Power Trading of Grid and daily generation

Figure 6.2.4-5 Load power and daily generation

As above three figures, the power and daily generation, the figure show the PV,
loads or trading of Grid in all day long. E-Today representative the daily power
generation. 

- 37 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-6 Daily generation in this month

In the figure above, show the PV input all days in this month.

Figure 6.2.4-7 Daily sell to Grid in this month.

In the figure above, show the daily output all days in this month.

Figure 6.2.4-8 Daily buy from Grid in this month

In the figure above, show the daily input from Grid all days in this month.

- 38 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-9 Daily load consumption in this month

In the figure above, show the daily output from load all days in this month.

Figure 6.2.4-10 Monthly PV, trading with Grid, load consumption in this year

In the figure above, as show monthly power of PV, Grid(Trading power), and load
output. It also show the accumulate PV, Grid, and load power in this year in the right
of figure.

11.0 kWh
PV
10.0 E-Total
9.9 5.48kWh
8.8 Sell
7.7 E-Total
6.6 4.30kWh
Buy
5.5
E-Total
4.4 3.28kWh
3.3 Load
2.2 E-Total
1.1 4.46kWh
0 2016 2017 2018 2019 2020 2021 Year

Figure 6.2.4-11 Totally PV, Trading power and load consumption

- 39 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

In the figure above, it shows the annual power of PV, Grid(trading power) and load
output in recent 6 years. It also show the finally accumulate power of PV, Grid, and
load power in this year in the right of figure.
With system interface status, user can back to system power flow main screen by
pressing ESC button. If pressing ENT button, main screen will occur the drop-down
menu, as show blow.

Figure 6.2.4-12 Drop-down menu

User could press or to selected the corresponding option

Figure 6.2.4-13 Switch menu option left/right

While the option has been selected, press ENT button to next interface. Figure below
shows the main edit interface that enter the ‘Graph’:

- 40 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-14 Main edit interface

If the menu option has the second menu interface, it will appear by press the ENT
button. The figure below shows the second menu of “Setting”:

Figure 6.2.4-15 The second menu of “Setting”

The figure below shows the second menu of “Run-Info”:

Figure 6.2.4-16 The second menu of “Run-Info”

- 41 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

The figure below shows the interface of “About” by pressing ENT.

Figure 6.2.4-17 The interface of“About”

The main edit interface, press or to select menu icon, as shown below:

Figure 6.2.4-18 Menu icon selected

By the main edit interface, press ESC button to back menu option selected status;
press ENT button to enter the subinterface of main menu icon. The figure below
shows the PV parameter while selected the PV panels:

Figure 6.2.4-19 PV parameter

- 42 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

In the main edit interface, by selected inverter icon, press ENT button to show the
parameter of inverter’s running information:

Figure 6.2.4-20 Information of inverter’s running

In main edit interface, by selected Grid icon, press ENT button to show the
parameter of inverter’s output information:

Figure 6.2.4-21 Information of inverter’s output

In main edit interface, by selected battery icon, press ENT button to show the
parameter of inverter’s battery information. (The figure below shows the Li-ion
battery )

- 43 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-22 Information of Li-ion battery

Figure 6.2.4-23 Information of Lead-acid battery

In main edit interface, by selected load icon, press ENT button to show the
parameter of load’s output information.

Figure 6.2.4-24 Information of load’s output

- 44 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Selected the “Run-Info” in menu, press ENT to the second menu, then select “Error
Records”, press ENT to enter error and warning, as shown below:

Figure 6.2.4-25 Error and warning

Selected the “Setting” in menu, press ENT to the second menu, then select “Mode
Setting”, press ENT to enter the interface of choosing running mode, as shown
below:

Figure 6.2.4-26 Parameter setting of Smart Home Mode

With this mode, press or to switch Sell Energy Setup, AC Charge Setup, AC
DisCharge Setup.
To set up “Sell Energy Setup”, press or to switch Enable or Disable, as shown
below.

- 45 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-27 Sell Energy Setup

To set up “AC Charge Setup” and “AC DisCharge Setup”, if not to add parameter,
the default will show no parameter, as shown below:

Figure 6.2.4-28 Add AC Charge/Discharge Setup

To set up AC Charge/Discharge parameter, in the interface of add “AC


Charge/Discharge Setup”, press or to select different edit box, press ENT to
enter edit status, press ESC to out edit status. With the alone parameter has selected
status, press ESC button to select current parameter, then edit these information by
or , as shown below.

Figure 6.2.4-29 Edit the AC Charge/Discharge Setup parameter

- 46 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

In the alone parameter selected records, select “Workday” to choose working date,
press ENT to select or cancel, press ESC to return to previous interface, as shown
below:

Figure 6.2.4-30 Select WorkDay’s interface

Seting prevent revense folw, as shown below:


Graph Setting Run-Info About

Enable

Disable
Meter Addr: 1
OK

2016-09-16 18:26:31

Figure 6.2.4-31 Prevent revense folw Setup

Select “Setting” in menu, press ENT button to pull out the second menu, select
“Battery Setting” and press ENT button to enter battery parameter setup interface, as
shown below:

- 47 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-32 Interface of Battery parameter setup

Select “Setting” in menu, press ENT button to pull out the second menu, select
“System Setting” and press ENT button to enter system parameter setup interface, as
shown below:

Figure 6.2.4-33 Interface of system parameter setup

With the interface of system parameter setup, press or to select corresponding


parameter, For example the option of “Language Setting”.

Figure 6.2.4-34 System language setup

- 48 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

E.g select option of“Date&Time Setting”。

Figure 6.2.4-35 System date and time setup

E.g select option of “Display Setting”

Figure 6.2.4-36 Parameter of display setup

E.g select option of “Factory Setting”

Figure 6.2.4-37 Factory setting

- 49 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

E.g select option of “Clear Energy”

Figure 6.2.4-38 Clear Energy

E.g select option of “Clear Error Records”

Figure 6.2.4-39 Clear Error Records

E.g select option of “Grid Compliance”

Figure 6.2.4-40 Grid Compliance setup

- 50 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

E.g select option of “Communication Set”

Figure 6.2.4-41 Communication Set

E.g select option of “Change Password”

Figure 6.2.4-42 Change Password

To change system password, enter the interface of changing system password, input
a new password, then can be changing the general admin’s password. System super
admin’s password is “658513”, can not be changed.
E.g select option of“Beep&Led Setting”.

- 51 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-43 Setup of Beep and Led

While occur error or warning in system, LCD will appear prompt box to show the
information about the error or warning. As shown below:

Figure 6.2.4-44 Interface of warning

While occur error or warning, LCD will display the prompt box above, if system has
error alarm, the prompt box will appear and system beep will work, the status light
will become red all the time.

The prompt interface of input password, as shown below:

- 52 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Figure 6.2.4-45 The prompt interface of input password

In the interface of password input, press or to edit the password. ENT button for
entering edit status, press or again to input the password. ESC button for out of
edit status, select “OK” to enter next interface.
ENT button pressing time longer than 2s, LCD will appear prompt box of input load,
press ENT to confirm, inverter begin to enter loading status. As shown below:

Figure 6.2.4-46 Prompt of input load

Figure 6.2.4-47 Process of input load

- 53 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

ESC button pressing time longer than 2s, LCD will appear prompt box of cutoff
load, press ENT to confirm, inverter begin to out of load. As shown below:

Figure 6.2.4-48 Process of cutoff load

- 54 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

6.3 Monitoring Operation and Battery manage system


The equipment is equipped with an RS232 interface, RS232 can transfer to Wi-Fi
module, Ethernet module and GPRS module, which can be used in the monitoring of
the operation status.

By connecting the internet through a Wi-Fi module and uploading the data of the
inverter to server, users can monitor the operational information of the inverter by
web version web portal or mobile APP (please download the mobile APP from
SAJ’s official website) remotely.

By connecting the internet through a Ethernet module and uploading the data of the
inverter to server, users can monitor the operational information of the inverter by
web version web portal or mobile APP (please download the mobile APP from
SAJ’s official website) remotely.
By connecting the internet through a GPRS module and uploading the data of the
inverter to server, users can monitor the operational information of the inverter by
web version web portal or mobile APP (please download the mobile APP from
SAJ’s official website) remotely.
The equipment is equipped with an RS485 interface, RS485 can be connected to
battery manage system, while battery parameter of inverter match with the
communication protocol of battery manage system, inverter would obtain the data as
the protocol from battery manage system.

- 55 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 7 Fault Code and Troubleshooting

Code Fault Information Explanation Fault type


01 Relay Err Relay Error Error
02 GFCI Device Err GFCI Devices Error Error
03 Fan Err Fan Error Error
04 Eeprom Err Storer Error Error
05 Lost Com.M<->S Err Interior Communication Error
06 ISO Err Insulation Error Error
07 Temp.High Err High Temperature Error
08 Temp.Low Err Low Temperature Error
09 Bus Volt.High Err Bus Voltage High Error
10 Bus Volt.Low Err Bus Voltage Low Error
11 GFCI Err GFCI Error Error
12 DCI Err DCI Devices Error Error
13 HWBus Volt.High Err Bus Voltage High Of Hardware Error
14 HWPV1 Curr.High Err PV1 Current High of Hardware Error
15 HWPV2 Curr.High Err PV2 Current High of Hardware Error
16 HWInv Curr.High Err Inverter Current High of Hardware Error
17 Inv Short Err Inverter short circuit error Error
18 Over Load Err Output overload error Error
19 PV1 Volt.High Err PV1 Voltage High Error
20 PV2 Volt.High Err PV2 Voltage High Error
21 PV1 Curr.High Err PV1 Current High Error
22 PV2 Curr.High Err PV2 Current High Error
23 SPS Err Auxiliary power error Error
24 EPO Err Emergency stop Error
25 Grid Volt.High Warn Voltage of Grid High Alarm
26 Grid Volt.Low Warn Voltage of Grid Low Alarm
27 Grid Freq.High Warn Frequency of Grid High Alarm
28 Grid Freq.Low Warn Frequency of Grid Low Alarm

- 56 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

29 Grid Loss Warn Grid Lost Alarm


30 Grid Volt.10min Warn Average voltage of 10 minutes Alarm
32 PV Low Warn PV Voltage Low Alarm
34 Bat Volt.High Warn Battery voltage high Alarm
36 Bus SoftTimeOut Err Bus soft start time out Error
37 Lost Com.M<->S Err Lost interior communication Error
38 GND Loss Err Ground error Error
39 Bus Volt.High Err Bus Voltage High Error
40 Discharge Err Discharge failure Error
Data Consistency of Bus Voltage Error
41 Bus Volt.Consis Err
Error
Data Consistency of Grid Voltage Error
42 Grid Volt.Consis Err
Error
Data Consistency of Grid Error
43 Grid Freq.Consis Err
Frequency Error
44 GFCI Consis Err Data Consistency of GFCI Error Error
45 DCI Consis Err Data Consistency of DCI Error
46 DVI Consis Err Data Consistency of DVI Error
47 CHG1 Curr Err Charging bridge 1 current error Error
48 CHG2 Curr Err Charging bridge 2 current error Error
57 Grid Volt.High Warn Voltage of Grid High Alarm
58 Grid Volt.Low Warn Voltage of Grid Low Alarm
59 Grid Freq.High Warn Frequency of Grid High Alarm
60 Grid Freq.Low Warn Frequency of Grid Low Alarm
61 Grid Loss Warn Grid Loss Alarm
62 Battery Open Warn Battery open Alarm
63 Battery High Warn Voltage of Battery High Alarm
64 Battery Low Warn Voltage of Battery Low Alarm
Lost communication between Error
65 Lost Com.H<->M Err
interface with main control panel
66 HMI Eeprom Err Interface storer error Error
67 HMI RTC Err Interface RTC error Error
68 BMS Device Err Battery management system error Error
69 BMS Cell Volt.H Warn Voltage of Battery management Alarm

- 57 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

system cell High


Voltage of battery management Alarm
70 BMS Cell Volt.L Warn
system cell Low
Battery management system charge Alarm
71 BMS CHG Curr.H Warn
current high
Voltage of Battery management Alarm
72 BMS Voltage Low Warn
system Low
73 BMS Lost.Conn Warn Battery management system lost Alarm

Table 7.1 Warning & Error Code

Fault Information Troubleshooting


If this error occurs frequently, please contact your distributor or
Relay Error
phone SAJ.
If this error occurs frequently, please contact your distributor or
Storer Error
phone SAJ.
Check whether the radiator is blocked, whether the inverter is in
Temperature Error too high or too low temperature, if the above mentioned are in
normal, please contact your distributor or phone SAJ.
If this event occurs all the time, please contact your distributor or
Lost Communication
phone SAJ.
If this error occurs frequently, please contact your distributor or
GFCI Device Error
phone SAJ.
If this error occurs frequently, please contact your distributor or
DCI Device Error
phone SAJ.
If this error occurs frequently, please contact your distributor or
Cur Sensor Error
phone SAJ.
Check the connection between the inverter and the grid.
Check the settings of the on-grid standards of the inverter.
If the volt of the grid is higher than the volt regulated by local
AC Voltage Error grid. Please inquire the local grid workers whether they can adjust
the volt at the feed point or change the value of the regulated volt.
If the voltage of the grid is in regulated range as allowed and LCD
still in this error, please contact your distributor or phone SAJ.
Check the set of country and check the frequency of the local grid,
Frequency Error If the above mentioned are in normal, please contact your
distributor or phone SAJ.
No Grid Error Check the connection status between the AC side of the inverter

- 58 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

and the grid, if the above mentioned are in normal, please contact
your distributor or phone SAJ.
Check the insulation resistance of the positive side and cathode
side of the solar panel; check whether the inverter is in wet
GFCI Error environment; check the grounding of the inverter. If the above
mentioned are in normal, please contact your distributor or phone
SAJ.
If this error exists always, please contact your distributor or phone
DCI Error
SAJ.
Check the insulation resistance of the positive side and cathode
side of the solar panel; check whether the inverter is in wet
environment; check whether the grounding of the inverter is loose
ISO Error
or not. If the above mentioned are in normal, please contact your
distributor or phone SAJ.
Check the connection status between the inverter and the grid and
test whether the volt of the grid is stable or not, if the above
Current High
mentioned are in normal, please contact your distributor or phone
SAJ.
Check the settings of the solar panel. SAJ designer can help you.
Bus Voltage High If the above mentioned are in normal, please contact your
distributor or phone SAJ.
If this error exists always, please contact your distributor or phone
PV Current High
SAJ.
Check the settings of the solar panel. SAJ designer can help you.
PV Voltage Fault If the above mentioned are in normal, please contact your
distributor or phone SAJ.
Battery management Check the parameter of battery or restart the batter. If this event
system Fault occurs all the time, please contact your distributor or phone SAJ.
Table 7.2 Troubleshooting

- 59 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 8 Recycling and Disposal

This device should not be disposed as residential waste. An Inverter that has reached
the end of its life and is not required is to be returned to your dealer or you must find
an approved collection and recycling facility in your area.

- 60 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 9 Guarantee Service

Please refer to the warranty card.

- 61 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Chapter 10 Contact SAJ

Guangzhou Sanjing Electric Co., Ltd.


SAJ Innovation Park, No.9, Lizhishan Road, Guangzhou Science City, Guangdong,
P.R.China.

Postcode: 510663

Web: http: //www.saj-electric.com

Technical Support & Service


Tel: +86 20 6660 0082

Fax: +86 20 6660 8589


E-mail: service@saj-electric.com

International Sales
Tel: 86-20-66608618/66608619/66600082/66600086
Fax: 020-66608589

E-mail: info@saj-electric.com

Domestic Sales

Tel: 020-66600058/66600082

Fax: 020-66608589

- 62 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

SAJ Warranty Policy

Standard Warranty Period


Guangzhou Sanjing Electric, Co., Ltd (“SAJ”) grants a standard warranty period of
60 months (5 years) for the Sununo-TL Series inverters & Suntrio-TL Series
inverters and Sununo Plus Series inverters & Suntrio Plus Series inverters &
Sunfree Series inverters, starting from the date of shipment from SAJ factory or 60
months (5 years) starting from the date of purchased invoice marked (whichever is
longer).

Extension of Warranty
The purchaser of SAJ inverters (Sununo-TL Series inverters & Suntrio-TL Series
inverters and Sununo Plus Series inverters & Suntrio Plus Series inverters &
Sunfree Series inverters) should extend the warranty period in 18 months from the
date of settlement or 30 months from the date of shipment from SAJ by providing
the serial number of the unit and purchased receipt (whichever is shorter). You can
purchase the warranty extension for 10 years, 15 years, 20 years or 25 years but do
not apply the extension beyond the specified date, or else your application will be
unacceptable. Please refer to the Warranty Extension Order Form for more details.
Once the purchase of the warranty extension goes into effect, SAJ will send the
warranty extension certificate to the customer for confirming the extended warranty
period.

Warranty Conditions
If your inverter gets fault and requires troubleshooting, please contact your
distributor or dealer directly. Alternatively, feedback briefly to SAJ service hotline
for logging and send your warranty card to our service department by fax/email to
process the warranty claim.

- 63 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

During the Warranty Period, SAJ covers all costs for replacing any product or parts
of the product proved to be defective in design or manufacture. To claim the
warranty under the warranty policy of SAJ, you need to supply us with the following
information and documentation regarding the faulty inverter:
1.Product Model No.(e.g. Sununo-TL3KA) and serial number
(e.g.13020G1141CH00014).
2. Copy of the invoice and warranty certificate of the inverter.

3. Copy of the installation report and installation date.

4.Error message on LCD screen ( if available ) or any information which would be


helpful to determine the defect
5.Detailed information about the entire system (modules, circuits, etc.).

6.Documentation of previous claims/exchanges (if applicable).

After receiving above information, SAJ will decide how to proceed the service

1.Repaired by SAJ factory, or


2.Repaired on-site by SAJ Service Center, or
3. Offer a replacement device of equivalent value according to model and age.

In the case of an exchange, the remaining portion of the original warranty period will
be transferred to the replacement device. You will not receive a new certificate, as
your entitlement is documented at SAJ.

If the inverter needs to be replaced following assessment, SAJ will send a


replacement unit immediately. The defective inverter should be sent back to the
closest SAJ Service Center by packing in its original package if possible.

- 64 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Service after warranty expiration

If the inverters for maintenance are out of warranty, SAJ charges an on-site service
fee, parts, labor cost and logistic fee to end-user. Detailed standard refers to the
listed table.

Item Return Factury Maintenance On-site Maintenance

Without parts Labor + Logistic fee Labor + On-site attendance


replacement (to & from SAJ) fee

Labor + Parts + logistic fee Labor + On-site attendance


With parts replacement
(to & from SAJ) fee + Parts

■ On-site attendance fee: Cost of travel and time for the technician in attending
on-site.
■ Parts: Cost of replacement parts (including any shipping/admin fee that may
apply).
■ Labor: Labor time fee charged for the technician, who is repairing, maintaining,
installing (hardware or software) and debugging the faulty product.

■ Logistic fee: Cost of delivery, tariff and other derived expense when defective
products are sent from user to SAJ or/and repaired products are sent from SAJ to
user.

Exclusion of Liability

Any defect caused by the following circumstances will not be covered by the
manufacturer’s warranty (the Dealers or Distributors are responsible and authorized
by SAJ for the following investigation):

◆ “Warranty Card” not being sent back to Distributor/Dealer or SAJ;


◆ Product modified, parts replaced or attempt to maintain;

◆ Changes, or attempted repairs and erasing of series number or seals by non SAJ

- 65 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

technician;

◆ Incorrect installation or commissioning;


◆ Failure to comply with the safety regulations (VDE standards, etc.);

◆ The inverter has been improperly stored and damaged while being stored by the
Dealer or the end user;

◆ Transport damage (including scratch caused by movement inside


packaging during shipping).A Claim should be made directly to shipping
company/insurance Company as soon as the container/packaging is unloaded and
such damage is identified;
◆ Failure to follow any / all of the user manual, the installation guide and the
maintenance regulations;

◆ Improper use or misuse of the inverter;


◆ Insufficient ventilation of the inverter;
◆ Influence of foreign objects and force majeure (lightning, grid overvoltage,
severe weather, fire, etc.)

◆ For further information on SAJ warranty regulation and reliability, please visit
our website: www.saj-solar.com.

- 66 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Warranty Card

The installer should fill in the second form while installing the inverter. For
warranty claim, please complete the below forms and send this page to SAJ attached
with the Customer’s invoice.
For Customer to fill in

Name:

City: Country: Zip:

Tel: Fax: E-mail:

Information on Device
Device type: Serial No.(S/N):

Invoice No: Commissioning date::

Fault time:

Error message (Display reading):

Brief fault description & photo:

Signature: Date:

- 67 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

For Installer to fill in


Modules Used:

Modules Per String: No. of String:

Installation Company: Contractor License Number:

Company:

City: Country: Zip:

Tel: Fax: E-mail:

Signature: Date:

- 68 -

Downloaded from www.Manualslib.com manuals search engine


Sunfree Series

Guangzhou Sanjing Electric CO., LTD.

ADD: SAJ Innovation Park, No.9, Lizhishan Road, Science City,


Guangzhou High-tech Zone, Guangdong, P.R.China
Zip: 510663 Tel: +86 20 6660 0082 Fax: 020-6660 8589
Web: http: //www.saj-electric.com

Edition No: V1.0 - 69 -

Downloaded from www.Manualslib.com manuals search engine

Вам также может понравиться