Вы находитесь на странице: 1из 42

PT.

DIACHEMS RESINS INDONESIA


5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING
CALCULATION REPORT

PROJECT : DRI 5th TRAIN EXPANSION


PROJECT : PRODUCTION BUILDING
OWNER : PT. DIACHEMS RESINS
INDONESIA
LOCATION : CIREBON - INDONESIA
DOC. NO. :

0 Issued For Approval 28-05-2019 SD Andi Wijaya,ST

REV DESCRIPTION DATE PREPARE CHKD APVD


5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

LIST OF CONTENT

1 PURPOSE 1
1.1 SCOPE 1
1.2 LANGUAGE 1
1.3 UNITS OF MEASUREMENT 1
2 INPUT DATA 1
2.1 MATERIAL PROPERTIES AND STRENGHTS 1
2.1.1 Structural Steel 1
2.2 DESIGN CONDITION 2
2.2.1 Local Condition 2
2.2.2 Design Condition 2
3 REFERENCE AND STANDARDS 4
3.1 DESIGN 4
3.2 MATERIAL CODES AND STANDARDS 4
4 CALCULATION 5
4.1 STRUCTURAL DESIGN CONCEPT 5
4.1.1 General 5
4.1.2 Outline of PRODUCTION BUILDING 5
4.2 STRUCTURAL MODELING CONCEPT 6
4.2.1 Modeling 9
4.2.2 Three-Dimensional View 9
4.2.3 Frame Numbers 10
4.3 METHOD OF ANALYSIS 8
4.4 ANALYSIS SOFTWARE 8

4.5 CONCEPT OF STEEL ORDINARY MOMENT FRAME DESIGN 8


4.6 ALLOWABLE DEFLECTION 9
4.7 LOADS AND LOAD COMBINATION 9
4.7.1 Dead Loads (DL) 9
4.7.2 Super Imposed Dead Load (SDL) 10
4.7.3 Live Loads (L) 10
4.7.4 S e i s m i c Load (W) 11
4.7.6 Load Combination 13

4.8 STRUCTURAL DESIIGN 14

i
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.8.1 General 14
4.8.2 Check of Member Stress Ratio 14
4.8.3 Check of Displacement 24

4.9 CALCULATION CONNECTION DETAILS 36


4.9.1 Rafter Connection IWF 250x125x6x9 36
4.9.2 Fix Connection IWF 150x150x7x10 41
4.9.3 Pin Conection IWF 150x150x5 46
4.9.4 Baseplate Pin IWF 200x200x8x12 47

LIST OF TABLE

Table 1 S t r e s s r a t i o 14
Table 2 Global displacement 24

LIST OF FIGURE

Figure 2-1 The mapped MCER 2


Figure 2-2 The mapped MCER acceleration on short period Ss 3
Figure 2-3 The mapped MCER acceleration on 1 second period S1 3
Figure 4-1 Project out lined 5
Figure 4-2 Production building 3d View 6
Figure 4-3 Floor beam plan Fl +5.500 7
Figure 4-4 Floor beam plan Fl +10.000 7
Figure 4-5 3d view plan Fl +10.000 ~ +12.500 8
Figure 4-6 Applied equipment load on structure (SDL 10
Figure 4-7 Applied floor life load on structure (SLL) 10
Figure 4-8 Respons spectra diagram 11
Figure 4-9 Applied seismic load T.m 13
Figure 4-10 Plot of Global displacement diagram 24

ii
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

1. PURPOSE

1.1. SCOPE
This document covers as Calculation Sheet of P r o d u c t i o n b u i l d i n g o f 5 t h t r a i n e x p a n s i o n
p r o j e c t o f P T . PT. DIACHEMS RESINS INDONESIA

1.2. LANGUAGE
All drawings, calculations and documents shall be written in English.

1.3. UNIT OF MEASUREMENT


Units of Measurement in the Design shall be SI system.

2. INPUT DATA

2.1 MATERIAL PROPERTIES AND STRENGHTS

2.1.1 Structural Steel

A. Structural Steel : JIS G3101 SS400, JIS G3106 SM400/SM490 or ASTM

A36, or equivalent

B Bolts

- High Strength Bolts : JIS B1186 F10T or ASTM A325, or equivalent

- Common Bolts : JIS B1180 or ASTM A307 or equivalent

- Anchor Bolts : JIS G3101 SS400 or ASTM A325 or equivalent

C. Welding Electrodes : AWS A5.1 / D1.1 or JIS Z3211, or equivalent

1
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

2.2 DESIGN CONDITION

2.2.1 Local Condition

1. Site Location
The site is located at BALARAJA - INDONESIA

2.2.2 Design Condition

1. Design Ground Elevation


The Ground level at New Plant Area shall be, EL = +0.000
2. Seismic Condition
The Site shall be assigned as Seismic Design Category E. The Structure shall be classified as Risk Category
III having Importance factor of I e = 1.25. The Site Class shall be Class D (Medium Soil) having Site Coefficient F a
= 1.216 and Site Coefficient Fv = 1.761 The mapped MCER spectral response acceleration at short period shall be

SS=0.730g and mapped MCER spectral response acceleration at 1-second period shall be S1= 0.319g from
Figure 9 and Figure 10 of SNI 1726-2012respectively.

Fig 2.1 The mapped MCER

2
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 2.2 The mapped MCER acceleration on short period Ss

Fig 2.3 The mapped MCER acceleration on 1 second period S1

3
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

3. REFERENCE AND STANDARDS

In principle, the following Codes and Standards shall be applied.

3.1 DESIGN CODES


1) AISC - American Institute of Steel Construction
2) AW S - American Welding Society
3) ACI - American Concrete Institute
4) ASCE - American Society of Civil Engineering
5) IBC - International Building code
6) SNI - Standard National Indonesia

3.2 MATERIAL CODES AND STANDARDS


1) ASTM - American Society for Testing and Materials
2) ANSI - American National Standards Institute
3) JIS - Japanese Industrial Standard
4) SNI - Standard National Indonesia

4
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4. CALCULATION

4.1 STRUCTURAL DESIGN CONCEPT

4.1.1 General
The structural of Production Building consist of Steel Frame for the superstructure.The Longitudinal and Transverse
Frames are Ordinary Moment Framing (OMF) System.

4.1.2 Outline of production building


The general outline of p r o d u c t i o n b u i l d i n g are shown on the next pages

Fig 4.1 – Project out lined

5
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.2 STRUCTURAL MODELING CONCEPT

4.2.1 Modeling (Three-Dimensional View)

Fig 4.2 – Production building 3d View

4.2.2 Frame element numbers

6
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.3 – Floor beam plan Fl +5.500

Fig 4.4 – Floor beam plan Fl +10.000

7
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.5 – 3d view plan Fl +10.000 ~ +12.500

4.3 METHOD OF ANALYSIS


The Static Analysis of Production building shall conform to the structural model in accordance with
Section 4.2. All frame elements shall be analyzed and designed to satisfy with all the combined stresses
resulting from the Load Combinations. The strength design of structure shall be in accordance with SNI
2847-2013.

4.4 ANALYSIS SOFTWARE


MIDAS Gen 2018 Advanced v14.2.0 software is used for structural analysis.

4.5 CONCEPT OF STEEL ORDINARY MOMENT FRAME DESIGN


The Designs of Structural Member are performed by MIDAS-Gen 2018 software in
accordance with provisions of SNI 1729-2015 using ASD Method. The design forces of structural
members are determined and the most critical load effects are used for the design of each
member. In addition, the provisions of SNI 1729-2015 shall be also be satisfied for OMF (Ordinary
Moment Framing) systems.

8
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.6 ALLOWABLE DEFLECTION


In addition to stress check, deflection check for Rafter, Beams and Girders produced by Dead
Load, Live Load and Equipment Loads shall be limited as follows:
a) Main beam : 1/300 agains beam span
: 1/250 agains cantilever span
b) Support beam for general equipment : 1/300 agains beam span
c) Support beam for equipment : 1/1000 against beam span
d) Sub beam for floor : 1/200 againts beam span
e) Floor , Joist, Purlin : 1/200 againts beam span

4.7 LOADS AND LOAD COMBINATION


The structure analysis and design for strength, stability and serviceability will take account of
relevant and appropriate action effects directly arising from the following loads:

4.7.1 Dead Loads (DL)

Self-weight of dead load will be calculated by software. The unit weights of materials and
construction are:
3
Steel structure : 7850 kg/m

Floor self weight : 300 kg/m2

4.7.2 Super Imposed Dead Load (SDL)


Superimposed dead load that applied to structure model as beam and nodal load :

EP-N o Name WT type of mounting floor opening remarks


3rd Floor
EP-320H 1st Condenser 5,000 kg suooort beam cfJ 900
EP-321H 2nd Condenser 1 500 kg suaaort beam - for future
EP-360K Monomer Tank 25.000 kg suooort beam cfJ 2400 Included Agitator
EP-361 V Catalvst Tank 3,000 kg suaaort beam ¢ 1200 Included Agitator
EP-375V Seel Tank 1.500 k11: suooort beam -
EP-365V A Measurine: Tank 3000 ke: steel counte r -
Sub Total 39,000 kg
2nd Floo r
EP-310K Rea ctor & 38,000 kg support beam ¢2400 Included A11:itator
EP-371P Monomer Pumo 1,000 kg suooort beam -
EP-372P Catalyst Pum p 500 kg support beam -
EP-373V Inhibito r Tank 800 ke: suaaort beam -
Sub Total 40,300 kg

9
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.6 Applied equipment load on structure (SDL)

4.7.3 Super Imposed life Load (SLL)


Superimposed life load that applied to structure model as floor 1000 kg/m2

Fig 4.7 Applied floor life load on structure (SLL)

10
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.7.4 Seismic Load (Eq)


The Site shall be assigned as Seismic Design Category E. The Structure shall be classified as Risk Category
III having Importance factor of I e = 1.25. The Site Class shall be Class D (Medium Soil) having Site Coefficient F a
= 1.216 and Site Coefficient Fv = 1.761 The mapped MCER spectral response acceleration at short period shall be

SS=0.730g and mapped MCER spectral response acceleration at 1-second period shall be S1= 0.319g from
Figure 9 and Figure 10 of SNI 1726-2012respectively.
Seismic load applied on direction as :
 Seismic on + X direction : X = +1 and Y = -0.3
 Seismic on + Y direction : Y = +100 % and X = -0.3
 Seismic on - X direction : X = -1 and Y = -0,3
 Seismic on - Y direction : Y = -1 and X = - 0.3

Fig 4.8 Respons spectra diagram

11
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.8 Input of Seismic Load parameter

12
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.9 Plot of seismic load X+ Fig 4.10 Plot of seismic load Y+

Fig 4.9 Plot of seismic load X- Fig 4.10 Plot of seismic load Y-

13
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.7.5 Loading Combination (sLCB)


Loading combination refer to ASD 1989 standard as following :

No: Name Active Type Description


 sLCB1 Strength/Stress Add D + (L)
2 sLCB2 Strength/Stress Add 0.75(D + (L) + EQX)
3 sLCB3 Strength/Stress Add 0.75(D + (L) + EQY)
4 sLCB4 Strength/Stress Add 0.75(D + (L) + EQX)
5 sLCB5 Strength/Stress Add 0.75(D + (L) + EQY)
6 sLCB6 Strength/Stress Add 0.75(D + (L) - EQX)
7 sLCB7 Strength/Stress Add 0.75(D + (L) - EQY)
8 sLCB8 Strength/Stress Add 0.75(D + (L) - EQX)
9 sLCB9 Strength/Stress Add 0.75(D + (L) - EQY)
10 sLCB10 Strength/Stress Add 0.75(D + EQX)
11 sLCB11 Strength/Stress Add 0.75(D + EQY)
12 sLCB12 Strength/Stress Add 0.75(D + EQX)
13 sLCB13 Strength/Stress Add 0.75(D + EQY)
14 sLCB14 Strength/Stress Add 0.75(D - EQX)
15 sLCB15 Strength/Stress Add 0.75(D - EQY)
16 sLCB16 Strength/Stress Add 0.75(D - EQX)
17 sLCB17 Strength/Stress Add 0.75(D - EQY)
18 sLCB18 Strength/Stress Add 0.75(D + (L) + (1.0)IBC2012(ASCE7-10))
19 sLCB19 Strength/Stress Add 0.75(D + (L) - (1.0)IBC2012(ASCE7-10))
20 sLCB20 Strength/Stress Add 0.75(D + (1.0)IBC2012(ASCE7-10))
21 sLCB21 Strength/Stress Add 0.75(D - (1.0)IBC2012(ASCE7-10))

4.8 STRUCTURAL DESIGN

4.8.1 General

After getting the stresses for each structure element induced by various loads. the most critical stress
resulting from the load combinations shall be used for the design for each member of the structure in
accordance with the relevant codes.

4.8.2 Check of Member Stress Ratio

Structural members stress ratio is shown on figure below to assure the structure able to bearing load
combination. the steel stress ratio should be less than 0.75

14
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Table 1 Element results’ Stress ratio


C S L C
ME SE K
H E Section Section C Len Ly Lz Lb m fa fby fbz fvy fvz
MB CT y
K L B y
C S L C
CO SH K
H E Material Fy C Pa My Mz Cb m Fa FBy FBz Fvy Fvz
M R z
K L B z
O WF600x40 WF600x40 0. 969 207 103 425 105
125 4 0 5 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .36 1 32 .99 4.1
- - -
O 0.74 0.1 0. 130 167 189 101 101
A36 25310.5 5 26.3 12.0 12.1 1 1
K 3 04 85 01 05 83 24 24
37 78 41
O WF600x40 WF600x40 0. 735 322 710 284 103
126 4 0 2 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .71 5.5 2.8 .34 4.9
- -
O 0.62 0.1 18.8 0. 130 167 189 101 101
A36 25310.5 2 19.9 8.34 1 1
K 4 02 107 85 01 05 83 24 24
88 62
O WF600x40 WF600x40 0. 183 152 101 351 761
127 4 0 2 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 2.1 7.1 78 .97 .41
- -
O 0.78 0.0 11.9 0. 123 151 189 101 101
A36 25310.5 2 49.7 8.90 1 1
K 6 75 597 85 12 86 83 24 24
75 6
H H
O 710 322
128 11 1 588x300x1 588x300x1 4 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.9 1.9
2/20 2/20
O 0.42 0.3 28.5 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 5 18 082 55 05 86 24 24
H H
O 499 199
129 11 0 588x300x1 588x300x1 4 1 1 1 1 1 1 0 0 0
K 5.2 0.3
2/20 2/20
O 0.29 0.1 20.0 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 9 97 487 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 244 607
130 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.1 .61
250x125x6 250x125x6
/9 /9
O 0.16 0.0 0.79 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 1 6 158 55 86 86 24 24
O WF600x40 WF600x40 0. 175 238 105 432 770
131 4 0 9 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 9.4 4.4 46 .09 .59
-
O 0.85 0.0 - 13.9 0. 123 151 189 101 101
A36 25310.5 9 12.3 1 1
K 5 76 47.8 058 85 12 86 83 24 24
92
WF WF
250x125x6 250x125x6
O 277 649
132 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 7.2 .24
250x125x6 250x125x6
/9 /9
O 0.18 0.0 0.89 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 3 64 982 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 626 111
137 2 0 /9, H /9, H 9 1.5 1.5 1.5 1.5 1 1 0 0 0
K 5.3 4.2
250x125x6 250x125x6
/9 /9
O 0.37 0.1 - 126 167 151 101 101
A36 25310.5 9 0 0 1 1 1
K 5 1 2.03 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 320 673
138 2 0 /9, H /9, H 9 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.8 .47
250x125x6 250x125x6
/9 /9

15
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 9 0 1.03 0 1 1 1
K 2 67 55 05 86 24 24
83
WF WF
250x125x6 250x125x6
O 288 627
139 2 0 /9, H /9, H 6 1.5 1.5 1.5 1.5 1 1 0 0 0
K 6 .58
250x125x6 250x125x6
/9 /9
-
O 0.17 0.0 126 167 151 101 101
A36 25310.5 6 0 0.93 0 1 1 1
K 3 62 55 05 86 24 24
51
WF WF
250x125x6 250x125x6
O 439 820
140 2 0 /9, H /9, H 10 1.5 1.5 1.5 1.5 1 1 0 0 0
K 9.5 .43
250x125x6 250x125x6
/9 /9
O 0.26 0.0 1.42 126 167 151 101 101
A36 25310.5 10 0 0 1 1 1
K 3 83 545 55 05 86 24 24
O WF600x40 WF600x40 0. 954 261 100 409 863
141 4 0 9 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .93 8.8 23 .88 .98
- -
O 0.75 0.0 11.7 0. 130 167 189 101 101
A36 25310.5 9 25.9 15.2 1 1
K 8 85 77 85 01 05 83 24 24
45 72
O WF600x40 WF600x40 0. 633 226 685 268 861
142 4 0 6 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .67 4.6 1.1 .66 .42
-
O 0.54 0.0 13.2 8.05 0. 130 167 189 101 101
A36 25310.5 6 17.2 1 1
K 5 85 069 043 85 01 05 83 24 24
16
O WF600x40 WF600x40 0. 159 114 999 342 481
143 4 0 6 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 1.1 .67 7.1 .31 .95
- -
O 0.66 0.0 0.66 0. 123 151 189 101 101
A36 25310.5 6 43.2 11.7 1 1
K 3 48 873 85 12 86 83 24 24
29 47
H H
O 924 360
144 11 0 588x300x1 588x300x1 4 1.5 1.5 1.5 1.5 1 1 0 0 0
K 3.9 7.4
2/20 2/20
O 0.55 0.3 37.1 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 3 56 014 55 05 86 24 24
H H
O 629 222
145 11 0 588x300x1 588x300x1 4 2.3 2.3 2.3 2.3 1 1 0 0 0
K 7.6 0.8
2/20 2/20
O 0.37 0.2 25.2 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 7 19 759 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 334 753
146 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 9.4 .16
250x125x6 250x125x6
/9 /9
O 0.22 0.0 1.08 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 1 74 521 55 86 86 24 24
O WF600x40 WF600x40 0. 209 116 111 424 487
147 4 0 6 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 4.1 8.9 20 .13 .78
- -
O 0.80 0.0 6.81 0. 123 151 189 101 101
A36 25310.5 6 56.8 13.0 1 1
K 1 48 696 85 12 86 83 24 24
94 67
WF WF
250x125x6 250x125x6
O 386 741
148 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 6.2 .19
250x125x6 250x125x6
/9 /9
O 0.25 0.0 1.25 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 5 73 265 55 86 86 24 24
H H
O 876 229
149 10 0 600x200x1 600x200x1 5 1.2 1.2 1.2 1.2 1 1 0 0 0
K 7.5 3.9
1/17 1/17

16
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

-
O 0.52 0.2 126 167 151 101 101
A36 25310.5 5 0 22.6 0 1 1 1
K 5 27 55 05 86 24 24
79
H H
O 329 195
150 11 0 588x300x1 588x300x1 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K 1 5
2/20 2/20
O 0.19 0.2 13.2 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 05 087 55 05 86 24 24
H H
O 618 131
151 10 0 600x200x1 600x200x1 2 1.4 1.4 1.4 1.4 1 1 0 0 0
K 2.8 6
1/17 1/17
-
O 0.1 126 167 151 101 101
0.37 A36 25310.5 2 0 15.9 0 1 1 1
K 3 55 05 86 24 24
93
H H
O 307 113
152 10 0 600x200x1 600x200x1 2 1 1 1 1 1 1 0 0 0
K 6.5 1.2
1/17 1/17
-
O 0.18 0.1 126 167 151 101 101
A36 25310.5 2 0 7.95 0 1 1 1
K 4 12 55 05 86 24 24
8
WF WF
250x125x6 250x125x6
O 594 155
177 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.6 8.8
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.92 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 54 574 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 678 173
178 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.3 4.5
250x125x6 250x125x6
/9 /9
O 0.44 0.1 2.19 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 71 779 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 598 163
179 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 5.4 4.2
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.93 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 61 926 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 319 883
180 2 0 /9, H /9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.9 .06
250x125x6 250x125x6
/9 /9
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 8 0 1.03 0 1 1 1
K 1 87 55 05 86 24 24
45
WF WF
300x150x6. 300x150x6.
O 277 719
181 3 0 5/9, H 5/9, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 7.6 .54
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.1 1.33 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 18 509 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 145 323
182 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.3 .33
250x125x6 250x125x6
/9 /9
O 0.08 0.0 0.47 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 6 121 55 05 86 24 24

17
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

H H
O 703 216
183 10 0 600x200x1 600x200x1 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 0.2 9.8
1/17 1/17
O 0.42 0.2 18.1 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 34 848 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 423 105
184 2 0 /9, H /9, H 12 1.5 1.5 1.5 1.5 1 1 0 0 0
K 0.3 4.1
250x125x6 250x125x6
/9 /9
-
O 0.25 0.1 126 167 151 101 101
A36 25310.5 12 0 1.37 0 1 1 1
K 3 04 55 05 86 24 24
06
H H
O 668 187
185 10 0 600x200x1 600x200x1 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K 1.4 8.1
1/17 1/17
O 0.2 17.2 126 167 151 101 101
0.4 A36 25310.5 1 0 0 1 1 1
K 09 825 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 191 214
186 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 6.4 .92
250x125x6 250x125x6
/9 /9
-
O 0.11 0.0 126 167 151 101 101
A36 25310.5 1 0 0.62 0 1 1 1
K 5 85 55 05 86 24 24
09
WF WF
250x125x6 250x125x6
O 125 45.
187 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 5.7 039
250x125x6 250x125x6
/9 /9
-
O 0.07 0.0 126 167 151 101 101
A36 25310.5 1 0 0.40 0 1 1 1
K 5 54 55 05 86 24 24
68
H H
O 508 691
188 11 0 588x300x1 588x300x1 1 3 3 3 3 1 1 0 0 0
K 5.5 .32
2/20 2/20
-
O 0.30 0.0 126 167 151 101 101
A36 25310.5 1 0 20.4 0 1 1 1
K 4 92 55 05 86 24 24
11
H H
O 508 188
189 11 0 588x300x1 588x300x1 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 6 0
2/20 2/20
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 20.4 0 1 1 1
K 4 93 55 05 86 24 24
13
H H
O 687 247
190 11 0 588x300x1 588x300x1 8 1.95 1.95 1.95 1.95 1 1 0 0 0
K 1.4 6.7
2/20 2/20
O 0.41 0.2 27.5 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 1 45 789 55 05 86 24 24
H H
O 479 126
191 10 0 600x200x1 600x200x1 9 1.7 1.7 1.7 1.7 1 1 0 0 0
K 2.4 0
1/17 1/17
O 0.28 0.1 12.3 126 167 151 101 101
A36 25310.5 9 0 0 1 1 1
K 7 5 963 55 05 86 24 24
H H
O 545 134
192 10 0 600x200x1 600x200x1 5 1.3 1.3 1.3 1.3 1 1 0 0 0
K 5.7 7
1/17 1/17
O 0.32 0.1 14.1 126 167 151 101 101
A36 25310.5 5 0 0 1 1 1
K 7 48 122 55 05 86 24 24
H H
O 891 237
193 10 0 600x200x1 600x200x1 9 1.2 1.2 1.2 1.2 1 1 0 0 0
K 5.8 2.1
1/17 1/17

18
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

-
O 0.53 0.2 126 167 151 101 101
A36 25310.5 9 0 23.0 0 1 1 1
K 4 34 55 05 86 24 24
62
WF WF
300x150x6. 300x150x6.
O 537 108
194 3 0 5/9, H 5/9, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 3.5 .79
300x150x6. 300x150x6.
5/9 5/9
O 0.32 0.0 2.58 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 53 286 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 413 586
195 3 0 5/9, H 5/9, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 1.8 .07
300x150x6. 300x150x6.
5/9 5/9
O 0.24 0.1 1.98 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 12 602 55 05 86 24 24
H H
O 907 293
196 11 0 588x300x1 588x300x1 8 1.95 1.95 1.95 1.95 1 1 0 0 0
K 2.1 2.2
2/20 2/20
O 0.54 0.2 36.4 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 3 9 118 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 679 211
197 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 9.7 1
250x125x6 250x125x6
/9 /9
O 0.44 0.2 2.20 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 09 309 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 596 183
198 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 2.2 5.3
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.93 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 81 176 55 86 86 24 24
H H
O 102 335
199 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 42 .79
1/17 1/17
O 0.61 0.0 26.4 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 36 934 55 05 86 24 24
H H
O 715 145
200 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 2.5 6
1/17 1/17
O 0.42 0.1 18.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 45 012 55 05 86 24 24
H H
O 553 190
201 11 0 588x300x1 588x300x1 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 9.1 2.2
2/20 2/20
-
O 0.33 126 167 151 101 101
0.2 A36 25310.5 1 0 22.2 0 1 1 1
K 2 55 05 86 24 24
32
WF WF
250x125x6 250x125x6
O 443 613
202 2 0 /9, H /9, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 6.6 .57
250x125x6 250x125x6
/9 /9
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 1.43 0 1 1 1
K 6 14 55 05 86 24 24
74
WF WF
250x125x6 250x125x6
O 332
203 2 0 /9, H /9, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0 391
K 1.8
250x125x6 250x125x6
/9 /9

19
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 1 0 1.07 0 1 1 1
K 9 92 55 05 86 24 24
63
H H
O 908 163
204 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 8.2 .65
1/17 1/17
O 0.54 0.0 23.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 19 082 55 05 86 24 24
H H
O 656 126
205 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 1.1 6.5
1/17 1/17
O 0.39 0.1 16.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 26 713 55 05 86 24 24
H H
O 554 778
206 11 0 588x300x1 588x300x1 1 3 3 3 3 1 1 0 0 0
K 0 .9
2/20 2/20
-
O 0.33 0.1 126 167 151 101 101
A36 25310.5 1 0 22.2 0 1 1 1
K 2 31 55 05 86 24 24
35
H H
O 635 121
209 10 0 600x200x1 600x200x1 6 1.2 1.2 1.2 1.2 1 1 0 0 0
K 9.5 2.5
1/17 1/17
-
O 0.38 0.1 126 167 151 101 101
A36 25310.5 6 0 16.4 0 1 1 1
K 1 2 55 05 86 24 24
5
H H
O 345 100
210 10 0 600x200x1 600x200x1 2 1.3 1.3 1.3 1.3 1 1 0 0 0
K 7.9 9.8
1/17 1/17
O 0.20 8.94 126 167 151 101 101
0.1 A36 25310.5 2 0 0 1 1 1
K 7 443 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 600 178
211 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 1.8 4.8
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.94 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 76 458 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 265 322
212 2 0 /9, H /9, H 5 1.05 1.05 1.05 1.05 1 1 0 0 0
K 8.4 .51
250x125x6 250x125x6
/9 /9
-
O 0.15 0.0 126 167 151 101 101
A36 25310.5 5 0 0.86 0 1 1 1
K 9 74 55 05 86 24 24
13
WF WF
250x125x6 250x125x6
O 955 23.
213 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .36 48
250x125x6 250x125x6
/9 /9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 7 43 55 05 86 24 24
95
H H
O 231 816
214 10 0 600x200x1 600x200x1 6 0.9 0.9 0.9 0.9 1 1 0 0 0
K 0.5 .39
1/17 1/17
O 0.13 0.0 5.97 126 167 151 101 101
A36 25310.5 6 0 0 1 1 1
K 8 83 646 55 05 86 24 24
H H
O 910 722
215 10 0 600x200x1 600x200x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 9.5 .4
1/17 1/17
O 0.54 0.0 23.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 76 632 55 05 86 24 24
O WF WF 442 134
216 6 0 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 450x200x9 450x200x9 1.4 0.2

20
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

/14, H /14, H
450x200x9 450x200x9
/14 /14
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 6.58 0 1 1 1
K 5 55 55 05 86 24 24
3
WF WF
450x200x9 450x200x9
O 541 121
217 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 4.3 1.5
450x200x9 450x200x9
/14 /14
-
O 0.32 0.1 126 167 151 101 101
A36 25310.5 1 0 8.06 0 1 1 1
K 4 46 55 05 86 24 24
13
WF WF
250x125x6 250x125x6
O 714 166
218 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 9.1 0.3
250x125x6 250x125x6
/9 /9
O 0.47 0.1 2.31 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 64 629 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 355 11.
219 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 8 658
250x125x6 250x125x6
/9 /9
-
O 0.23 0.1 126 151 151 101 101
A36 25310.5 1 0 1.15 0 1 1 1
K 4 09 55 86 86 24 24
28
WF WF
250x125x6 250x125x6
O 753 179
220 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.1 7.1
250x125x6 250x125x6
/9 /9
O 0.49 0.1 2.44 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 78 073 55 86 86 24 24
H H
O 488 234
221 11 0 588x300x1 588x300x1 1 1 1 1 1 1 1 0 0 0
K 7.3 8.7
2/20 2/20
O 0.29 0.2 19.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 47 157 55 05 86 24 24
H H
O 605 163
222 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 3.5 4.4
2/20 2/20
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 1 0 24.2 0 1 1 1
K 2 75 55 05 86 24 24
96
WF WF
450x200x9 450x200x9
O 366 107
223 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.9 4.6
450x200x9 450x200x9
/14 /14
-
O 0.21 0.1 126 167 151 101 101
A36 25310.5 1 0 5.45 0 1 1 1
K 9 29 55 05 86 24 24
82
WF WF
450x200x9 450x200x9
O 388 112
224 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 8.9 5.8
450x200x9 450x200x9
/14 /14
-
O 0.23 0.1 126 167 151 101 101
A36 25310.5 1 0 5.79 0 1 1 1
K 3 38 55 05 86 24 24
02

21
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

H H
O 347 368
225 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.6 .69
2/20 2/20
O 0.20 0.0 13.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 51 374 55 05 86 24 24
H H
O 345 602
226 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.1 .38
2/20 2/20
O 0.20 0.0 13.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 75 554 55 05 86 24 24
H H
O 241 209
227 11 0 588x300x1 588x300x1 1 1 1 1 1 1 1 0 0 0
K 1.7 8
2/20 2/20
O 0.2 9.67 126 167 151 101 101
0.18 A36 25310.5 1 0 0 1 1 1
K 19 946 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 158 216
230 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 5.8 9.9
450x200x9 450x200x9
/14 /14
O 0.09 0.2 2.36 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 14 102 55 05 86 24 24
H H
O 450 242
231 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 1.8 6.3
2/20 2/20
O 0.26 0.2 18.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 41 686 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 166 226
232 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 6.8 6.5
450x200x9 450x200x9
/14 /14
O 0.2 2.48 126 167 151 101 101
0.1 A36 25310.5 1 0 0 1 1 1
K 24 163 55 05 86 24 24
H H
O 695 798
233 11 0 588x300x1 588x300x1 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 3.5 .11
2/20 2/20
O 0.41 0.0 27.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 86 084 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 291 888
234 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 3.9 .66
450x200x9 450x200x9
/14 /14
O 0.17 0.1 4.33 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 04 846 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 128 5.8
235 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 1.4 48
250x125x6 250x125x6
/9 /9
O 0.07 0.0 0.41 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 55 517 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 270 28.
236 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K .64 817
300x150x6. 300x150x6.
5/9 5/9
O 0.01 0.0 0.13 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 22 009 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 572 521
237 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 3.8 .97
300x150x6. 300x150x6.
5/9 5/9

22
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

O 0.34 0.0 2.75 126 167 151 101 101


A36 25310.5 1 0 0 1 1 1
K 3 55 123 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 248 100
241 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 4.6 0.8
300x150x6. 300x150x6.
5/9 5/9
O 0.14 0.1 1.19 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 1 427 55 05 86 24 24
H H
O 383 137
242 11 0 588x300x1 588x300x1 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 1 9.3
2/20 2/20
-
O 0.22 0.1 126 167 151 101 101
A36 25310.5 1 0 15.3 0 1 1 1
K 9 39 55 05 86 24 24
76
WF WF
450x200x9 450x200x9
O 202 938
243 6 0 /14, H /14, H 1 0.75 0.75 0.75 0.75 1 1 0 0 0
K 1.5 .62
450x200x9 450x200x9
/14 /14
-
O 0.12 0.1 126 167 151 101 101
A36 25310.5 1 0 3.00 0 1 1 1
K 1 02 55 05 86 24 24
98
WF WF
450x200x9 450x200x9
O 307 219
244 6 0 /14, H /14, H 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 6.5 .42
450x200x9 450x200x9
/14 /14
-
O 0.18 0.0 126 167 151 101 101
A36 25310.5 1 0 4.58 0 1 1 1
K 4 32 55 05 86 24 24
06
WF WF
300x150x6. 300x150x6.
O 245 232
245 3 0 5/9, H 5/9, H 1 1.25 1.25 1.25 1.25 1 1 0 0 0
K 5.4 .65
300x150x6. 300x150x6.
5/9 5/9
O 0.14 0.0 1.18 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 74 023 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 256 643
246 6 0 /14, H /14, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 6.9 .16
450x200x9 450x200x9
/14 /14
-
O 0.15 0.0 126 167 151 101 101
A36 25310.5 1 0 3.82 0 1 1 1
K 4 9 55 05 86 24 24
18
WF WF
450x200x9 450x200x9
O 333 458
247 6 0 /14, H /14, H 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K 1.6 .49
450x200x9 450x200x9
/14 /14
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 1 0 4.96 0 1 1 1
K 9 94 55 05 86 24 24
03
WF WF
450x200x9 450x200x9
O 283 129
248 6 0 /14, H /14, H 1 2.3 2.3 2.3 2.3 1 1 0 0 0
K 0.6 .97
450x200x9 450x200x9
/14 /14
-
O 0.16 0.0 126 167 151 101 101
A36 25310.5 1 0 4.21 0 1 1 1
K 9 78 55 05 86 24 24
44
WF WF
O 244 308
249 6 0 450x200x9 450x200x9 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 9.1 .66
/14, H /14, H

23
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

450x200x9 450x200x9
/14 /14
-
O 0.14 0.0 126 167 151 101 101
A36 25310.5 1 0 3.64 0 1 1 1
K 7 72 55 05 86 24 24
65
WF WF
300x150x6. 300x150x6.
O 201 441
250 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 9.8 .11
300x150x6. 300x150x6.
5/9 5/9
O 0.12 0.0 0.97 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 72 083 55 05 86 24 24
H H
O 627 150
256 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.9 8.1
2/20 2/20
-
O 0.37 0.1 126 167 151 101 101
A36 25310.5 1 0 25.1 0 1 1 1
K 6 79 55 05 86 24 24
85
H H
O 277 675
257 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 5.6 .09
1/17 1/17
O 0.16 0.0 7.17 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 72 966 55 05 86 24 24
H H
O 277 357
258 10 0 600x200x1 600x200x1 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 6.1 .9
1/17 1/17
O 0.16 0.0 7.18 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 4 085 55 05 86 24 24
H H
O 310 107
259 10 0 600x200x1 600x200x1 6 1.25 1.25 1.25 1.25 1 1 0 0 0
K 4.6 7.7
1/17 1/17
-
O 0.18 0.1 126 167 151 101 101
A36 25310.5 6 0 8.03 0 1 1 1
K 6 06 55 05 86 24 24
06
H H
O 607 167
263 11 0 588x300x1 588x300x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 7 0.9
2/20 2/20
O 0.36 0.1 24.3 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 69 905 55 05 86 24 24
H H
O 522 202
264 11 0 588x300x1 588x300x1 8 2 2 2 2 1 1 0 0 0
K 3.1 3.5
2/20 2/20
O 0.31 20.9 126 167 151 101 101
0.2 A36 25310.5 8 0 0 1 1 1
K 3 633 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 399 760
265 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.8 .59
450x200x9 450x200x9
/14 /14
-
O 0.23 0.1 126 167 151 101 101
A36 25310.5 1 0 5.94 0 1 1 1
K 9 02 55 05 86 24 24
93
H H
O 715 258
266 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 4.2 .13
2/20 2/20
O 0.42 0.0 28.7 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 27 141 55 05 86 24 24
H H
O 523 166
267 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 5 0.4
2/20 2/20
O 0.31 0.1 21.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 66 113 55 05 86 24 24
WF WF
O 434 847
269 3 0 300x150x6. 300x150x6. 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 4.8 .07
5/9, H 5/9, H

24
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

300x150x6. 300x150x6.
5/9 5/9
O 0.0 2.08 126 167 151 101 101
0.26 A36 25310.5 1 0 0 1 1 1
K 98 839 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 270 90.
270 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 7.6 946
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.0 1.30 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 37 146 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 293 1.4
271 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 8.2 114
450x200x9 450x200x9
/14 /14
O 0.17 0.0 4.37 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 04 464 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 291 889
272 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.7 .54
450x200x9 450x200x9
/14 /14
O 0.17 0.1 4.34 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 05 108 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 424 97.
273 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 3.9 475
450x200x9 450x200x9
/14 /14
-
O 0.25 0.0 126 167 151 101 101
A36 25310.5 1 0 6.31 0 1 1 1
K 4 27 55 05 86 24 24
87
WF WF
450x200x9 450x200x9
O 424 785
274 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 1.6 .83
450x200x9 450x200x9
/14 /14
-
O 0.25 0.1 126 167 151 101 101
A36 25310.5 1 0 6.31 0 1 1 1
K 4 12 55 05 86 24 24
52
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 218 994
275 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 8.4 .8
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.59 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 06 327 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 401 100
276 6 0 /14, H /14, H 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 0.4 .38
450x200x9 450x200x9
/14 /14
-
O 0.0 126 167 151 101 101
0.24 A36 25310.5 1 0 5.97 0 1 1 1
K 11 55 05 86 24 24
1
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 220 990
277 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.5 .12
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.60 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 758 55 05 86 24 24

25
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

H H
O 716 274
278 11 0 588x300x1 588x300x1 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 8.3 .44
2/20 2/20
O 0.42 0.0 28.7 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 41 708 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 222 979
279 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.4 .79
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.63 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 07 112 55 05 86 24 24
H H
O 668 899
280 11 0 588x300x1 588x300x1 1 0.85 0.85 0.85 0.85 1 1 0 0 0
K 2.2 .85
2/20 2/20
O 0.1 26.8 126 167 151 101 101
0.4 A36 25310.5 1 0 0 1 1 1
K 01 198 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 390 193
281 6 0 /14, H /14, H 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 0.3 .09
450x200x9 450x200x9
/14 /14
-
O 0.23 0.0 126 167 151 101 101
A36 25310.5 1 0 5.80 0 1 1 1
K 3 23 55 05 86 24 24
71
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 221 993
282 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.5 .2
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.61 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 941 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 544 161
289 3 0 5/9, H 5/9, H 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K 6.6 .47
300x150x6. 300x150x6.
5/9 5/9
O 0.32 0.0 2.61 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 86 799 55 05 86 24 24
H H
O 804 198
290 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 7.4 7.3
1/17 1/17
O 0.48 0.1 20.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 97 16 55 05 86 24 24
H H
O 102 716
291 10 0 600x200x1 600x200x1 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 97 .98
1/17 1/17
O 0.61 0.0 26.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 87 357 55 05 86 24 24
H H
O 815 933
292 10 0 600x200x1 600x200x1 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 5.8 .42
1/17 1/17
O 0.48 0.0 21.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 98 964 55 05 86 24 24
H H
O 640 243
293 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 7.3 4.4
1/17 1/17
O 0.38 0.2 16.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 55 735 55 05 86 24 24
H H
O 591 224
294 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 2.5 3.6
1/17 1/17
O 0.35 0.2 15.2 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 36 937 55 05 86 24 24

26
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

WF WF
450x200x9 450x200x9
O 446 6.1
295 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 0.5 612
450x200x9 450x200x9
/14 /14
-
O 0.26 0.0 126 167 151 101 101
A36 25310.5 1 0 6.64 0 1 1 1
K 7 08 55 05 86 24 24
12
WF WF
450x200x9 450x200x9
O 541 119
296 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 5.9 .26
450x200x9 450x200x9
/14 /14
-
O 0.32 0.0 126 167 151 101 101
A36 25310.5 1 0 8.06 0 1 1 1
K 4 27 55 05 86 24 24
37
WF WF
450x200x9 450x200x9
O 441 134
297 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 3.6 2.1
450x200x9 450x200x9
/14 /14
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 6.57 0 1 1 1
K 4 56 55 05 86 24 24
14
WF WF
450x200x9 450x200x9
O 505 152
298 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 7 8.6
450x200x9 450x200x9
/14 /14
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 7.52 0 1 1 1
K 3 77 55 05 86 24 24
94
H H
O 103 81.
299 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 07 161
1/17 1/17
O 0.61 0.0 26.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 09 607 55 05 86 24 24
H H
O 987 112
300 10 0 600x200x1 600x200x1 1 0.9 0.9 0.9 0.9 1 1 0 0 0
K 8.3 4.1
1/17 1/17
O 0.59 0.1 25.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 23 519 55 05 86 24 24
H H
O 888 947
301 10 0 600x200x1 600x200x1 1 0.9 0.9 0.9 0.9 1 1 0 0 0
K 7.1 .7
1/17 1/17
O 0.53 0.1 22.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 88 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 329 150
302 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.2 7.2
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.89 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 57 884 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 329 152
303 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 2.8 2.3
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.90 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 57 194 55 05 86 24 24
WF WF
O 1.55 1.55 1.55 1.55 331 153
304 5 0 400x200x8 400x200x8 1 1 1 0 0 0
K 563 563 563 563 4.3 1.1
/13, H /13, H

27
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.92 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 58 744 55 05 86 24 24
H H
O 913 39.
305 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 9.9 115
1/17 1/17
O 0.54 0.0 23.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 06 42 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 332 149
306 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 2.9 2.1
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.93 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 59 762 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 849 363
307 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K .3 .78
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 1 36 55 05 86 24 24
63
WF WF
200x100x5. 200x100x5.
O 848 487
308 1 0 5/8, H 5/8, H 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K .18 .6
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 151 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 6 48 55 86 86 24 24
61
WF WF
200x100x5. 200x100x5.
O 825 340
309 1 0 5/8, H 5/8, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K .24 .9
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 151 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 4 34 55 86 86 24 24
18
WF WF
200x100x5. 200x100x5.
O 405
310 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0 302
K .96
200x100x5. 200x100x5.
5/8 5/8
-
O 0.02 0.0 126 167 151 101 101
A36 25310.5 1 0 0.07 0 1 1 1
K 4 3 55 05 86 24 24
47
WF WF
200x100x5. 200x100x5.
O 175 90.
311 1 0 5/8, H 5/8, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 0.2 062
200x100x5. 200x100x5.
5/8 5/8
O 0.11 0.0 0.32 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 68 204 55 86 86 24 24
WF WF
200x100x5. 200x100x5.
O 311 519
312 1 0 5/8, H 5/8, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 9 .18
200x100x5. 200x100x5.
5/8 5/8
-
O 0.18 0.0 126 167 151 101 101
A36 25310.5 1 0 0.57 0 1 1 1
K 7 51 55 05 86 24 24
39
O WF WF 322 112
313 1 0 1 3 3 3 3 1 1 0 0 0
K 200x100x5. 200x100x5. 2.5 9.9

28
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

5/8, H 5/8, H
200x100x5. 200x100x5.
5/8 5/8
-
O 0.28 0.1 126 112 151 101 101
A36 25310.5 1 0 0.59 0 1 1 1
K 6 12 55 49 86 24 24
29
WF WF
200x100x5. 200x100x5.
O 322 739
314 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.1 .26
200x100x5. 200x100x5.
5/8 5/8
-
O 0.21 0.0 126 151 151 101 101
A36 25310.5 1 0 0.59 0 1 1 1
K 2 73 55 86 86 24 24
32
WF WF
200x100x5. 200x100x5.
O 747 421
315 1 0 5/8, H 5/8, H 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K .97 .06
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 9 42 55 86 86 24 24
76
WF WF
200x100x5. 200x100x5.
O 746 381
316 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .91 .14
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 9 38 55 86 86 24 24
74
WF WF
200x100x5. 200x100x5.
O 733 403
317 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .06 .29
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 8 4 55 86 86 24 24
49
WF WF
200x100x5. 200x100x5.
O 521 259
318 1 0 5/8, H 5/8, H 1 1 1 1 1 1 1 0 0 0
K .56 .41
200x100x5. 200x100x5.
5/8 5/8
-
O 0.03 0.0 126 167 151 101 101
A36 25310.5 1 0 0.09 0 1 1 1
K 1 26 55 05 86 24 24
6
WF WF
200x100x5. 200x100x5.
O 165 765
319 1 0 5/8, H 5/8, H 1 2 2 2 2 1 1 0 0 0
K 0.4 .82
200x100x5. 200x100x5.
5/8 5/8
-
O 0.10 0.0 126 151 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 9 76 55 86 86 24 24
37
WF WF
200x100x5. 200x100x5.
O 164 535
320 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 7.4 .37
200x100x5. 200x100x5.
5/8 5/8
-
O 0.10 0.0 126 151 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 8 53 55 86 86 24 24
31
WF WF
O 251 208
321 1 0 200x100x5. 200x100x5. 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K .8 .11
5/8, H 5/8, H

29
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

200x100x5. 200x100x5.
5/8 5/8
-
O 0.01 0.0 126 167 151 101 101
A36 25310.5 1 0 0.04 0 1 1 1
K 5 21 55 05 86 24 24
63
WF WF
200x100x5. 200x100x5.
O 226 941
322 1 0 5/8, H 5/8, H 1 2.3 2.3 2.3 2.3 1 1 0 0 0
K 6 .46
200x100x5. 200x100x5.
5/8 5/8
-
O 0.15 0.0 126 146 151 101 101
A36 25310.5 1 0 0.41 0 1 1 1
K 4 93 55 73 86 24 24
7
WF WF
300x150x6. 300x150x6.
O 874 363
323 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K .17 .8
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.42 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 47 018 55 05 86 24 24
H H
O 491 122
324 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 4.3 3.8
2/20 2/20
-
O 0.29 0.1 126 167 151 101 101
A36 25310.5 1 0 19.7 0 1 1 1
K 4 23 55 05 86 24 24
24
WF WF
450x200x9 450x200x9
O 264 555
325 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.6 .48
450x200x9 450x200x9
/14 /14
-
O 0.15 0.0 126 167 151 101 101
A36 25310.5 1 0 3.94 0 1 1 1
K 9 7 55 05 86 24 24
34
H H
O 513 114
326 11 0 588x300x1 588x300x1 1 0.1 0.1 0.1 0.1 1 1 0 0 0
K 0.9 9.9
2/20 2/20
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 20.5 0 1 1 1
K 7 14 55 05 86 24 24
93
WF WF
450x200x9 450x200x9
O 178 862
327 6 0 /14, H /14, H 1 0.1 0.1 0.1 0.1 1 1 0 0 0
K 5 .57
450x200x9 450x200x9
/14 /14
-
O 0.10 0.0 126 167 151 101 101
A36 25310.5 1 0 2.65 0 1 1 1
K 7 87 55 05 86 24 24
77
H H
O 604 101
328 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.4 7.7
2/20 2/20
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 1 0 24.2 0 1 1 1
K 2 02 55 05 86 24 24
76
WF WF
450x200x9 450x200x9
O 153 104
329 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 9.8 8.1
450x200x9 450x200x9
/14 /14
-
O 0.09 0.1 126 167 151 101 101
A36 25310.5 1 0 2.29 0 1 1 1
K 2 1 55 05 86 24 24
26
WF WF
O 898 13.
330 3 0 300x150x6. 300x150x6. 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K .6 486
5/9, H 5/9, H

30
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.43 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 05 193 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 899 383
331 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K .09 .9
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.43 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 49 216 55 05 86 24 24
H H
O 344 252
332 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 0.8 2.4
2/20 2/20
O 0.20 0.2 13.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 52 1 55 05 86 24 24
H H
O 231 260
333 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.8 8.7
2/20 2/20
O 0.13 0.2 9.30 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 62 688 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 755 352
334 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .11 .94
250x125x6 250x125x6
/9 /9
O 0.04 0.0 0.24 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 44 466 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 643 372
335 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .99 .47
250x125x6 250x125x6
/9 /9
O 0.03 0.0 0.20 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 42 865 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 783 305
336 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .35 .99
250x125x6 250x125x6
/9 /9
O 0.04 0.0 0.25 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 48 381 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 605 504
337 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .73 .84
250x125x6 250x125x6
/9 /9
O 0.03 0.0 0.19 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 53 626 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 333 185
338 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 2.3 .7
450x200x9 450x200x9
/14 /14
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 1 0 4.96 0 1 1 1
K 9 35 55 05 86 24 24
14
H H
O 254 504
339 10 0 600x200x1 600x200x1 2 0.95 0.95 0.95 0.95 1 1 0 0 0
K 1.8 .05
1/17 1/17
O 0.15 0.0 6.57 126 167 151 101 101
A36 25310.5 2 0 0 1 1 1
K 2 51 486 55 05 86 24 24
WF WF
O 0.07 0.07 0.07 0.07 462 105
340 1 0 200x100x5. 200x100x5. 1 1 1 0 0 0
K 3 3 3 3 .75 3.8
5/8, H 5/8, H

31
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

200x100x5. 200x100x5.
5/8 5/8
O 0.02 0.1 0.08 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 04 515 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 248 641
341 6 0 /14, H /14, H 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 1.3 .68
450x200x9 450x200x9
/14 /14
-
O 0.14 0.0 126 167 151 101 101
A36 25310.5 1 0 3.69 0 1 1 1
K 9 65 55 05 86 24 24
44
WF WF
300x150x6. 300x150x6.
O 454 48.
342 3 0 5/9, H 5/9, H 1 1.55 1.55 1.55 1.55 1 1 0 0 0
K 3.6 616
300x150x6. 300x150x6.
5/9 5/9
O 0.27 0.0 2.18 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 72 395 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.42 0.42 0.42 0.42 268 102
343 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 6 6 6 6 8.1 4.2
200x100x5. 200x100x5.
5/8 5/8
O 0.16 0.1 0.49 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 07 461 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 469 274
344 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 4.7 .67
200x100x5. 200x100x5.
5/8 5/8
O 0.28 0.0 0.86 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 66 383 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.56 0.56 0.56 0.56 313 921
345 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 603 603 603 603 9.9 .55
200x100x5. 200x100x5.
5/8 5/8
O 0.18 0.1 0.57 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 01 774 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 277 137
346 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 0.5 .96
200x100x5. 200x100x5.
5/8 5/8
O 0.16 0.0 0.50 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 68 977 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.42 0.42 0.42 0.42 184 722
347 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 406 406 406 406 4.2 .87
200x100x5. 200x100x5.
5/8 5/8
O 0.0 0.33 126 167 151 101 101
0.11 A36 25310.5 1 0 0 1 1 1
K 77 933 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 1.20 1.20 1.20 1.20 126 346
348 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 208 208 208 208 9.9 .15
200x100x5. 200x100x5.
5/8 5/8
O 0.07 0.0 0.23 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 36 366 55 05 86 24 24
WF WF
O 1.20 1.20 1.20 1.20 127 346
349 1 0 200x100x5. 200x100x5. 1 1 1 0 0 0
K 208 208 208 208 3.3 .87
5/8, H 5/8, H

32
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

200x100x5. 200x100x5.
5/8 5/8
O 0.07 0.0 0.23 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 36 429 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 985 565
350 2 0 /9, H /9, H 4 1.5 1.5 1.5 1.5 1 1 0 0 0
K .59 .18
250x125x6 250x125x6
/9 /9
O 0.05 0.0 0.31 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 9 56 933 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 643 109
353 6 0 /14, H /14, H 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K .54 1.7
450x200x9 450x200x9
/14 /14
-
O 0.03 0.1 126 167 151 101 101
A36 25310.5 1 0 0.95 0 1 1 1
K 9 1 55 05 86 24 24
82
WF WF
250x125x6 250x125x6
O 161 171
355 2 0 /9, H /9, H 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 8.2 6.6
250x125x6 250x125x6
/9 /9
-
O 0.09 0.1 126 167 151 101 101
A36 25310.5 1 0 0.52 0 1 1 1
K 7 74 55 05 86 24 24
43
WF WF
300x150x6. 300x150x6.
O 282 468
356 3 0 5/9, H 5/9, H 2 1 1 1 1 1 1 0 0 0
K 4.2 .93
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.0 1.35 126 167 151 101 101
A36 25310.5 2 0 0 1 1 1
K 9 9 752 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 573 111
358 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 2.5 0.3
300x150x6. 300x150x6.
5/9 5/9
O 0.34 0.1 2.75 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 61 543 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 226 603
359 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 1.4 .58
200x100x5. 200x100x5.
5/8 5/8
-
O 0.14 0.0 126 151 151 101 101
A36 25310.5 1 0 0.41 0 1 1 1
K 9 6 55 86 86 24 24
61
H H
O 627 110
360 11 0 588x300x1 588x300x1 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K 1.3 3.1
2/20 2/20
O 0.37 0.1 25.1 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 32 704 55 05 86 24 24
H H
O 0. 279 106 323 132 234
361 12 0 200x200x8 200x200x8 9 2.2 2.2 2.2 2.2 1
K 85 .62 9.5 1.9 .52 .81
/12 /12
-
O 0.25 0.0 0.50 0.51 0. 132 167 189 101 101
A36 25310.5 9 1.77 1 1
K 5 23 481 711 85 73 05 83 24 24
64
H H
O 0. 259 469 236 95. 183
362 12 0 200x200x8 200x200x8 2 2.2 2.2 2.2 2.2 1
K 85 .87 .38 7 729 .16
/12 /12

33
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

- -
O 0.17 0.0 0.22 0. 132 167 189 101 101
A36 25310.5 2 1.65 0.37 1 1
K 2 18 155 85 73 05 83 24 24
1 87
H H
O 0. 124 357 185 47. 187
363 12 0 200x200x8 200x200x8 5 2.2 2.2 2.2 2.2 1
K 85 .07 .68 4.3 206 .03
/12 /12
-
O 0.12 0.0 0.16 0.29 0. 132 167 189 101 101
A36 25310.5 5 0.78 1 1
K 8 18 882 668 85 73 05 83 24 24
82
H H
O 0. 242 124 222 53. 275
364 12 0 200x200x8 200x200x8 2 2.2 2.2 2.2 2.2 1
K 85 .77 .51 7 377 .36
/12 /12
-
O 0.14 0.0 0.05 0.35 0. 132 167 189 101 101
A36 25310.5 2 1.54 1 1
K 3 27 877 632 85 73 05 83 24 24
23
WF WF
300x150x6. 300x150x6.
O 927
365 3 0 5/9, H 5/9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0 540
K .76
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.44 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 53 594 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 869 523
366 3 0 5/9, H 5/9, H 6 1.5 1.5 1.5 1.5 1 1 0 0 0
K .03 .13
300x150x6. 300x150x6.
5/9 5/9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 6 0 0.41 0 1 1 1
K 2 52 55 05 86 24 24
77
WF WF
300x150x6. 300x150x6.
O 864 498
367 3 0 5/9, H 5/9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K .22 .67
300x150x6. 300x150x6.
5/9 5/9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 8 0 0.41 0 1 1 1
K 2 49 55 05 86 24 24
54
WF WF
300x150x6. 300x150x6.
O 578 411
368 3 0 5/9, H 5/9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .25 .02
300x150x6. 300x150x6.
5/9 5/9
O 0.03 0.0 0.27 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 43 795 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 213 511
369 2 0 /9, H /9, H 1 1.25 1.25 1.25 1.25 1 1 0 0 0
K 8.5 .45
250x125x6 250x125x6
/9 /9
O 0.12 0.0 0.69 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 88 288 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 609 670
370 2 1 /9, H /9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K 8.1 .83
250x125x6 250x125x6
/9 /9
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 8 0 1.97 0 1 1 1
K 5 31 55 05 86 24 24
58
H H
O 235 161
371 11 0 588x300x1 588x300x1 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 9.7 6.2
2/20 2/20

34
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

-
O 0.14 0.1 126 167 151 101 101
A36 25310.5 1 0 9.47 0 1 1 1
K 1 71 55 05 86 24 24
11
WF WF
450x200x9 450x200x9
O 307 36.
372 6 0 /14, H /14, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 6.8 104
450x200x9 450x200x9
/14 /14
-
O 0.18 0.0 126 167 151 101 101
A36 25310.5 1 0 4.58 0 1 1 1
K 4 31 55 05 86 24 24
1
H H
O 650 239
373 11 0 588x300x1 588x300x1 8 2 2 2 2 1 1 0 0 0
K 2.8 9.2
2/20 2/20
O 0.38 0.2 26.0 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 9 37 996 55 05 86 24 24
H H
O 329 928
374 10 0 600x200x1 600x200x1 6 0.6 0.6 0.6 0.6 1 1 0 0 0
K 7.3 .3
1/17 1/17
O 0.19 0.0 8.52 126 167 151 101 101
A36 25310.5 6 0 0 1 1 1
K 7 92 914 55 05 86 24 24

4.8.3 Check of Member displacement

Fig 4.10 Plot of Global displacement diagram

35
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Table 2. Displacement
RX RY RZ
Node Load DX (mm) DY (mm) DZ (mm) ([rad]) ([rad]) ([rad])
87 sLCB5 5.080354 24.691429 0 0.000636 0.000376 -0.000831
88 sLCB5 2.89751 16.259867 0 0.00075 0.0004 -0.000476
89 sLCB5 5.080354 18.459804 0 0.000607 -0.00061 -0.000831
90 sLCB5 2.89751 12.686809 0 0.000729 0.000068 -0.000476
95 sLCB5 3.834029 24.691429 -0.776507 0.00035 0.000696 -0.000831
96 sLCB5 2.182899 16.259867 -0.559634 -0.00049 0.000682 -0.000476
97 sLCB5 3.834029 18.459804 -0.661161 0.000146 -0.000252 -0.000831
98 sLCB5 2.182899 12.686809 -0.494424 -0.000595 -0.000016 -0.000476
99 sLCB5 0 0 0 0 0 0
100 sLCB5 3.834029 26.560916 0 0.000092 0.0004 -0.000831
101 sLCB5 0 0 0 0 0 0
102 sLCB5 2.182899 17.331784 0 0.000029 0.000246 -0.000476
103 sLCB5 -0.65274 24.691429 -0.550366 -0.001109 0.000402 -0.000831
104 sLCB5 -0.389703 16.259867 -0.382185 -0.001765 0.000228 -0.000476
105 sLCB5 -0.65274 18.459804 -0.412322 -0.000827 -0.000475 -0.000831
106 sLCB5 -0.389703 12.686809 -0.29829 -0.001022 -0.000399 -0.000476
107 sLCB5 0 0 0 0 0 0
108 sLCB5 -0.65274 26.560916 0 -0.000016 0.00034 -0.000831
109 sLCB5 0 0 0 0 0 0
110 sLCB5 -0.389703 17.331784 0 -0.000056 0.000333 -0.000476
111 sLCB5 1.61121 16.259867 -1.071931 0.000553 0.001403 -0.000476
112 sLCB5 1.61121 17.331784 0 0.000056 0.000482 -0.000476
115 sLCB5 0.181987 16.259867 -1.999378 -0.000798 0.001336 -0.000476
116 sLCB5 0.181987 17.331784 0 0.000015 0.001072 -0.000476
117 sLCB5 2.182899 15.330872 -2.868667 0.001945 0.000921 -0.000476
118 sLCB5 2.89751 15.330872 0 0.002005 -0.000257 -0.000476
119 sLCB5 -0.389703 15.330872 -2.217322 -0.002706 0.000854 -0.000476
120 sLCB5 2.182899 14.830644 -3.732215 0.00214 0.000342 -0.000476
121 sLCB5 2.89751 14.830644 0 0.002721 0.000453 -0.000476
122 sLCB5 -0.389703 14.830644 -3.120593 -0.002369 0.000419 -0.000476
123 sLCB5 2.182899 13.401421 -1.990853 0.001849 -0.00093 -0.000476
124 sLCB5 2.89751 13.401421 0 0.001243 -0.000433 -0.000476
125 sLCB5 -0.389703 13.401421 -1.901381 -0.002017 -0.000881 -0.000476
129 sLCB5 1.61121 15.330872 -5.198689 0.001665 0.001568 -0.000476
130 sLCB5 0.99188 14.830644 -7.637541 0.000144 -0.000257 -0.000476
131 sLCB5 1.61121 14.830644 -6.339591 0.001592 0.000916 -0.000476
132 sLCB5 0.99188 13.401421 -5.595017 0.000243 -0.001226 -0.000476
134 sLCB5 0.181987 15.330872 -5.254028 -0.001935 0.001101 -0.000476
135 sLCB5 0.181987 14.830644 -6.002943 -0.001806 0.000572 -0.000476
148 sLCB5 -0.65274 21.783337 -3.526529 -0.001682 0.000129 -0.000831

36
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

149 sLCB5 3.834029 21.783337 -3.97064 0.00161 0.00004 -0.000831


150 sLCB5 3.003146 21.783337 -5.675197 0.001263 -0.000654 -0.000831
155 sLCB5 3.834029 23.029662 -2.999624 0.001816 0.000874 -0.000831
156 sLCB5 5.080354 23.029662 0 0.002178 -0.000147 -0.000831
158 sLCB5 5.080354 21.783337 0 0.003124 -0.000011 -0.000831
159 sLCB5 -0.65274 20.370836 -2.65879 -0.00182 -0.000789 -0.000831
162 sLCB5 3.834029 20.370836 -2.929144 0.001571 -0.000865 -0.000831
163 sLCB5 5.080354 20.370836 0 0.002254 0.000259 -0.000831
172 sLCB5 0.178143 21.783337 -5.355318 -0.001397 0.000302 -0.000831
185 sLCB5 0.801317 14.830644 -7.590159 -0.000364 0.000656 -0.000476
188 sLCB5 0.801317 13.401421 -5.601249 -0.000203 -0.002857 -0.000476
207 sLCB5 2.670793 24.691429 -1.832147 0.000502 0.001862 -0.000831
208 sLCB5 3.003146 18.459804 -1.089849 0.000372 -0.001642 -0.000831
209 sLCB5 0.178143 24.691429 -1.683194 -0.000785 0.001653 -0.000831
210 sLCB5 0.178143 26.560916 0 -0.000033 0.000725 -0.000831
211 sLCB5 1.424468 24.691429 -2.287075 -0.000054 0.00028 -0.000831
212 sLCB5 1.424468 26.560916 0 0.000009 0.001769 -0.000831
213 sLCB5 2.670793 26.560916 0 -0.000011 0.000773 -0.000831
214 sLCB5 -0.65274 23.029662 -2.447389 -0.002286 0.000845 -0.000831
215 sLCB5 0.178143 22.697309 -5.018209 -0.00102 0.00065 -0.000831
216 sLCB5 2.670793 21.783337 -6.192299 0.000992 0.000462 -0.000831
217 sLCB5 2.670793 22.697309 -5.678968 0.000462 0.000829 -0.000831
218 sLCB5 0.178143 24.275987 -2.622967 -0.00055 0.001659 -0.000831
219 sLCB5 -0.029578 21.783337 -4.932405 -0.00152 -0.000203 -0.000831
220 sLCB5 2.670793 24.275987 -2.884824 0.000375 0.001878 -0.000831
221 sLCB5 2.172263 21.783337 -6.692971 0.000509 -0.000643 -0.000831
222 sLCB5 1.756821 24.275987 -3.29893 0.000104 0.001708 -0.000831
223 sLCB5 0.178143 23.029662 -4.717015 -0.002242 0.000899 -0.000831
224 sLCB5 -0.65274 20.869366 -3.14665 -0.001768 -0.000556 -0.000831
225 sLCB5 0.385864 18.459804 -1.332131 -0.000484 -0.001768 -0.000831
226 sLCB5 0.385864 19.082967 -2.69722 -0.001882 -0.001644 -0.000831
227 sLCB5 0.385864 20.370836 -4.775815 -0.001328 -0.000957 -0.000831
228 sLCB5 0.385864 20.869366 -5.252032 -0.0016 -0.000683 -0.000831
229 sLCB5 2.172263 18.459804 -1.50418 0.000245 -0.001932 -0.000831
230 sLCB5 2.172263 19.456864 -3.803619 0.000598 -0.001673 -0.000831
231 sLCB5 2.172263 20.370836 -5.395322 0.000709 -0.001157 -0.000831
232 sLCB5 3.003146 20.370836 -4.418602 0.001243 -0.001019 -0.000831
233 sLCB5 1.175203 18.459804 -1.613815 -0.000131 -0.002409 -0.000831
234 sLCB5 0.178143 23.362015 -4.309653 -0.000406 0.00116 -0.000831
235 sLCB5 1.756821 21.783337 -6.850329 0.000073 0.000756 -0.000831
236 sLCB5 0.385864 21.783337 -5.725364 -0.001245 -0.000414 -0.000831
237 sLCB5 1.673733 20.370836 -5.751332 0.000234 -0.000584 -0.000831
238 sLCB5 1.092114 24.275987 -3.229282 -0.000279 0.001486 -0.000831

37
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

239 sLCB5 2.670793 23.362015 -4.8167 0.000208 0.001364 -0.000831


240 sLCB5 1.092114 21.783337 -6.604851 -0.000616 0.000598 -0.000831
241 sLCB5 -0.029578 20.869366 -4.462812 -0.001656 -0.000501 -0.000831
242 sLCB5 -0.65274 21.284807 -3.417135 -0.001615 -0.000282 -0.000831
243 sLCB5 0.385864 21.284807 -5.517034 -0.001558 -0.000505 -0.000831
244 sLCB5 -0.65274 21.367896 -3.453116 -0.001852 -0.00022 -0.000831
245 sLCB5 0.385864 21.367896 -5.558022 -0.001674 -0.000478 -0.000831
246 sLCB5 -0.237299 20.869366 -4.04242 -0.001711 -0.000511 -0.000831
247 sLCB5 -0.237299 21.783337 -4.48041 -0.001609 -0.000377 -0.000831
248 sLCB5 2.129373 19.413975 -3.755323 0.000677 -0.001761 -0.000831
249 sLCB5 1.423448 20.120551 -5.658931 0.000694 -0.001344 -0.000831
250 sLCB5 0.71842 19.415523 -4.105176 -0.00063 -0.002449 -0.000831
251 sLCB5 1.424346 18.708947 -2.38713 -0.000061 -0.002281 -0.000831
252 sLCB5 4.249471 20.370836 -2.166636 0.001755 -0.000548 -0.000831
253 sLCB5 4.249471 21.783337 -2.995497 0.002332 -0.000273 -0.000831
255 sLCB5 5.080354 21.61716 -0.002732 0.003022 -0.000002 -0.000831
256 sLCB5 3.003146 21.61716 -5.562439 0.000594 -0.000664 -0.000831
257 sLCB5 4.249471 21.61716 -2.969334 0.000496 -0.000319 -0.000831
258 sLCB5 1.259679 17.610171 -4.435604 0.001395 -0.000789 -0.001363
259 sLCB5 3.303999 17.610171 -2.194757 0.0015 -0.000541 -0.001363
260 sLCB5 1.259679 19.654491 -5.576526 0.001548 -0.000738 -0.001363
261 sLCB5 3.303999 19.654491 -2.995617 0.001722 -0.000467 -0.001363
262 sLCB5 0.385864 19.290687 -3.112536 -0.001234 -0.001554 -0.000831
263 sLCB5 -0.65274 19.290687 -1.306676 -0.001655 -0.000869 -0.000831
264 sLCB5 1.230084 12.686809 -0.734955 0.000261 -0.003179 -0.000476
265 sLCB5 0.801317 16.259867 -2.270869 0.000225 0.001772 -0.000476
266 sLCB5 0.801317 17.331784 0 -0.000059 0.001098 -0.000476
267 sLCB5 1.515928 13.401421 -4.617016 0.001313 -0.001639 -0.000476
268 sLCB5 0.181987 12.686809 -1.03969 -0.000321 -0.002465 -0.000476
269 sLCB5 0.181987 13.401421 -4.35615 -0.001497 -0.00192 -0.000476
270 sLCB5 0.801317 12.686809 -1.019129 0.000164 -0.003224 -0.000476
271 sLCB5 0.801317 15.330872 -6.689504 -0.000216 0.001458 -0.000476
272 sLCB5 0.610753 14.830644 -7.330396 -0.000861 -0.000201 -0.000476
273 sLCB5 0.086705 14.830644 -5.596848 -0.001972 0.000173 -0.000476
274 sLCB5 0.610753 13.401421 -5.425359 -0.000643 -0.000936 -0.000476
275 sLCB5 0.086705 13.401421 -4.01686 -0.00165 -0.001227 -0.000476
276 sLCB5 1.230084 13.401421 -5.303196 0.00077 -0.002896 -0.000476
277 sLCB5 0.086705 13.925469 -5.367651 -0.001206 -0.000817 -0.000476
278 sLCB5 1.515928 13.925469 -6.294112 0.000727 -0.001025 -0.000476
279 sLCB5 1.515928 14.830644 -6.677203 0.001403 0.000132 -0.000476
280 sLCB5 0.086705 14.306595 -5.788676 -0.0015 -0.000236 -0.000476
281 sLCB5 1.515928 14.306595 -6.823708 0.000738 -0.000337 -0.000476
282 sLCB5 1.515928 12.686809 -0.530334 0.000189 -0.003206 -0.000476

38
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Maximum displacement 10, 68 mm < allowable displacement 27mm