Вы находитесь на странице: 1из 4

SITE VISIT REPORT

NAME OF PROJECT:

CONSTRUCTION OF 3 STY - 12 CL SCHOOL BUILDING OF MAASIN CITY SPED CENTER (SCH. ID #


238003)

PROJECT LOCATION:

BRGY. MANTAHAN, MAASIN CITY, SOUTHERN LEYTE

PROJECT COST:

PHP 40,525,369.00

I. ACTIVITIES

 CLEANING THE SITE USING THE BACKHOE


 WELDING
 HAULING
 TILING
 CONCRETE MIXING
 SKIM COATING
 ELECTRICAL WORK (INSTALLATION OF ELECTRICAL WIRE)
 TILE WORKS
 PAINTING

II. WEATHER CONDITION

8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 NN


III. MATERIALS

MATERIALS UNIT QUANTITY REMARKS

STEEL PIPE FT 6 HANDRAILS

SKIM COAT KG 2 COVERING

PAINT LITERS 16

ELECTRICAL WIRES BAGS 6 WIRINGS

TILES CM 40 TILING

IV. MANPOWER

DESIGNATION No. of Personnel No. of Hours REMARKS

TIMEKEEPER 1 8 LOGBOOK OF TIME


HISTORY

STEEL MAN 6 8 CUTTING OF STEEL


PIPES

ELECTRICIAN 3 8 INSTALLATION OF
WIRINGS

SAFETY ENGINEER 1 8 OVERSEEING

LABORER 22 8 VARIOUS WORK

DUMPTRUCK DRIVER 2 8 DELIVERING WASTE

PAINTER 4 8 PAINTING WALLS

V. EQUIPMENTS
MACHINE SPEC QUANTITY No. of Hours REMARKS

GRINDER 1 8 CUTTER

STEEL CUTTER 3 8 CUTTING PIPES

DUMPTRUCK 3 CU.M & 4 CU.M 2 8 CLEARING

CEMENT MIXER 1 BAG 3 8 MIXING CEMENT

BACKHOE 2 8 EXCAVATING AND


CLEANING

WHEEL BARROW 1 8

VI. PROBLEMS ENCOUNTERED

 UNEVEN SURFACE
 DELAY OF CERTAIN MATERIALS
 NEED TO CREATE A CANAL DUE TO HIGHER CLEARANCE COMPARED TO THE CLASSROOMS
BESIDE

VII. DOCUMENTATION
PREPARED BY:

ED PHILIPPE V. GONZALES
STUDENT ENGINEER

APPROVED BY:

ENGR. LUZANNE BAKUNAWA


CE-28 INSTRUCTOR