425.00
4′ x 8′ x 4.50mm Fiber Cement (ceiling board) sht
410.00
4′ x 8′ x 9mm Gypsum Board (ceiling board) sht
0.70
Ficem Screw 20mm pc
Ceiling Vent:
65.00
1″x1″x10′ s4s Tanguile or its equivalent pc
65.00
1″x3″x8′ s4s Tanguile or its equivalent pc
140.00
Insect Sreen sht
36.50
0.2mm thk-20mm x 20mm x 2.44m Wall Angle pcs.
65.00
Rod suspension hanger w/adjustment spring set
3.03
Pre-formed wire clip set
0.70
Toks Srew pcs.
Concreting Works
Concrete
325.00
Soil Poisoning – Termicide Liter
1,010.00
Gravel cu.m
1,035.00
Wash Sand cu.m
260.00
Portland Cement, 40kg Bag
260.00
Pozzolan Cement, 40kg Bag
Steel Bars
156.00
10mm Diameter Deformed Bars pc
223.00
12mm Diameter Deformed Bars pc
394.00
16mm Diameter Deformed Bars pc
645.00
20mm Diameter Deformed Bars pc
16.00
#16 G.I. Tie Wire kg
Formworks
280.00
2 x 3 x 10′ Coco lumber pc
280.00
2 x 4 x 10 Coco lumber pc
660.00
1/2″ x 4′ x 8′ Plywood pc
209.00
6mm thk. Lawanit board pc
330.00
6mm thk. Ordinary Plywood pc
65.00
1″x2″x8′ Hard wood or its equivalent pc
65.00
2″x2″x8′ Hard wood or its equivalent pc
65.00
2″x2″x8’Hardwood or its equivalent pc
65.00
2″x24″x8′ Hard wood or its equivalent pc
Amount (php)
Description Unit
187.13
REBAR, Gr 40, 12mm dia x 6m pc
233.92
REBAR, Gr 40, 12mm dia x 7.5m pc
280.69
REBAR, Gr 40, 12mm dia x 9m pc
327.47
REBAR, Gr 40, 12mm dia x 10.5m pc
374.26
REBAR, Gr 40, 12mm dia x 12m pc
334.42
REBAR, Gr 60, 16mm dia x 6m pc
418.02
REBAR, Gr 60, 16mm dia x 7.5m pc
501.62
REBAR, Gr 60, 16mm dia x 9m pc
585.23
REBAR, Gr 60, 16mm dia x 10.5m pc
668.83
REBAR, Gr 60, 16mm x 12m pc
522.60
REBAR, Gr 60, 20mm dia x 6.0m pc
914.56
REBAR, Gr 60, 20mm dia x 10.5m pc
816.55
REBAR, Gr 60, 25mm dia x 6.0m pc
1,224.82
REBAR, Gr 60, 25mm x 9.0m pc
1,428.97
REBAR, Gr 60, 25mm dia x 10.5m pc
1,633.10
REBAR, Gr 60, 25mm dia x 12m pc
Amount (Php)
Description Unit
227.70
IMC PIPE 1/2″ (15mm) x 3M w/ COUPLING pc
294.19
IMC PIPE 3/4″ (20mm) x 3M w/ COUPLING pc
515.53
IMC PIPE 1″ (25mm) x 3M w/ COUPLING pc
613.88
IMC PIPE 1-1/4″ (32mm) x 3M w/ COUPLING pc
777.52
IMC PIPE 1-1/2″ (40mm) x 3M w/ COUPLING pc
992.70
IMC PIPE 2″ (50mm) x 3M w/ COUPLING pc
1,685.50
IMC PIPE 2-1/2″ (65mm) x 3M w/ COUPLING pc
2,060.26
IMC PIPE 3″ (80mm) x 3M w/ COUPLING pc
3,091.29
IMC PIPE 3-1/2″ (90mm) x 3M w/ COUPLING pc
3,583.05
IMC PIPE 4″ (100mm) x 3M w/ COUPLING pc
21.59
FMC ORDINARY 1/2″ (15mm) pc
1,841.44
FMC LT 4″ (100mm) pc
1,095.94
FMC LT 30″ (80mm) pc
924.46
FMC LT 2-1/2″ (65mm) pc
58.14
PVC CONDUIT 20MM (1/2″) x 3m pc
76.04
PVC CONDUIT 25MM (3/4″) x 3m pc
108.09
PVC CONDUIT 32MM (1″) x 3m pc
137.92
PVC CONDUIT 40MM (1-1/4″) x 3m pc
222.17
PVC CONDUIT 63MM (2″) x 3m pc
673.96
PVC CONDUIT 110MM (4″) x 3m pc
ELECTRICAL WORKS
85.00
20mmdia UPVC pipe pcs
216.00
20mmdia RSC conduit pcs
20.00
20mmdia RSC coupling pcs
5.00
20mmdia UPVC coupling pcs
7.50
20mmdia UPVC adoptor pcs
8.00
20mm dia. Locknut& bushing pcs
14.30
20mm dia. RSC Locknut& bushing pcs
Boxes and Gutter
40.00
Electrical tape big pcs.
90.00
Rubber tape big pcs.
240.00
Solvent cement 100cc pcs.
70.00
G.I. Wire No. 12 kls.
120.00
Concrete nail no.3 kls.
70.00
CWN no.3 kls.
35.00
Entrance cap pcs.
600.00
Terminal Lugs lot
429.00
Red Led Paint pcs.
1.00
Cable Tie pc
540.00
Secondary Rack pc
610.00
Black Paint gal
Wires
43.33
8.0mm2 THHN m
36.59
5.5mm2 THHN m
25.00
3.5mm2 THHN m
23.33
2.0mm2 THHN m
Wiring Devices
110.00
1-gang Switch, 10A, 240V set
140.00
2-gang switch, 10A, 240V set
240.00
2-gang 3 way switch, 10A, 240V set
Lighting Fixtures
285.00
24 Watts light bulb set
Branches
2-
15AT/50AF,1PCB,240V,10KAIC,,BO
315.70
LT-ON PC
3-
20AT/50AF,1PCB,240V,10KAIC,,BO
315.70
LT-ON PC
Amount
Qt Uni
(Php)
Description y t
51,750.0
0
Contractor’s Office 1 lot
51,750.0
0
Warehouse 1 lot
17,250.0
B. Cleaning and Disposal of
0
Garbage/Debris 1 lot
C. Premium for Insurance and Bonds (including Renewal Cost up to Project Completion)
21,968.6
Surety Bond (Equivalent to 10%
5
contract amount) 1 lot
43,937.2
Performance Bond (Equivalent to
9
10% contract amount) 1 lot
109,814.0
Guarantee Bond (Equivalent to 10%
6
contract amount) 1 lot
23,000.0
0
D. Water and Electric Consumption 1 lot
E. Demobilization (Clearing,
removal of temporary facilities,
17,250.0
Tools, Debris, Excess Materials,
0
etc.) 1 lot
88,895.0
Permits (Incl. Mayor’s City tax, &
0
Other Misc. Permit charges) 1 lot
34,500.0
Cable + Conduit (for WTB-Watch
0
Tower Board or Supervisory Panel 1 lot
952,315.0
0
Total
Amount (Php)
Description Qty Unit
17,503.00
Installation of Scaffolding 1 lot
26,254.50
Hoisting 1 lot
43,757.50
Template Setting 1 lot
26,254.50
Marking and Boring of Holes 1 lot
35,006.00
Bracket Setting 1 lot
43,757.50
Rail Setting 1 lot
52,509.00
Sill/Jamb Installation 1 lot
8,751.50
Floor Indicator/Call buttons 1 lot
17,503.00
Machine Room Piping 1 lot
43,757.50
Hoist-way Piping 1 lot
35,006.00
Landing Door Assembly 1 lot
61,260.50
Car Assembly 1 lot
21,878.75
Travelling Cable Lay-out 1 lot
21,878.75
CWT Assembly 1 lot
26,254.50
Lay-out of Ropes 1 lot
52,509.00
Initial Test 1 lot
26,254.50
Slow Speed test (Start up) 1 lot
13,127.25
Load Test 1 lot
13,127.25
Drop Test 1 lot
8,751.50
Buffer Test 1 lot
Plate Setting/Slow Switch
43,757.50
Installation 1 lot
17,503.00
Rubber Block Setting 1 lot
61,260.50
High Speed Testing 1 lot
Standard/Special Feature
26,254.50
Test 1 lot
17,503.00
Others 1 lot
875,150.00
Total
Rock 602.56
Equipment
QT Labor
Description Y Unit Material (Php) (Php)
Cementitiou
s and Reactive SQ. 690.0 200.0
Waterproofing 1 M. 0 0
Supply,
Delivery and
Installation of
Granite (150mm x SQ. 3,450.0 1,800.0
150mm) 1 M. 0 0
Supply,
Delivery and
Installation of
Granite (300mm x SQ. 4,300.0 1,800.0
600mm) 1 M. 0 0
Supply,
Delivery and
Installation of #10
Crushed Granite SQ. 3,290.0 350.0
(Washout) 1 M. 0 0
Supply,
Delivery and
Installation of
Homogeneous Tiles SQ. 1,515.0 350.0
(600mm x 600mm) 1 M. 0 0
Supply,
Delivery and
Installation of
Homogeneous Tiles SQ. 1,525.0 350.0
(300mm x 300mm) 1 M. 0 0
Supply,
Delivery and
Installation of
150mm Wide SQ. 1,950.0 300.0
Stampcrete 1 M. 0 0
Supply,
Delivery and
Installation of SQ. 1,950.0 300.0
Stampcrete 1 M. 0 0
Lighting Accessories
Supply,
Delivery and
Installation of
Recessed Steplight
(15W Die Cast
Aluminum with 6,900.0 3,800.0
Front Panels) 1 pc 0 0
Earthmoving Equipment
Bulldozer 3,379.00
Payloader 1,733.00
Compaction Equipment
Lifting Equipment
Excavating Equipment
Backhoe 1,537.00
Foundation Equipment
Concreting Equipment
Hauling Equipment
Air Equipment
Jackhammer 150.00
Pumping Equipment
Pumpcrete 2,076.00
Shop Equipment
Chainsaw 75.36
Miscellaneous Equipment
Others
Masonry Works
Stone Masonry
Centralizer pc 230.00
Truss Works
6mm thk.x 65mm x 65mm x 6.0 Angle bar(T & B Chord) pc 2,248.70
6mm thk. x 50mm x 50mm x 6.0 Angle bar(Web Member) pc 1,704.66
255mm x 90mm x 25mm x 5mm thk. LC- Channel beam pcs. 4,057.57
300mmx12mm dia. Plain Bar w/ standard nuts & washers @ both ends:
Sagrod pcs. 74.12
350mmx12mm dia. Plain Bar w/ standard nuts & washers @ both ends:
Sagrod pcs. 76.74
380mmx12mm dia. Plain Bar w/ standard nuts & washers @ both ends:
Sagrod pcs. 78.31
465mmx12mm dia. Plain Bar w/ standard nuts & washers @ both ends:
Sagrod pcs. 82.76
550mmx12mm dia. Plain Bar w/ standard nuts & washers @ both ends:
Sagrod pcs. 87.22
REFERENCE: