Azbil Corporation
Building Systems Company
Construction Cost
Energy Cost
Corporate Social Maintenance
Responsibility Cost
Obligation of
Environment Preservation Misc.
Operation
Cost
Reference : Actual Data of PIM-2 from May 2016 to April 2017 (1 Year)
LED Lighting
High Efficiency Chiller & Control
Shared Tenant rental area
28.0
area ℃
Saving Cost
8. AHU VSD
2 LED Lighting System 0.03 3.6 PBP
2. LED with MS
with Motion Sensor 2.0 years
3 Chiller Primary Pump VSD 0.61 3.1 6. 2nd Pump VSD
System Control
4 Introduction of High 6.36 6.0
PBP
Efficiency Chillers
3.0 years
5 Condensing Pump VSD 1.00 3.3
Control Budget line
Investment Cost
6 Secondary Pump VSD 1.50 2.7
Control 7. CT VSD ※PBP: Pay Back Period
(ROI)
5. Cond Pump VSD
7 Cooling Tower Fan 0.42 3.4
VSD Control 3. Prim Pump VSD
8 AHU System AHU VSD Control 2.72 1.7
“Total solution” should be needed
9 Management Introduction of BEMS 4.53 1.0
System for proper investment.
Total 17.6 3.4
© 2016 Azbil Corporation. All rights reserved. 7
What is BEMS?
BEMS => Achieve Maximum Merit
Maximum
Merit
Menu
E
Total Solution
Menu
Energy Saving D
+
BEMS
Menu Menu Menu
A B C
- Saving guaranteed
- Comprehensive service
Package all services in turnkey contract
ESCO Expense
Interest
Capital Client’s
Investment Gain
Client Client
Performance Performance
Financing Contract Contract
Financing
Financial Financial
ESCO ESCO
Institution Institution Reimbursement
Initial 1st 2nd 3rd … Nth Initial 1st 2nd 3rd … Nth
Year Year Year Year Year Year Year Year Year Year
Contract Period Contract Period
Since amount of energy saving is guaranteed, Energy saving can be executed with no investment.
energy saving is assured.
Equipment is outsourced and belongs to leasing company.
Since initial investment is raised by the Client, Customer
equipment belongs to customer as an asset. Benefits Since ESCO raises funds, the Client has no risk for finance.
•Improve
Operations
・Set Goals •Optimize the
・Plan Measures Performance
•Confirm the
・Review and Result and
Add Measures Progress
・Control Data
・Room condition Data
・Data Analysis and reporting
BSC/Service HQ
VPN
Report
M&V Report
Indonesia
Report
Service Engineer
© 2016 Azbil Corporation. All rights reserved. 13
Go Forward with ESCO?
BEMS + ESCO = Achieve Maximum Merit
Maximum
Measure Merit
Measure
Total Solution D
E
ESCO
+
BEMS Energy Saving
Measure Measure Measure should
A B C continue!
Measure
C
Measure
B Serious
Issue Actually・・・
Occur Operational Fault
Measure
A
Decrease in Efficiency by
lack of Maintenance
© 2016 Azbil Corporation. All rights reserved. 14
Go Forward with ESCO?
Built a Win-Win Relationship with ESCO
Report
10 70
Win-Win
9
60
8
7 50
熱量[G J /h]
温 度 [℃ ]
6 40
5
4 30
Meeting to discuss
3 20
2
10
1
0 0
室内温度制御(冷水弁・温水弁開度)推移
00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00
温度 [℃]
24 負荷熱量 40
23 30
22 20
21 10
20 0
00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00
Analysis
Partnership with