MW-CL -48
Project: NH:37 Contract package – EW – II (AS-02/AS-18) Rev. 0
Date
Received
Checklist for: Material & Batching Plant (R.C.C. works)
Ref. RFI.
No.:
Location: Other Information:
CON CON SC
Item Description Remarks
Yes No Y N
148
A) Cement
1. Is the cement lot approved and certified by
the laboratory for use?
2. Is Manufacturer’s test certificate conforms to
required specification?
149