Вы находитесь на странице: 1из 17

P-4915 P-4906

MH-1095
FRL :24.49 m
P-4916
L -24.48 m
B-0.90 x 1.05 m
MH-2129
FRL :24.49 m
L -20.00 m
B-0.90 x 0.60 m
MH-2128
FRL :24.55 m
P-4914
L -20.00 m
B-0.75 x 0.45 m
MH-4519
FRL :24.60 m
P-4913
L -20.00 m
B-0.75 x 0.45 m
MH-1930
FRL :24.66 m
P-4912
L -20.00 m
B-0.75 x 0.45 m
MH-1929
FRL :24.72 m
P-4911
L -20.00 m
B-0.75 x 0.45 m
MH-4389
FRL :24.77 m
P-4910
L -20.00 m
B-0.75 x 0.45 m
MH-664
P-4909
L -20.00 m
FRL :24.83 m B-0.60 x 0.45 m
MH-663
FRL:24.89 m
P-4908
L -20.00 m
B-0.45 x 0.45 m
MH-3451
FRL :24.94 m
P-4907
L -20.00 m
B-0.45 x 0.45 m
MH-3450
FRL :25.00 m
L -20.00 m
B-0.45 x 0.45 m
MH-5813
FRL :25.06 m
P-1506
L -17.10 m MH-5626
B-0.45 x 0.45 m FRL :25.11 m
N
IL :22.20 m 163 1/S IL :22.35 m 250 1/S IL :22.88 m 286 1/S IL :22.95 m 333 1/S IL :23.01 m 500 1/S IL:23.05 500 1/S IL :23.09 m 400 1/S IL :23.14 m 95 1/S IL :23.35 m 222 1/S IL :23.44 m 333 1/S IL :23.50 m 333 1/S IL :23.56 m 342 1/S IL :23.61 m
PALA VAGU KR
E1 IS
HN
A
E2 RI
CPL-3 CPL-12 CPL-13 VE
CPL-1 CPL-2 CPL-4 CPL-5 CPL-6 CPL-7 CPL-8 CPL-9 CPL-10 CPL-11 R
P-1507 634 564 143 E3
L -17.10 m

100

110

120

130

140

150

160

170

180

190

200

210

220

230

240
E4
CPR-5

10

20

30

40

50

60

70

80

90
B-0.90 x 1.05 m CPR-1 CPR-2 CPR-3 CPR-4 CPR-6 CPR-7 CPR-8 CPR-9 CPR-10 CPR-11

0
630 560 E5
855 1/S
E6
MH-1096 P-4903 P-4901 P-4896
P-4905 MH-5003 P-4904 MH-2680 P-4900 MH-1469 P-4898 P-4897 P-1509 MH-5999

GUNTUR VIJAYAWADA
MH-4622 MH-2681 P-4902 MH-4838 MH-1470 P-4899 MH-4123 0 MH-156 MH-155 E7
FRL :24.47 m L -20.00 m L -20.00 m L -24.80 m
FRL :24.45 m L -40.58 m FRL :24.56 m L -20.00 m FRL :24.62 m FRL :24.57m L -20.00 m FRL :24.73 m FRL :24.79 m L -20.00 m FRL :24.85 m L -20.00 m FRL :24.90 m L -20.00 m FRL :24.96 m L -20.00 m FRL :25.02 m L -22.60 m FRL :25.14 m
IL :22.18 m B-0.45 x 0.45 m E8
CPL-268 IL :22.84 m B-0.60 x 0.45 m IL :23.11 m B-0.60 x 0.45 m IL :23.17 m B-0.60 x 0.45 m IL:23.22 B-0.60 x 0.45 m IL :23.25 m B-0.60 x 0.45 m IL :23.30 m B-0.45 x 0.45 m IL :23.35 m B-0.45 x 0.45 m IL :23.41 m B-0.45 x 0.45 m IL :23.49 m B-0.45 x 0.45 m IL :23.58 m B-0.45 x 0.45 m IL :23.64 m
400 1/S 400 1/S 354 1/S
150 1/S 333 1/S 667 1/S 400 1/S 333 1/S 250 1/S 222 1/S 377 1/S 140 E9
620 550 IL :23.68 m
E10

N12
PLAN FROM CH:0 M TO CH:240 M E11
ZONE 1

N18

N17
N16

N15
N14
N13
SM-C69(15.60 M) E12

E13
SECTOR -03 E14

MH-3450 MH-5813 MH-5626 E15


MH-664 MH-663 MH-3451
MH-1929 MH-4389 FRL: 25.00 m FRL: 25.06 m FRL: 25.11 m E16
MH-2128 MH-4519 MH-1930 FRL: 24.89 m FRL: 24.94 m
MH-1095 MH-2129 FRL: 24.72 m FRL: 24.77 m FRL: 24.83 m Invert: 23.56 m Invert: 23.61 m
FRL: 24.60 m FRL: 24.66 m Invert: 23.35 m Invert: 23.44 m Invert: 23.50 m
26 FRL: 24.49 m FRL: 24.49 m FRL: 24.55 m Invert: 23.09 m Invert: 23.14 m
Invert: 22.95 m Invert: 23.01 m Invert: 23.05 m
Invert: 22.20 m Invert: 22.35 m Invert: 22.88 m FRL KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

FRL GROUND LEVEL


25
GROUND LEVEL
CROWN
CROWN
24
P-4896
IL-23.61
23 INVERT

22 P-1507
IL-22.20 INVERT
V=1:200

21
Power(HDPE) Power(HDPE) Power(HDPE)
H=1:1000 IL : 20.00 IL : 20.00 IL : 20.00
Size:850x1230mm Size:850x1230mm Size:850x1230mm
Datum:20

Depth of Invert 2.29 2.14 1.67 1.65 1.65 1.67 1.68 1.69 1.54 1.50 1.50 1.50 1.50

Ground Level 23.80 23.96 23.93 23.92 23.96 24.005 24.008 24.25 24.31 24.26 24.37 24.44 24.50

Length (Unified) (m) 24.48 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 17.10

FRL (m) 24.49 24.49 24.55 24.60 24.66 24.72 24.77 24.83 24.89 24.94 25.00 25.06 25.11 SM-C69
Pipe IL (m) 22.20 22.35 22.80 22.88 22.95 23.01 23.05 23.09 23.14 23.35 23.44 23.50 23.56 23.61
KEY PLAN OF SECTOR-3
Crown (m) 23.25 23.40 23.48 23.33 23.40 23.46 23.50 23.54 23.59 23.80 23.89 23.95 24.01 24.06
LEGEND:
Manhole No. MH-1095 MH-2129 MH-2128 MH-4519 MH-1930 MH-1929 MH-4389 MH-664 MH-663 MH-3451 MH-3450 MH-5813 MH-5626
STORM DRAIN WITH FLOW DIRECTION
Slope (Calculated) (1/S) 163 250 286 333 500 500 400 95 222 333 333 342
P-136 STORM DRAIN NUMBER
Span x Rise(m) 0.90 X 1.05 0.90 X 0.60 0.75 X 0.45 0.75 X 0.45 0.75 X 0.45 0.75 X 0.45 0.75 X 0.45 0.60 X 0.45 0.45 X 0.45 0.45X 0.45 0.45 X 0.45 0.45 X 0.45 L-30 STORM DRAIN LENGTH
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
Pipe no: (Label) P-4916 P-4915 P-4914 P-4913 P-4912 P-4911 P-4910 P-4909 P-4908 P-4907 P-4906 P-1506
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Chainage (m) -5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240
STORM MAN HOLE

LONGITUDINAL SECTION (LHS) FROM CH:0 M TO CH:240 M


CATCH PIT

MH-155 MH-5999
MH-1469 MH-4123 MH-156
MH-4838 MH-1470 FRL: 25.02 m FRL: 25.14 m
MH-5003 MH-2681 MH-2680 FRL: 24.85 m FRL: 24.90 m FRL: 24.96 m Invert: 23.64 m UTILITES
MH-4622 FRL: 24.73 m FRL: 24.79 m Invert: 23.58 m
FRL: 24.56 m FRL: 24.62 m FRL: 24.57 m Invert: 23.35 m Invert: 23.41 m Invert: 23.49 m
26 FRL: 24.45 m Invert: 23.25 m Invert: 23.30 m STORM WATER
Invert: 23.11 m Invert: 23.17 m Invert: 23.22 m FRL
Invert: 22.84 m
FRL GROUND LEVEL POWER CONDUIT
25 GROUND LEVEL POTABLE WATER
CROWN
REUSE WATER
CROWN SEWER NETWORK
24
P-4890
IL-23.64 LIST OF VILLAGES IN ZONE-1
23 INVERT
P-1508 TYPE OF ROAD
IL-22.84 INVERT 1.NEKKALLU - NE
22 A- 25.00m ROW
2.SHAKAMURU - SM
V=1:200

B- 17.00m ROW
21 C- 15.60m ROW
Power(HDPE) Power(HDPE) Power(HDPE)
SM C 91
H=1:1000 IL : 20.00 IL : 20.00 IL : 20.00 D- 12.00m ROW
ROAD NUMBER
Size:850x1230mm Size:850x1230mm Size:850x1230mm
Datum:20 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)

Depth of Invert 1.61 1.45 1.45 1.35 1.48 1.49 1.50 1.49 1.47 1.44 1.50 NOTES:

Ground Level 23.86 23.92 23.92 24.00 24.06 24.09 24.29 24.25 24.32 24.40 24.46 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Length (Unified) (m) 40.58 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 22.60

FRL (m) 24.45 24.56 24.62 24.57 24.73 24.79 24.85 24.90 24.96 25.02 25.14

Pipe IL (m) 22.84 23.11 23.17 23.22 23.25 23.30 23.35 23.41 23.49 23.58 23.64

Crown (m) 23.29 23.56 23.62 23.67 23.70 23.75 23.80 23.86 23.94 24.03 24.09

Manhole No. MH-4622 MH-5003 MH-2681 MH-2680 MH-4838 MH-1470 MH-1469 MH-4123 MH-156 MH-155 MH-5999

Slope (Calculated) (1/S) 150 333 400 667 400 400 333 250 222 377

Span x Rise(m) 0.60 X 0.45 0.60 X 0.45 0.60 X0.45 0.60 X 0.45 0.60 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-4905 P-4904 P-4903 P-4902 P-4901 P-4900 P-4899 P-4898 P-4897 P-1509

Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

LONGITUDINAL SECTION (RHS) FROM CH:5 M TO CH:230 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 4
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 24 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
L -13.45 m
P-5844
P-4939 P-4938 P-4936 P-4935 P-4934 P-1284 P-4932 MH-400 P-4931 P-1291 P-1290
MH-2156
IL :21.42 m
MH-2361 MH-2360 MH-5205 MH-2155 MH-4826 P-1285 MH-5679
FRL :24.50 m
MH-1160
L -26.84 m
B-0.90 x 1.35 m
895 1/S
IL :21.77 m
L -20.00 m
FRL :24.58 m B-0.90 x 1.35 m
667 1/S
FRL :24.64 m
IL :21.80 m
FRL :24.70 m
IL :21.820m
L -20.00 m
B-0.90 x 1.35 m
1,000 1/S
FRL :24.76 m
IL :21.84 m
L -20.00 m
B-0.90 x 1.35 m
1,000 1/S
FRL:24.82
IL :21.86 m
L -20.00 m
B-0.90 x 1.35 m
1,000 1/S
FRL :24.88 m
IL :21.88 m
L -22.60 m
B-0.90 x 1.35 m
226 1/S
L -9.20 m
B-0.90 x 1.20 m
307 1/S
MH-401
FRL :24.95 m
IL :22.16 m
L -36.03 m
B-0.90 x 1.20 m
1,801 1/S
FRL :25.08 m
IL :22.18 m
L -20.00 m
B-0.90 x 1.20 m
2,000 1/S
FRL :25.14 m
IL :22.19 m
L -22.82 m
B-0.90 x 1.05 m
2,282 1/S
L -10.05 m
B-0.90 x 0.75 m
335
4101/S
N
PALA VAGU KR
E1 IS
CPL-14 P-4937 CPL-15 CPL-16 CPL-17 CPL-19 CPL-20 CPL-21 MH-4825 CPL-22 CPL-23 CPL-24 CPL-25 MH-3319 MH-3318 HN
B-1.50 x 1.35 m CPL-18 A
L -20.00 m FRL :24.95 m FRL :25.20 m FRL :25.20 m E2 RI

100

110

120

130

140

150

160

170

180

190

200

210

220

230

240

250

260
L -10.05 m 452 VE

20

30

40

50

60

70

80

90
B-0.90 x 1.35 m IL :21.98 m IL :22.20 m IL :22.53 m E3
R
1,000 1/S CPR-16 CPR-18 CPR-22
CPR-13 CPR-14 CPR-15 CPR-17 CPR-19 CPR-20 CPR-21 400
CPR-12 470 E4

E5
P-5942 MH-4246 P-5943 P-5949
P-4940 MH-5734 P-1278 P-1279 MH-2974 P-5838 MH-5580 P-4933 MH-5911 P-5944 MH-2867 P-4930 MH-1446 P-5950 MH-6110 L -10.05 m MH-3947 E6
IL :21.74 m L -22.60 m FRL :24.98 m L -9.20 m MH-476
L -32.42 m FRL :24.60 m L -29.25 m L -9.20 m FRL :24.68 m L -35.98 m FRL :24.82 m L -20.00 m FRL :24.88 m B-0.90 x 1.20 m L -36.03 m FRL :25.08 m L -20.00 m FRL :25.14 m L -22.82 m FRL :25.23 m B-0.90 x 0.90 m FRL :25.23 m

GUNTUR VIJAYAWADA
B-0.90 x 1.05 m FRL :24.98 m E7
FRL :24.50 m
B-0.90 x 1.50 m IL :22.13 m B-0.90 x 1.50 m B-0.90 x 1.35 m IL :22.44 m B-0.90 x 1.35 m IL :22.49 m B-0.90 x 1.35 m IL :22.76 m B-0.90 x 0.90 m IL :23.20 m B-0.90 x 0.90 m IL :23.26 m B-0.90 x 0.90 m IL :23.33 m 201 1/S IL :23.38 m
440 IL :22.53 m 452 1/S 230 1/S
MH-488 307 1/S IL :22.95 m E8
203 1/S 488 1/S 720 1/S 500 1/S 460 360 1/S 333 1/S 326 1/S 390
E9

PLAN FROM CH:0 M TO CH:260 M E10

N12
E11
SM-B18(17.00 M) ZONE 1

N18

N17
N16

N15
N14
N13
E12

E13
SECTOR -03 E14
MH-3319
MH-400 MH-5679 FRL: 25.20 m
E15
MH-4826 MH-4825 MH-401 FRL: 25.14 m
MH-5205 MH-2156 MH-2155 FRL: 25.08 m Invert: 22.20 m E16
MH-2361 MH-2360 FRL: 24.88 m FRL: 24.95 m FRL: 24.95 m Invert: 22.19 m
MH-1160 FRL: 24.70 m FRL: 24.76 m FRL: 24.82 m Invert: 22.18 m
FRL: 24.58 m FRL: 24.64 m Invert: 21.88 m Invert: 21.98 m Invert: 22.16 m
26 FRL: 24.50 m Invert: 21.82 m Invert: 21.84 m Invert: 21.86 m
Invert: 21.77 m Invert: 21.80 m
Invert: 21.42 m KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

FRL
25

GROUND LEVEL
24
CROWN

23
P-5844
P-4922
IL-22.80
IL-22.62
22
P-4929
Sewer(DWC-HDPE)
V=1:200

IL-21.98 IL:21.97
P-1458,P-1459
INVERT Sewer(DWC-HDPE) Size:200mm
21 IL-21.42 Power(HDPE)
IL:21.06 IL:20.00
Size:200mm Sewer(DWC-HDPE)
H=1:1000 Size:850x1720mm IL:20.00
Size:200mm
Datum:20

Depth of Invert 3.08 2.81 2.84 2.88 2.92 2.96 3.00 2.97 2.79 2.90 2.95 3.00

Ground Level 23.13 24.75 24.82 24.74 24.51 24.36 24.32 24.30 24.29 24.41 24.53 24.66

Length (Unified) (m) 26.84 20.00 20.00 20.00 20.00 20.00 22.60 9.20 36.03 20.00 22.82 10.05 SM-B18
FRL (m) 24.50 24.58 24.64 24.07 24.76 24.82 24.88 24.95 24.95 25.08 25.14 25.20

Pipe IL (m) 21.74 21.77 21.80 21.82 21.84 21.86 21.88 21.98 22.13 22.16 22.18 22.19 22.20 22.50

Crown (m) 23.09 23.12 23.15 23.17 23.19 23.21 23.23 23.33 23.38 23.24 23.25
23.36
KEY PLAN OF SECTOR-3
Manhole No. MH-1160 MH-2361 MH-2360 MH-2156 MH-2155 MH-4826 MH-4825 MH-401 MH-400 MH-5679 MH-3319
MH-5205
LEGEND:
Slope (1/S) 896 667 1000 1000 1000 1000 226 307 1801 2000 2282 335
STORM DRAIN WITH FLOW DIRECTION
Span X Rise 0.90X1.35 0.90X1.35 0.90X1.35 0.90X1.35 0.90X1.35 0.90X1.35 0.90X1.35 0.90X1.20 0.90X1.20 0.90X1.20 0.90X1.05 0.90X0.75

RCC
P-136 STORM DRAIN NUMBER
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC
L-30 STORM DRAIN LENGTH
Pipe no: (Label) P-4939 P-4938 P-4937 P-4936 P-4935 P-4934 P-1284 P-4932 P-4931 P-1291 P-1290
P-1285 B-0.60x0.60 STORM DRAIN SPAN x RISE
Chainage (m) 17 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 S-150 STORM DRAIN SLOPE
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
LONGITUDINAL SECTION (LHS) FROM CH:17 M TO CH:260 M STORM MAN HOLE
MH-1446 MH-6110
MH-4246 MH-476 MH-2867
MH-5580 MH-5911 FRL: 25.14 m FRL: 25.23 m
MH-5051 MH-2974 FRL: 24.98 m FRL: 24.98 m FRL: 25.08 m
MH-488 MH-5734 FRL: 24.82 m FRL: 24.88 m Invert: 23.26 m Invert: 23.33 m CATCH PIT
FRL: 24.75 m FRL: 24.68 m Invert: 22.76 m Invert: 22.95 m Invert: 23.20 m
26 FRL: 24.50 m FRL: 24.60 m Invert: 22.49 m Invert: 22.53 m
Invert: 22.19 m Invert: 22.44 m
Invert: 21.74 m Invert: 22.13 m
FRL
UTILITES
25
GROUND LEVEL STORM WATER
CROWN POWER CONDUIT
24
P-5951 POTABLE WATER
P-5941 IL-23.78 REUSE WATER
23 P-4789 IL-23.51
P-4851 SEWER NETWORK
IL-23.05 IL-23.55 Sewer(DWC-HDPE)
IL:22.73
22 P-4765 Size:200mm LIST OF VILLAGES IN ZONE-1
IL-22.19
INVERT Power(HDPE)
P-688 & P-1458 IL:20.50 TYPE OF ROAD
21 IL-21.74 Size:850x1720mm 1.NEKKALLU - NE
V=1:200

A- 25.00m ROW
Sewer(DWC-HDPE) 2.SHAKAMURU - SM
20 IL:20.22 B- 17.00m ROW
Size:400mm Sewer(DWC-HDPE)
H=1:1000 C- 15.60m ROW
IL:19.98 SM C 91
Size:200mm D- 12.00m ROW
Datum:19 ROAD NUMBER
Depth of Invert 2.76 2.47 2.56 2.24 2.33 2.35 2.22 2.03 1.88 1.88 1.91 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
24.66
Ground Level 23.12 0 24.78 24.77 24.69 24.36 24.32 24.30 24.29 24.41 24.53

29.25 22.82 10.05


NOTES:
Length (Unified) (m) 32.42 9.20 35.98 20.00 22.60 9.20 36.03 20.00

24.60 24.75 24.68 24.82 24.88 24.98 24.98 25.14 25.23 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
FRL (m) 24.50 25.08
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Pipe IL (m) 21.97 22.13 22.19 22.41 22.44 22.49 22.53 22.71 22.76 22.91 22.95 23.10 23.20 23.26 23.33 23.38

Crown (m) 23.47 23.63 23.76 23.79 23.84 23.91 23.96 24.00 24.10 24.16 24.08

Manhole No. MH-488 MH-5734 MH-2974 MH-5580 MH-5911 MH-4246 MH-476 MH-2867 MH-1446 MH-6110
MH-5051

Slope (1/S) 203 488 307 720 500 452 230 360 333 326 201

Span X Rise 0.90x1.50 0.90x1.50 0.90x1.35 0.90x1.35 0.90x1.35 0.90x1.20 0.90x1.05 0.90x0.90 0.90x0.90 0.90x0.90 0.90x0.90

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC
Pipe no: (Label) P-4940 P-1278 P-1279 P-5838 P-4933 P-5942 P-5944 P-4930 P-5950 P-5949
P-5943
Chainage (m) 17 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260

LONGITUDINAL SECTION (RHS) FROM CH:17 TO CH:260 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 5
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 25 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
673 1/S MH-4506
B-0.60 x 0.45 m

N
L -13.45 m
220 220 B-0.90 x 1.20 m
P-5850
MH-407
P-4884 P-1288 P-1287 MH-3125 P-4872 MH-2803 P-4871 MH-2802 P-4870 P-4869 P-1288 P-4860 MH-3588 P-517 MH-6182
P-4885 L -20.00 m MH-406 L -22.60 m MH-2656 MH-4905 MH-4904 P-1289 MH-837 L -20.00 m
L -20.00 m MH-5191
L -26.08 m FRL :25.31 m B-0.90 x 0.75 m FRL :25.37 m B-0.90 x 0.75 m FRL :25.39 m
L -9.20 m FRL :25.50 m L -24.20 m FRL :25.53 m L -20.00 m FRL :25.59 m L -20.00 m FRL :25.65 m FRL :25.71 m L -22.82 m L -10.05 m FRL :25.75 m L -24.60 m FRL :25.88 m L -20.00 m FRL :25.94 m
B-0.90 x 0.75 m B-0.75 x 0.45 m B-0.75 x 0.45 m FRL :25.78 m
B-0.90 x 0.75 m IL :22.58 m 1,000 1/S IL :22.60 m 2,260 1/S IL :22.61 m 119 1/S
IL :22.69 m B-0.75 x 0.45 m IL :22.80 m B-0.75 x 0.45 m IL :22.90 m B-0.75 x 0.45 m IL :23.01 m IL :23.11 m B-0.45 x 0.45 m
IL :23.30 m B-0.45 x 0.45 m IL :24.41 m B-0.45 x 0.45 m IL :24.52 m PALA VAGU
190 1/S 217 1/S IL :23.22 m 123 1/S 182 1/S KR
522 1/S 216 1/S 192 1/S 190 1/S 224 1/S E1 IS
HN
A
E2 RI
210 210 VE
MH-3318 CPL-26 CPL-27 CPL-28 CPL-29 CPL-30 CPL-31 CPL-32 CPL-33 CPL-34 CPL-36 CPL-37 CPL-38 R
CPL-35 E3
FRL :25.20 m

270

280

290

300

310

320

330

340

350

360

370

380

390

400

410

420

430

440

450

460

470

480

490

500

504
IL :22.53 m E4
CPR-23 CPR-24 CPR-25 CPR-26 CPR-27 CPR-28 CPR-29 CPR-30 CPR-31 CPR-32 CPR-33 CPR-34 CPR-35 E5

E6

GUNTUR VIJAYAWADA
MH-3947 P-1282 MH-3832 200 P-4868 MH-1578 P-4867 MH-5158 P-4866 MH-2081 P-4865 P-1283 MH-130 FRL 200 P-4859 MH-5791 P-516 MH-5790 E7
P-5942 MH-3946 P-4873 MH-3833 P-1281 MH-1579 MH-2080 P-1282 MH-129
L -20.00 m L -22.82 m :25.78 m IL L -20.00 m
FRL :25.74 m L -24.48 m
L -22.60 m
B-0.90 x 0.90 m FRL :25.23 m L -26.08 m FRL :25.31 m L -20.00 m FRL :25.37 m
B-0.90 x 0.75 m
FRL :25.48 m L -9.20 m FRL :25.49 m L -24.20 m FRL :25.53 m L -20.00 m FRL :25.59 m FRL :25.65 m L -20.00 m FRL :25.71 m L -10.05 m FRL :25.88 m FRL :25.94 m E8
IL :23.38 m B-0.90 x 0.75 m B-0.90 x 0.75 m B-0.75 x 0.45 m B-0.60 x 0.45 m :24.41 m B-0.45 x 0.45 m
373 1/S
IL :23.61 m
333 1/S
IL :23.67 m 452 1/S
IL :23.72 m B-0.75 x 0.75 m IL:23.76m B-0.75 x 0.60 m IL :24.04 m B-0.75 x 0.45 m IL :24.24 m IL :24.29 m B-0.60 x 0.45 m IL :24.34 m B-0.60 x 0.45 m IL :24.43 m B-0.45 x 0.45 m IL :24.48 m
286 1/S
IL :24.55 m
E9
230 1/S 484 1/S 400 1/S 400 1/S 400 1/S 326 1/S 503 1/S 490 1/S
B-0.90 x 1.20 m

PLAN FROM CH:270 M TO CH:503 M E10

N12
E11
SM-B18(17.00 M) ZONE 1

N18

N17
N16

N15
N14
N13
E12

E13
MH-3588 MH-6182 SECTOR -03 E14
MH-4905 MH-4904 MH-5191 MH-837
MH-3125 MH-2803 MH-2802 FRL: 25.88 m FRL: 25.94 m
MH-406 MH-2656 FRL: 25.65 m FRL: 25.71 m FRL: 25.78 m FRL: 25.75 m E15
MH-3318 MH-407 FRL: 25.53 m FRL: 25.59 m Invert: 24.41 m Invert: 24.52 m
FRL: 25.37 m FRL: 25.39 m FRL: 25.50 m Invert: 23.11 m Invert: 23.22 m Invert: 23.30 m
FRL: 25.31 m Invert: 22.80 m Invert: 22.90 m Invert: 23.01 m E16
FRL: 25.20 m Invert: 22.61 m Invert: 22.69 m
Invert: 22.58 m Invert: 22.60 m
Invert: 22.53 m
FRL
26 KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1
GROUND LEVEL

25
Sewer(DWC-HDPE)
IL:23.94
CROWN Size:200mm
24

P-4862
23 P-4883 P-4878 P-4864 IL-23.30
P-5850 IL-23.84
IL-23.03 IL-22.99
IL-22.83 Power(HDPE)
INVERT IL:21.38
22 Size:850x1720mm
V=1:200

21

H=1:1000
Datum:20

Depth of Invert 2.67 2.73 2.77 2.78 2.81 2.73 2.69 2.64 2.60 2.56 2.45 1.47 1.42

Ground Level 24.68 24.80 24.76 24.78 24.82 25.00 25.14 25.14 25.14 25.20 25.25 25.33 25.85
SM-B18
Length (Unified) (m) 26.08 20.00 22.60 9.20 24.20 20.00 20.00 20.00 22.82 10.05 24.60 20.00

FRL (m) 25.94


25.20 25.31 25.37 25.39 25.20 25.53 25.59 25.65 25.71 25.78 25.75 25.88

Pipe IL (m) 22.53 22.58 22.60 22.61 22.69 22.80 22.90 23.01 23.11 23.22 23.30 24.30 24.41 24.52

Crown (m) 23.28 23.33 23.35 23.39 23.14 23.25 23.35 23.46 23.56 23.67 24.75 24.86 24.97 KEY PLAN OF SECTOR-3
Manhole No. MH-3318 MH-407 MH-406 MH-2656 MH-3125 MH-2803 MH-2802 MH-4905 MH-4904 MH-5191 MH-837 MH-3588 MH-6182
LEGEND:
Slope (1/S) 522 1000 2260 119 216 192 190 190 217 123 224 182
STORM DRAIN WITH FLOW DIRECTION
Span X Rise 0.90X0.75 0.90X0.75 0.90X0.75 0.90X0.75 0.75X0.45 0.75X0.45 0.75X045 0.75X0.45 0.75X0.45 0.45X0.45 0.45X0.45 0.45X0.45
P-136 STORM DRAIN NUMBER
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC L-30 STORM DRAIN LENGTH
Pipe no: (Label) P-4885 P-4884 P-1286 P-1287 P-4872 P-4871 P-4870 P-4869 P-1288 P-1289 P-4860 P-517 B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
Chainage (m) 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 503.500
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
LONGITUDINAL SECTION (LHS) FROM CH:270 M TO CH:503 M STORM MAN HOLE

MH-5791 MH-5790
MH-2081 MH-2080 MH-130 MH-129
MH-1578 MH-5158 FRL: 25.88 m FRL: 25.94 m CATCH PIT
MH-3833 MH-3832 MH-1579 FRL: 25.71 m FRL: 25.78 m FRL: 25.74 m
MH-3947 MH-3946 FRL: 25.53 m FRL: 25.59 m FRL: 25.65 m Invert: 24.48 m Invert: 24.55 m
FRL: 25.37 m FRL: 25.48 m FRL: 25.49 m Invert: 24.34 m Invert: 24.41 m Invert: 24.43 m
FRL: 25.23 m FRL: 25.31 m Invert: 24.04 m Invert: 24.24 m Invert: 24.29 m
Invert: 23.67 m Invert: 23.72 m Invert: 23.76 m
Invert: 23.38 m Invert: 23.61 m
FRL UTILITES
26
GROUND LEVEL STORM WATER
CROWN POWER CONDUIT
25
POTABLE WATER

P-4805 P-4797
REUSE WATER
24
P-4821 P-4828 IL-24.41 IL-24.43 SEWER NETWORK
IL-24.02 IL-24.15
P-4836
23 INVERT Sewer(DWC-HDPE)
IL-23.83
IL:23.32 LIST OF VILLAGES IN ZONE-1
Size:200mm
Power(HDPE) TYPE OF ROAD
22 IL:21.38 1.NEKKALLU - NE
Size:850x1720mm
A- 25.00m ROW
2.SHAKAMURU - SM
21 B- 17.00m ROW
V=1:200

C- 15.60m ROW
SM C 91
20 D- 12.00m ROW
ROAD NUMBER
H=1:1000 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
Datum:19
Depth of Invert 1.85 1.70 1.70 1.76 1.73 1.49 1.35 1.36 1.37 1.37 1.31 1.40 1.39 NOTES:
Ground Level 24.68 24.80 24.76 24.78 24.82 25.00 25.14 25.14 25.14 25.20 25.25 25.35 24.86 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Length (Unified) (m) 26.08 20.00 22.60 9.20 24.20 20.00 20.00 20.00 22.82 10.05 24.48 20.000 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE

FRL (m) 25.23 25.31 25.37 25.48 25.49 25.53 25.59 25.65 25.71 25.78 25.74 25.88 25.94

Pipe IL (m) 23.38 23.54 23.61 23.67 23.72 23.76 23.99 24.04 24.19 24.24 24.29 24.34 24.41 24.43 24.48 24.55

Crown (m) 24.29 24.36 24.42 24.47 24.51 24.59 24.64 24.69 24.74 24.79 24.86 24.88 24.93 25.00

Manhole No. MH-3947 MH-3946 MH-3833 MH-3832 MH-1579 MH-1578 MH-5158 MH-2081 MH-2080 MH-130 MH-129 MH-5791 MH-5790

Slope (1/S) 373 333 452 230 484 400 400 400 326 503 490 286

Span X Rise 0.90x0.75 0.90x0.75 0.90x0.75 0.75X0.75 0.75X0.60 0.75X0.45 0.75X0.45 0.60X0.45 0.60X0.45 0.60X0.45 0.45X0.45 0.45X0.45

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-5952 P-4873 P-1280 P-1281 P-4868 P-4867 P-4866 P-4865 P-1283 P-1282 P-4859 P-516

Chainage (m) 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 503.500

LONGITUDINAL SECTION (RHS) FROM CH:270 TO CH:503 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 5
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 25 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
FRL :26.01 m
P-1081

N
400 1/S
P-4827 P-4826 P-4825 P-380
B-0.45 x 0.45 m
MH-206 MH-205 FRL MH-3086 MH-3085 MH-4406
L -34.55 m L -20.00 m L -20.00 m L -20.00 m
L -20.00 m
FRL :25.81 m :25.91 m IL FRL :25.96 m FRL :26.01 m FRL :26.06 m
B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m 100 P-4811 P-4809
P-4801
IL :24.33 m :24.40 m IL :24.43 m IL :24.53 m P-4810 P-327 CPL-329 PALA VAGU KR
494 1/S 667 1/S 400 1/S IL :24.48 m 400 1/S MH-692 L -34.55 m MH-2427 MH-2426 L -20.00 m MH-5886 MH-5885 MH-3289 E1 IS
L -20.00 m L -20.00 m HN
FRL :26.07 m B-0.45 x 0.45 m FRL :26.26 m B-0.45 x 0.45 m FRL :26.33 m B-0.45 x 0.45 m FRL :26.35 m FRL :26.32 m FRL :26.31 m E2
A
RI
CPL-308 B-0.45 x 0.45 m VE
IL :24.51 m 230 1/S IL :24.66 m 1,000 1/S IL :24.68 m 500 1/S IL :24.72 m IL :24.78 m IL :24.76 m R
P-1080 CPL-39 CPL-40 333 1/S E3
CPL-41 CPL-42 CPL-43
L -9.20 m
E4
B-0.60 x 0.45 m P-1079

099
90 CPL-45 CPL-46 CPL-47 P-4800

10

20

30

40

50

60

70

80

90
115 1/S CPR-36 CPR-37 CPR-38 CPR-39 CPR-40 CPL-44 CPL-48 E5
L -9.20 m L -20.00 m
E6
B-0.60 x 0.45 m B-0.45 x 0.45 m

1000

110
10

20

30

40

50

60

70

80

90

GUNTUR VIJAYAWADA
920 1/S CPR-41 CPR-42 CPR-44

0
P-4824 P-4823 CPR-43 CPR-45 250 1/S E7
MH-4404 MH-5044 MH-1878 P-4822 MH-1877 P-379 MH-6074
FRL :25.82 m L -34.55 m FRL :25.91 m L -20.00 m FRL :25.96 m L -20.00 m FRL :26.01 m L -20.00 m FRL :26.06 m
E8

IL :24.41 m B-0.45 x 0.45 m IL :24.47 m B-0.45 x 0.45 m IL :24.50 m B-0.45 x 0.45 m IL :24.53 m B-0.45 x 0.45 m IL :24.60 m P-4808 P-4807 P-4806 P-1078 E9
MH-691 MH-4410 MH-706 MH-705 MH-5762
576 1/S 667 1/S 667 1/S 286 1/S
FRL :26.09 m
80 L -34.55 m L -20.00 m L -20.00 m L -20.00 m
FRL :26.12 m FRL :26.26 m FRL :26.33 m FRL :26.35 m FRL :26.32 m E10

N12
B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m
IL :24.52 m IL :24.56 m IL :24.59 m IL :24.62 m IL :24.84 m E11
PLAN FROM CH:0 M TO CH:90 M 864 1/S 667 1/S 667 1/S 91 1/S ZONE 1

N18

N17
N16

N15
N14
N13
CPL-307 CPL-328 E12
SM-C67(15.60 M) PLAN FROM CH:0 M TO CH:100 M E13
SM-C66(15.60 M) SECTOR -03 E14

E15

MH-4406 E16
MH-205 MH-3086 MH-3085
MH-206 FRL: 26.01 m FRL: 26.06 m
FRL: 25.91 m FRL: 25.96 m
FRL: 25.81 m Invert: 24.48 m Invert: 24.53 m MH-2427 MH-2426 MH-5886 MH-5885
Invert: 24.40 m Invert: 24.43 m KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1
27 Invert: 24.33 m MH-692 FRL: 26.26 m FRL: 26.33 m FRL: 26.35 m FRL: 26.32 m
FRL FRL: 26.07 m Invert: 24.66 m Invert: 24.68 m Invert: 24.72 m Invert: 24.78 m
Invert: 24.51 m
GROUND LEVEL 27 FRL
26
CROWN GROUND LEVEL
25 26
CROWN

V=1:200
V=1:200

24 25
P-1080,P-1081 INVERT
Power(HDPE)
IL-24.33 IL : 22.93 H=1:1000
H=1:1000 P-1079,P-330
Size:850x1230mm Datum:24 INVERT
23 IL-24.51

Depth of Invert 1.56 1.60 1.65 1.63 1.54


Datum:22
Ground Level
SM-C66
Depth of Invert 1.48 1.51 1.53 1.53 1.53 25.41 25.53 25.60 25.66 25.71

Ground Level Length (Unified) (m) 34.55 20.00 20.00 20.00


25.11 25.28 25.34 25.39 25.44
FRL (m) 26.07 26.26 26.33 26.35 26.32 SM-C67
Length (Unified) (m) 34.55 20.00 20.00 20.00

FRL (m) 25.81 25.91 25.96 26.01 26.06 Pipe IL (m) 24.51 24.66 24.68 24.72 24.78

Crown (m) 24.96 25.11 25.17 25.13 25.23


Pipe IL (m) 24.33 24.40 24.43 24.48 24.53

24.78 24.85 24.88 24.93 24.98 Manhole No. MH-692 MH-2427 MH-2426 MH-5886 MH-5885
Crown (m)

Manhole No. MH-206 MH-205 MH-3086 MH-3085 MH-4406 Slope (Calculated) (1/S) 230 1000 500 333 KEY PLAN OF SECTOR-3

Slope (Calculated) (1/S) 494 667 400 400 Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 LEGEND:

Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 Type of Material RCC RCC RCC RCC STORM DRAIN WITH FLOW DIRECTION

Type of Material RCC RCC RCC RCC Pipe no: (Label) P-4811 P-4810 P-4809 P-327 P-136 STORM DRAIN NUMBER
L-30 STORM DRAIN LENGTH
Chainage (m) 5 10 20 30 40 50 60 70 80 90 100
Pipe no: (Label) P-4827 P-4826 P-4825 P-380
B-0.60x0.60 STORM DRAIN SPAN x RISE
Chainage (m) 5 10 20 30 40 50 60 70 80 90 99.149 S-150 STORM DRAIN SLOPE
LONGITUDINAL SECTION (LHS) FROM CH:5 M TO CH:100 M
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

LONGITUDINAL SECTION (LHS) FROM CH:5 M TO CH:99 M STORM MAN HOLE

CATCH PIT

MH-1878 MH-1877 MH-6074


MH-4404 MH-5044
FRL: 25.96 m FRL: 26.01 m FRL: 26.06 m
FRL: 25.82 m FRL: 25.91 m UTILITES
Invert: 24.50 m Invert: 24.53 m Invert: 24.60 m
27 Invert: 24.41 m Invert: 24.47 m
STORM WATER
FRL
MH-4410 MH-706 MH-705 MH-5762 POWER CONDUIT
GROUND LEVEL MH-691 FRL: 26.35 m
26 FRL: 26.26 m FRL: 26.33 m FRL: 26.32 m POTABLE WATER
FRL: 26.12 m Invert: 24.59 m Invert: 24.62 m Invert: 24.84 m
CROWN Invert: 24.56 m REUSE WATER
Invert: 24.52 m
27 FRL SEWER NETWORK
25
GROUND LEVEL
26 LIST OF VILLAGES IN ZONE-1
24 P-330,P-1080 INVERT CROWN
Power(HDPE) TYPE OF ROAD

V=1:200
IL-24.41
IL : 22.93 1.NEKKALLU - NE
V=1:200

Size:850x1230mm 25
23 A- 25.00m ROW
2.SHAKAMURU - SM
H=1:1000 B- 17.00m ROW
P-4813,P-1079
Datum:24 INVERT
H=1:1000
22 IL-24.52 C- 15.60m ROW
SM C 91
D- 12.00m ROW
ROAD NUMBER
Depth of Invert 1.41 1.44 1.46 1.48 1.46 Depth of Invert 1.60 1.70 1.74 1.73 1.48 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
25.60 25.71
Ground Level 25.11 25.28 25.34 25.39 25.44 Ground Level 25.41 25.53 25.66
NOTES:
Length (Unified) (m) 34.55 20.00 20.00 20.00 Length (Unified) (m) 34.55 20.00 20.00 20.00
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
FRL (m) 25.82 25.91 25.96 26.01 26.06 FRL (m) 26.12 26.26 26.33 26.35 26.32
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Pipe IL (m) 24.41 24.47 24.50 24.53 24.60 Pipe IL (m) 24.52 24.56 24.59 24.62 24.84

Crown (m) 24.86 24.92 24.95 24.98 25.05 Crown (m) 24.97 25.01 25.04 25.07 25.29

Manhole No. MH-4404 MH-5044 MH-1878 MH-1877 MH-6074 Manhole No. MH-691 MH-4410 MH-706 MH-705 MH-5762

Slope (Calculated) (1/S) 576 667 667 286 Slope (Calculated) (1/S) 864 667 667 91

Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45

Type of Material RCC RCC RCC RCC Type of Material RCC RCC RCC RCC

Pipe no: (Label) P-4824 P-4823 P-4822 P-379 Pipe no: (Label) P-4808 P-4807 P-4806 P-1078

Chainage (m) 5 10 20 30 40 50 60 70 80 90 99.149 Chainage (m) 5 10 20 30 40 50 60 70 80 90 100

LONGITUDINAL SECTION (RHS) FROM CH:5 TO CH:99 M LONGITUDINAL SECTION (RHS) FROM CH:5 TO CH:100 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 7
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 27 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
280 210
CPL-49 CPL-278
CPL-234 MH-2966
FRL :25.22 m
P-4781
L -38.75 m
B-0.45 x 0.45 m
MH-3694
FRL :25.47 m
P-4780
L -20.00 m
B-0.45 x 0.45 m
MH-3693
FRL :25.56 m
P-4779
L -20.00 m
B-0.45 x 0.45 m
MH-6117
FRL :25.67 m
P-4778
L -20.00 m
B-0.45 x 0.45 m
MH-5637
FRL :25.76 m
P-4777
L -20.00 m
B-0.45 x 0.45 m
MH-3084
FRL :25.85 m
P-4776
L -20.00 m
B-0.45 x 0.45 m
MH-3083
FRL :25.95 m
P-4775
L -20.00 m
B-0.45 x 0.45 m
MH-5046
FRL :26.09 m
MH-1882
FRL :26.15 m
P-4773
L -20.00 m
B-0.45 x 0.45 m
MH-1881
FRL :26.23 m
P-4772
L -20.00 m
B-0.45 x 0.45 m
MH-4354
FRL :26.31 m
P-4771
L -20.00 m
B-0.45 x 0.45 m
N
IL :23.78 m IL :23.96 m IL :24.07 m IL :24.17 m IL :24.27 m IL :24.38 m IL :24.47 m IL :24.56 m IL :24.65 m IL :24.72 m IL :24.78 m
215 1/S 182 1/S 200 1/S 200 1/S 182 1/S 222 1/S 222 1/S 286 1/S 333 1/S 1,000 1/S
250 E1
PALA VAGU KR
200 IS
CPL-51 270 CPL-54 CPL-55 CPL-56 HN
CPL-50 CPL-52 CPL-53 P-4774 CPL-57 CPL-58 CPL-59 A
E2 RI
L -20.00 m VE
R
B-0.45 x 0.45 m 108 E3

100

110

120

130

140

150

160

170

180

190

200

210

220

230
10

20

30

40

50

60

70

80

90
222 1/S

0
CPR-50 E4
CPR-47 CPR-48 CPR-49 CPR-52 CPR-53 CPR-54 CPR-55 CPR-56 CPR-57
CPR-46 CPR-51
E5
CPL-233 240
P-4756 260 190 E6
L -9.20 m P-4746
P-4755 P-4753 P-4745 P-4744

GUNTUR VIJAYAWADA
MH-20 MH-3603 P-4754 MH-5356 P-4752 MH-2435 MH-2434 P-4750 MH-4694 P-4749 MH-1216 P-4748 MH-710 MH-709 100 E7
B-0.90 x 1.20 m MH-3602 P-4751 P-4747 MH-4293 MH-494
184 1/S FRL :25.29 m L -18.75 m FRL :25.37 m L -20.00 m
FRL :25.47 m
L -20.00 m FRL :25.56 m L -19.83 m FRL :25.68 m L -9.20 m FRL :25.66 m L -30.97 m FRL :25.85 m L -20.00 m FRL :25.95 m L -27.88 m FRL :26.10 m L -10.05 m FRL :26.14 m L -22.07 m FRL :26.23 m
L -20.00 m
FRL :26.31 m
L -20.00 m
E8
IL :23.00 m B-0.90 x 0.90 m IL :23.60 m B-0.90 x 0.90 m B-0.90 x 0.90 m IL :23.66 m B-0.90 x 0.90 m IL :23.69 m B-0.90 x 0.90 m IL :23.77 m B-0.90 x 0.90 m IL :24.08 m B-0.90 x 0.90 m IL :24.09 m B-0.90 x 0.90 m IL :24.12 m B-0.90 x 0.75 m IL :24.27 m B-0.45 x 0.45 m IL :24.68 m
B-0.45 x 0.45 m
IL :24.70 m
B-0.45 x 0.45 m
IL :23.63 m IL :24.28 m
625 1/S 667 1/S 667 1/S 661 1/S 223 1/S 613 1/S
774 1/S 2,000 1/S 929 1/S 503 1/S 1,104 1/S 1,000 1/S 667 1/S E9
223 1/S 183 1/S FRL :26.20 m
E10
PLAN FROM CH:0 M TO CH:230 M

N12
E11
SM-B14(17.00 M) ZONE 1

N18

N17
N16

N15
N14
N13
E12

E13

MH-1882 MH-1881 MH-4354 SECTOR -03 E14


MH-5046 FRL: 26.31 m
MH-3084 MH-3083 FRL: 26.15 m FRL: 26.23 m
MH-6117 MH-5637 FRL: 26.09 m Invert: 24.78 m E15
MH-3693 FRL: 25.85 m FRL: 25.95 m Invert: 24.65 m Invert: 24.72 m
MH-3694 FRL: 25.67 m FRL: 25.76 m Invert: 24.56 m
MH-2966 FRL: 25.56 m Invert: 24.38 m Invert: 24.47 m FRL E16
27 FRL: 25.47 m Invert: 24.17 m Invert: 24.27 m
FRL: 25.22 m Invert: 23.96 m Invert: 24.07 m
Invert: 23.78 m GROUND LEVEL
KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

26 FRL CROWN
GROUND LEVEL

25 CROWN

INVERT
24
V=1:200

INVERT
P-325 Power(HDPE) Power(HDPE)
23 IL : 22.50 IL : 22.50
IL-23.78 Size:850x1230mm Size:850x1230mm
H=1:1000

Datum:22

SM-B14
Depth of Invert 1.44 1.51 1.49 1.50 1.49 1.47 1.48 1.53 1.50 1.51 1.53

Ground Level 24.58 24.75 24.92 25.06 25.15 25.19 25.21 25.29 25.43 25.39 25.42

Length (Unified) (m) 38.75 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

FRL (m) 25.22 25.47 25.56 25.67 25.76 25.85 25.95 26.09 26.15 26.23 26.31

Invert (m) 23.78 23.96 24.07 24.17 24.27 24.38 24.47 24.56 24.65 24.72 24.78

Crown (m) 24.23 24.41 24.52 24.62 24.72 24.83 24.92 25.01 25.10 25.17 25.23

Manhole No. MH-2966 MH-3694 MH-3693 MH-6117 MH-5637 MH-3084 MH-3083 MH-5046 MH-1882 MH-1881 MH-4354
KEY PLAN OF SECTOR-3
Slope (1/S) 215 182 200 200 182 222 222 222 286 333 1000
LEGEND:
Span x Rise (m) 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45
STORM DRAIN WITH FLOW DIRECTION
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC
P-136 STORM DRAIN NUMBER
Pipe no: (Label) P-4781 P-4780 P-4779 P-4778 P-4777 P-4776 P-4775 P-4774 P-4773 P-4772 P-4771
L-30 STORM DRAIN LENGTH
Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
LONGITUDINAL SECTION (LHS) FROM CH:0 M TO CH:240 M CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

MH-494 STORM MAN HOLE


MH-710 MH-709 MH-4293
MH-1216 FRL: 26.23 m FRL: 26.31 m
MH-4694 FRL: 26.10 m FRL: 26.14 m
MH-5356 MH-2435 MH-2434 FRL: 25.95 m Invert: 24.68 m Invert: 24.70 m
MH-3602 FRL: 25.85 m Invert: 24.12 m Invert: 24.27 m CATCH PIT
MH-3584 MH-20 MH-3603 FRL: 25.56 m FRL: 25.68 m FRL: 25.66 m Invert: 24.09 m
27 FRL: 25.47 m Invert: 24.08 m
FRL: 25.29 m FRL: 25.29 m FRL: 25.37 m Invert: 23.66 m Invert: 23.69 m Invert: 23.77 m
Invert: 23.60 m Invert: 23.63 m
Invert: 22.55 m Invert: 23.00 m
FRL UTILITES
26
STORM WATER
GROUND LEVEL
CROWN POWER CONDUIT
25 POTABLE WATER
REUSE WATER
24 P-12450 SEWER NETWORK
P-12453 P-12452
IL-24.22 IL-24.63 IL-24.27
P-12448 Power(HDPE) Power(HDPE)
23 INVERT IL : 22.50 IL : 22.50 LIST OF VILLAGES IN ZONE-1
IL-23.81 P-12451
Sewer(DWC-HDPE) Size:850x1230mm Size:850x1230mm
IL:23.46 IL-24.14 TYPE OF ROAD
Size:200mm 1.NEKKALLU - NE
22 A- 25.00m ROW
Sewer(DWC-HDPE) 2.SHAKAMURU - SM
IL:21.93 B- 17.00m ROW
V=1:200

Size:200mm
21 C- 15.60m ROW
Sewer(DWC-HDPE)
SM C 91
IL:20.18 D- 12.00m ROW
Size:200mm
ROAD NUMBER
H=1:1000 TYPE OF ROAD (15.60)
Datum:20
VILLAGE NAME (SHAKAMURU)
Depth of Invert 2.74 2.29 1.77 1.84 1.90 1.99 1.89 1.77 1.86 1.98 1.87 1.55 1.61
NOTES:
Ground Level 24.55 24.58 24.63 24.74 24.92 25.05 25.10 25.19 25.21 25.35 25.42 25.39 25.41
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Length (Unified) (m) 9.20 18.75 20.00 20.00 19.83 9.20 30.97 20.00 27.88 10.05 22.07 20.00 20.00
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
FRL (m) 25.29 25.29 25.37 25.47 25.56 25.68 25.66 25.85 25.95 26.10 26.14 26.23 26.31

Invert (m) 22.95 23.00 23.57 23.60 23.63 23.66 23.69 23.76 23.77 24.04 24.08 24.09 24.12 24.25 24.27 24.66 24.68 24.70

Crown (m) 24.15 24.47 24.50 24.53 24.56 24.66 24.94 24.98 24.99 25.02 25.00 25.11 25.13 25.15

Manhole No. MH-3584 MH-20 MH-3603 MH-3602 MH-5356 MH-2435 MH-2434 MH-4694 MH-1216 MH-710 MH-709 MH-4293 MH-494

Slope (1/S) 184 625 667 667 661 613 774 2000 929 503 1104 1000 667

Span x Rise (m) 0.90 x 1.20 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.9 x 0.9 0.9 x 0.9 0.90 x 0.90 0.90 x 0.75 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45

Type of Material RCC RCC RCC RCC RCC 0 RCC RCC RCC 0 RCC RCC RCC

Pipe no: (Label) P-4756 P-4755 P-4754 P-4753 P-4752 P-4751 P-4750 P-4749 P-4748 P-4747 P-4746 P-4745 P-4744

Chainage (m) -5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240

LONGITUDINAL SECTION (RHS) FROM CH:0 TO CH:230 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 8
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 28 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
CPL-325 P-1413
MH-2994
P-4767 P-4766 P-538
MH-4354
FRL :26.31 m
P-4771
L -20.00 m
B-0.45 x 0.45 m
MH-606
FRL :26.37 m
P-4770 10
L -20.00 m
B-0.45 x 0.45 m
MH-605
FRL :26.42 m
P-4769
L -20.00 m
B-0.45 x 0.45 m
MH-5638
P-4768
L -20.00 m
FRL :26.46 m B-0.45 x 0.45 m
MH-3088 L -20.00 m
FRL :26.50 m B-0.45 x 0.45 m
MH-3087
FRL :26.54 m
L -20.00 m
B-0.45 x 0.45 m
MH-6083
FRL :26.58 m
L -20.00 m
B-0.45 x 0.45 m
MH-6082
FRL :26.62 m
CPR-317

MH-4697
P-540
L -20.00 m MH-4698
FRL :26.67 m
P-4542
L -34.12 m MH-2929
CPL-173
N
IL :24.78 m IL :24.82 m IL :24.84 m IL :24.86 m IL :24.89 m 250 1/S IL :24.97 m 118 1/S IL :25.14 m FRL :26.65 m B-0.45 x 0.45 m B-0.45 x 0.45 m FRL :26.58 m
1,000 1/S IL :24.80 m 1,000 1/S 1,000 1/S 1,000 1/S 667 1/S IL :25.00 m
IL :25.05 m 400 1/S 853 1/S IL :24.23 m E1
PALA VAGU KR
IS
CPL-64 HN
CPL-59 CPL-60 CPL-61 CPL-62 CPL-63 CPL-65 CPL-66 CPL-67 A
E2 RI
CPL-68 VE
R
108 0 108 P-1412, E3
220

230

240

250

260

270

280

290

300

310

320

330

340

350

360
L -10.06 m

380

390

400

410

420

430
E4
CPR-57 CPR-58 CPR-59 CPR-60 CPR-61 CPR-62 CPR-63 CPR-64 B-0.90 x1.05 m
CPR-65 CPR-66 E5
126 1/S
E6
P-4744

GUNTUR VIJAYAWADA
MH-494 100 MH-493 P-4743 MH-3300 100 MH-3299 P-4741 MH-5181 P-4740 MH-2109 P-4739 MH-2108 P-1315 MH-5855 P-536 E7
L -20.00 m P-4742 MH-562 P-4541 MH-2221
FRL :26.31 m FRL :26.51 m L -20.00 m FRL :26.48 m L -20.00 m L -20.00 m FRL :26.50 m L -20.00 m FRL :26.54 m L -20.00 m FRL :26.58 m L -20.00 m FRL :26.62 m L -20.00 m MH-563
FRL :26.46 m L -34.13 m
E8
B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m IL :24.91 m B-0.45 x 0.45 m B-0.45 x 0.45 m IL :25.10 m FRL :26.65 m FRL :26.67 m FRL :26.52 m
IL :24.70 m IL :24.73 m IL :24.76 m B-0.45 x 0.45 m IL :24.80 m B-0.45 x 0.45 m IL :24.85 m IL :25.00 m B-0.45 x 0.45 m
667 1/S 667 1/S
IL :25.25 m
333 1/S IL :25.23 m IL :25.03 m B-0.45 x 0.45 m IL :24.31 m
CPL-172 E9
400 1/S 222 1/S 200 1/S 100 1/S
500 1/S FRL :26.64 m 284 1/S E10

N12
PLAN FROM CH:220 M TO CH:360 M E11
PLAN FROM CH:380 M TO CH:430 M ZONE 1

N18

N17
N16

N15
N14
N13
SM-B14(17.00 M) E12

MH-6082
SM-B14(17.00 M) E13

MH-4354 MH-606 MH-605 MH-5638 MH-3088 MH-3087 MH-6083


FRL: 26.62 m
SECTOR -03 E14
FRL: 26.46 m FRL: 26.50 m FRL: 26.54 m FRL: 26.58 m
FRL: 26.31 m FRL: 26.37 m FRL: 26.42 m Invert: 25.14 m
Invert: 24.84 m Invert: 24.86 m Invert: 24.89 m Invert: 24.97 m E15
Invert: 24.78 m Invert: 24.80 m Invert: 24.82 m
E16
27 FRL

GROUND LEVEL MH-4697 MH-4698 MH-2929 KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

26 CROWN FRL: 26.65 m FRL: 26.67 m FRL: 26.58 m


Invert: 25.05 m Invert: 25.00 m Invert: 24.23 m
FRL
25 27
GROUND LEVEL
INVERT
24 Power(HDPE) Power(HDPE) CROWN
26
IL:22.88 IL:22.88
V=1:200

Size:850x1720mm Size:850x1720mm
23 25

V=1:200
H=1:1000
INVERT
Datum:22 P-1412 & P-1413
Datum:24
H=1:1000 IL-24.23 SM-B14
Depth of Invert 1.53 1.57 1.60 1.62 1.64 1.65 1.61 1.48 Depth of Invert 1.60 1.67 2.35

Ground Level 25.42 25.64 25.77 25.92 25.99 26.06 26.08 25.99 Ground Level 25.87 25.87 25.87

Length (Unified) (m) 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Length (Unified) (m) 20.00 34.12

FRL (m) 26.31 26.37 26.42 26.46 26.50 26.54 26.58 26.62 FRL (m) 26.65 26.67 26.58

Invert (m) 24.78 24.80 24.82 24.84 24.86 24.89 24.97 25.14 Invert (m) 25.05 25.00 24.96

Crown (m) 25.23 25.25 25.27 25.29 25.31 25.34 25.42 25.59 Crown (m) 25.50 25.45 25.41

Manhole No. MH-4354 MH-606 MH-605 MH-5638 MH-3088 MH-3087 MH-6083 MH-6082 Manhole No. MH-4697 MH-4698 MH-2929
KEY PLAN OF SECTOR-3
Slope (1/S) 1000 1000 1000 1000 667 250 118 Slope (1/S) 400 853
LEGEND:
Span x Rise (m) 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 Span x Rise (m) 0.45 x 0.45 0.45 x 0.45
STORM DRAIN WITH FLOW DIRECTION
Type of Material RCC RCC RCC RCC RCC RCC RCC Type of Material RCC RCC
P-136 STORM DRAIN NUMBER
Pipe no: (Label) P-4771 P-4770 P-4769 P-4768 P-4767 P-4766 P-538 Pipe no: (Label) P-540 P-4542 L-30 STORM DRAIN LENGTH
Chainage (m) 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 Chainage (m) 380 390 400 410 420 430 B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
LONGITUDINAL SECTION (LHS) FROM CH:230 M TO CH:360 M CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
LONGITUDINAL SECTION (LHS) FROM CH:380 M TO CH:430 M
STORM MAN HOLE
MH-493 MH-5181 MH-2109 MH-2108 MH-5855
MH-3300 MH-3299
MH-494 FRL: 26.51 m FRL: 26.50 m FRL: 26.54 m FRL: 26.58 m FRL: 26.62 m
FRL: 26.48 m FRL: 26.46 m
FRL: 26.31 m Invert: 24.73 m Invert: 24.85 m Invert: 24.91 m Invert: 25.00 m Invert: 25.10 m CATCH PIT
Invert: 24.76 m Invert: 24.80 m
Invert: 24.70 m
FRL
27 GROUND LEVEL
UTILITES

MH-563 STORM WATER


26 CROWN MH-562
MH-2221
FRL: 26.65 m FRL: 26.67 m POWER CONDUIT
FRL: 26.52 m
Invert: 25.23 m Invert: 25.03 m
Invert: 24.31 m POTABLE WATER
25 FRL REUSE WATER
27 GROUND LEVEL
INVERT SEWER NETWORK
24 Power(HDPE) Power(HDPE)
IL:22.88 Sewer(DWC-HDPE) IL:22.88 CROWN
IL:24.30 26 LIST OF VILLAGES IN ZONE-1
Size:850x1720mm Size:850x1720mm
Size:200mm
23 TYPE OF ROAD
P-5836 1.NEKKALLU - NE
25
IL-24.66 A- 25.00m ROW

V=1:200
INVERT 2.SHAKAMURU - SM
22 B- 17.00m ROW
P-1412
Datum:24 IL-24.31 C- 15.60m ROW
SM C 91
V=1:200

21 H=1:1000 D- 12.00m ROW


ROAD NUMBER
Depth of Invert 1.42 1.64 2.21 TYPE OF ROAD (15.60)
H=1:1000
Datum:20
VILLAGE NAME (SHAKAMURU)
Ground Level 25.87 25.87 25.87

Depth of Invert 1.61 1.78 1.72 1.66 1.65 1.63 1.58 1.52 NOTES:
Length (Unified) (m) 20.00 34.13

Ground Level 25.41 25.64 25.76 25.92 25.99 26.05 26.08 26.00 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
FRL (m) 26.65 26.67 26.52
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Length (Unified) (m) 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Invert (m) 25.23 25.03 24.91

FRL (m) 26.31 26.51 26.48 26.46 26.50 26.54 26.58 26.62 Crown (m) 25.68 25.48 25.36

Invert (m) 24.70 24.73 24.76 24.80 24.85 24.91 25.00 25.10 Manhole No. MH-562 MH-563 MH-2221

Crown (m) 25.15 25.18 25.21 25.25 25.30 25.36 25.45 25.55 Slope (1/S) 100 284

Manhole No. MH-494 MH-493 MH-3300 MH-3299 MH-5181 MH-2109 MH-2108 MH-5855 Span x Rise (m) 0.45 x 0.45 0.45 x 0.45

Slope (1/S) 667 667 500 400 333 222 200 Type of Material RCC RCC

Span x Rise (m) 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 Pipe no: (Label) P-536 P-4541

Type of Material RCC RCC RCC RCC RCC RCC RCC Chainage (m) 380 390 400 410 420 430

Pipe no: (Label) P-4744 P-4743 P-4742 P-4741 P-4740 P-4739 P-1315

Chainage (m) 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360
LONGITUDINAL SECTION (RHS) FROM CH:380 TO CH:430 M
LONGITUDINAL SECTION (RHS) FROM CH:230 TO CH:360 M
PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:
EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 2 9
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 29 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
N
PALA VAGU KR
E1 IS
HN
P-4687 A
P-377 P-1120 P-1119 E2 RI
VE
MH-1331 L -29.09 m 10 MH-526 10 MH-525 MH-5705 R
MH-3326 L -29.09 m L -34.50 m L -33.22 m E3
FRL :26.60 m B-0.90 x 0.60 m FRL :26.78 m FRL :26.91 m FRL :26.91 m FRL :27.08 m
B-0.90 x 0.60 m B-0.90 x 0.60 m B-0.45 x 0.45 m
IL :24.48 m 1,940 1/S IL :24.65 m IL :24.66 m IL :24.89 m IL :25.55 m E4
1,940 1/S 575 1/S 664 1/S
E5
CPL-69 CPL-70 CPL-71
CPL-72 E6
P-1316

GUNTUR VIJAYAWADA
E7
L -9.20 m 0 0
B-0.45 x 0.45 m E8

1000

110

120

131
10

20

30

40

50

60

70

80

90
CPR-68 CPR-69 CPR-70 CPR-71

0
CPR-67 131 1/S CPR-72
E9
E10

N12
MH-1332 P-4686 P-4685 P-4684 P-4683 P-4682 P-376
MH-1989 MH-4427 MH-1775 MH-1317 MH-144 MH-143 E11
L -20.00 m ZONE 1

N18

N17
N16

N15
N14
N13
FRL :26.62 m L -25.90 m L -20.00 m L -20.00 m L -20.00 m L -20.00 m
FRL :26.73 m FRL :26.80 m FRL :26.87 m FRL :26.94 m FRL :27.01 m FRL :27.08 m E12
IL :25.10 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m
B-0.45 x 0.45 m B-0.45 x 0.45 m
IL :25.27 m IL :25.33 m IL :25.40 m 286 1/S IL :25.47 m IL :25.53 m IL :25.62 m
333 1/S 222 1/S E13
216 1/S 286 1/S 333 1/S SECTOR -03 E14

PLAN FROM CH:5 M TO CH:130 M E15

E16
SM-C61(15.60 M)
KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

MH-5705
MH-1331 MH-3326 MH-526 MH-525
FRL: 27.08 m
FRL: 26.60 m FRL: 26.78 m FRL: 26.91 m FRL: 26.91 m
Invert: 25.55 m
Invert: 24.48 m Invert: 24.65 m Invert: 24.66 m Invert: 24.89 m
28

FRL
27 GROUND LEVEL

26 CROWN
P-1316
IL-25.03 SM-C61
25
P-4878 Power(HDPE)
P-4681 IL : 24.00
V=1:200

IL-25.04 Size:850x1230mm
INVERT IL-24.81
24 P-4690
IL-24.48
H=1:1000
Datum:23
Depth of Invert 2.12 2.13 2.25 2.25 2.02 2.02 1.53

Ground Level 26.02 26.14 26.21 26.34 26.47

Length (Unified) (m) 29.09 29.09 34.50 33.22

FRL (m) 26.60 26.78 26.91 28.12 27.08

Invert (m) 24.63 25.65 24.66 24.83 24.89 25.50 25.55 KEY PLAN OF SECTOR-3
Crown (m) 25.23 25.25 25.26 25.43 25.49 25.95 26.00 LEGEND:

Manhole No. MH-1331 MH-3326 MH-526 MH-525 MH-5705 STORM DRAIN WITH FLOW DIRECTION

Slope (Calculated) (1/S) 1,940 1,940 575 664 P-136 STORM DRAIN NUMBER
L-30 STORM DRAIN LENGTH
Span x Rise(m) 0.90x0.60 0.90x0.60 0.90x0.60 0.45x0.45
B-0.60x0.60 STORM DRAIN SPAN x RISE
Type of Material RCC RCC RCC RCC S-150 STORM DRAIN SLOPE
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Pipe no: (Label) P-4687 P-377 P-1120 P-1119

5 10 20 30 40 50 60 70 80 90 100 110 120 130 130.974 STORM MAN HOLE


Chainage (m)

CATCH PIT
LONGITUDINAL SECTION (LHS) FROM CH:5 M TO CH:130 M
UTILITES
STORM WATER
MH-4427 MH-1775 MH-144 MH-143
MH-1332 MH-1989 MH-1317 POWER CONDUIT
FRL: 26.80 m FRL: 26.87 m FRL: 27.01 m FRL: 27.08 m
FRL: 26.62 m FRL: 26.73 m FRL: 26.94 m POTABLE WATER
Invert: 25.33 m Invert: 25.40 m Invert: 25.53 m Invert: 25.62 m
Invert: 25.10 m Invert: 25.27 m Invert: 25.47 m
28 REUSE WATER
FRL SEWER NETWORK
27 GROUND LEVEL
LIST OF VILLAGES IN ZONE-1
CROWN
26
TYPE OF ROAD
1.NEKKALLU - NE
V=1:200

A- 25.00m ROW
2.SHAKAMURU - SM
24 B- 17.00m ROW
INVERT Power(HDPE)
H=1:1000 P-553 & P-1316 IL : 24.00 C- 15.60m ROW
IL-25.10 Size:850x1230mm SM C 91
Datum:23 D- 12.00m ROW
ROAD NUMBER
Depth of Invert 1.52 1.46 1.47 1.47 1.47 1.48 1.46 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
Ground Level 26.02 26.13 26.19 26.24 26.31 26.39 26.47
NOTES:
Length (Unified) (m) 25.90 20.00 20.00 20.00 20.00 20.00
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
FRL (m) 26.62 26.73 26.80 26.87 26.94 27.01 27.08
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Invert (m) 25.15 25.27 25.33 25.40 25.47 25.53 25.62

Crown (m) 25.60 25.72 25.78 25.85 25.42 25.98 26.07

Manhole No. MH-1332 MH-1989 MH-4427 MH-1775 MH-1317 MH-144 MH-143

Slope (Calculated) (1/S) 216 333 286 286 333 222

Span x Rise(m) 0.45x0.45 0.45x0.45 0.45x0.45 0.45x0.45 0.45x0.45 0.45x0.45

Type of Material RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-4686 P-4685 P-4684 P-4683 P-524 P-524

Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 130.974

LONGITUDINAL SECTION (RHS) FROM CH:5 TO CH:130 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 0
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 30 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
60
MH-922
P-4722
L -35.98 m MH-5418
FRL :26.31 m
P-4721
L -20.00 m MH-322
FRL :26.39 m
P-1438
L -20.00 m
B-0.45 x 0.45 m
MH-321
P-1439
80 m MH-614
L -14.70
FRL :26.43 mB-0.45 x 0.45 m FRL :26.51 m
P-4708
L -33.13 m
B-0.45 x 0.45 m
MH-4884
FRL :26.64 m
P-4707
L -20.00 m
B-0.45 x 0.45 m
MH-4883
FRL :26.71 m
MH-5167
FRL :26.85 m
10 N
FRL :26.15 m B-0.45 x 0.45 m B-0.45 x 0.45 m CPL-269 P-4693
IL :24.84 m IL :24.89 m IL :24.98 m 255 1/S IL :25.14 m 250 1/S IL :25.22 m IL :25.20 m
IL :24.79 m 720 1/S 400 1/S 222 1/S 490 1/S IL :25.01 m L -27.47 m PALA VAGU KR
E1 IS
CPR-227 B-0.45 x 0.45 m HN
A
E2 RI
CPL-74 CPL-75 CPL-76 CPL-77 CPL-78 CPL-79 250 1/S VE
50 P-1437 R
E3
L -9.20 m 70 0
B-0.45 x 0.45 m E4

100

110

120

130

140

150

160

170

176
10

20

30

40

50

60

70

80

90
CPR-74 CPR-75 CPR-76 CPR-77 CPR-78 CPR-79 CPR-80 CPR-81
CPL-223 307 1/S CPR-82 E5

E6

GUNTUR VIJAYAWADA
1,000 1/S
MH-923 P-4706 MH-1532 P-4705 MH-4170 P-4704 MH-241 P-4703 MH-240 P-4702 MH-5644 MH-3498 P-4700 MH-3497 E7
40 FRL :26.18 m L -34.96 m FRL :26.31 m L -24.54 m FRL :26.40 m L -20.00 m FRL :26.49 m L -20.00 m FRL :26.55 m L -20.00 m FRL :26.62 m
B-0.45 x 0.45 m
L -20.00 m FRL :26.77 m E8
FRL :26.69 m MH-3809
60 L -20.00 m
IL :24.61 m B-0.45 x 0.45 m IL :24.89 m B-0.45 x 0.45 m IL :24.96 m B-0.45 x 0.45 m IL :25.03 m CPR-245 B-0.45 x 0.45 m IL :25.08 m B-0.45 x 0.45 m IL :25.10 m
P-4701 IL :25.12 m B-0.45 x 0.45 m IL :25.15 m FRL :26.88 m E9
269 1/S 351 1/S 286 1/S 400 1/S 1,000 1/S 667 1/S IL :25.40 m E10

N12
807 1/S CPL-244
PLAN FROM CH:5 M TO CH:170 M ZONE 1 E11

N18

N17
N16

N15
N14
N13
E12
SM-C64(15.60 M)
MH-4883 E13
MH-614 MH-4884 SECTOR -03
MH-5418 MH-322 MH-321 FRL: 26.64 m FRL: 26.71 m E14
MH-922 FRL: 26.39 m FRL: 26.43 m FRL: 26.51 m Invert: 25.22 m
FRL: 26.31 m Invert: 25.01 m Invert: 25.14 m E15
FRL: 26.15 m Invert: 24.89 m Invert: 24.98 m
Invert: 24.84 m
Invert: 24.79 m E16

27 FRL

GROUND LEVEL KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

26 CROWN

25

P-1437 INVERT
24 IL-24.79
V=1:200

SM-C64
Power(HDPE) Power(HDPE)
23 IL : 22.50 IL : 22.50
Size:850x1230mm Size:850x1230mm
H=1:1000
Datum:22

Depth of Invert 1.36 1.47 1.50 1.45 1.50 1.50 1.49

Ground Level 25.36 25.47 25.50 25.63 25.75 25.92 25.95

Length (Unified) (m) 35.98 20.00 20.00 14.70 33.13 20.00

FRL (m) 26.15 26.31 26.39 26.43 26.51 26.64 26.71

Pipe IL (m) 24.79 24.84 24.89 24.98 25.01 25.14 25.22

Crown (m) 25.24 25.29 25.34 25.43 25.46 25.59 25.67


KEY PLAN OF SECTOR-3
Manhole No. MH-922 MH-5418 MH-322 MH-321 MH-614 MH-4884 MH-4883
LEGEND:
Slope (Calculated) (1/S) 720 400 222 490 255 250
STORM DRAIN WITH FLOW DIRECTION
Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45
P-136 STORM DRAIN NUMBER
Type of Material RCC RCC RCC RCC RCC RCC L-30 STORM DRAIN LENGTH
B-0.60x0.60 STORM DRAIN SPAN x RISE
Pipe no: (Label) P-4722 P-4721 P-1438 P-1439 P-4708 P-4707
S-150 STORM DRAIN SLOPE
Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

STORM MAN HOLE


LONGITUDINAL SECTION (LHS) FROM CH:5 M TO CH:150 M
CATCH PIT
MH-3498 MH-3497
MH-241 MH-240 MH-5644
MH-4170 FRL: 26.69 m FRL: 26.77 m
MH-1532 FRL: 26.55 m FRL: 26.62 m
MH-923 FRL: 26.40 m FRL: 26.49 m Invert: 25.12 m Invert: 25.15 m UTILITES
FRL: 26.18 m FRL: 26.31 m Invert: 25.08 m Invert: 25.10 m
Invert: 24.96 m Invert: 25.03 m
Invert: 24.89 m STORM WATER
Invert: 24.61 m
27 FRL POWER CONDUIT
POTABLE WATER
GROUND LEVEL
REUSE WATER
26 CROWN
P-1437
SEWER NETWORK
IL-24.76

25 LIST OF VILLAGES IN ZONE-1

INVERT TYPE OF ROAD


P-4729 1.NEKKALLU - NE
24 IL-24.61
A- 25.00m ROW
V=1:200

2.SHAKAMURU - SM
Power(HDPE) Power(HDPE) B- 17.00m ROW
23 IL : 22.50 Sewer(DWC-HDPE) IL : 22.50
Size:850x1230mm Size:850x1230mm C- 15.60m ROW
IL:23.44 SM C 91
H=1:1000 Size:200mm D- 12.00m ROW
ROAD NUMBER
Datum:22 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)

Depth of Invert 1.57 1.42 1.44 1.46 1.47 1.52 1.57 1.62 NOTES:

Ground Level 25.36 25.47 25.52 25.62 25.84 25.91 25.92 26.03 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED

Length (Unified) (m) 34.96 24.54 20.00 20.00 20.00 20.00 20.00 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE

FRL (m) 26.18 26.31 26.40 26.49 26.55 26.62 26.69 26.77

Pipe IL (m) 24.76 24.89 24.96 25.03 25.08 25.10 25.12 25.15

Crown (m) 25.21 25.34 25.41 25.48 25.53 25.55 25.57 25.60

Manhole No. MH-923 MH-1532 MH-4170 MH-241 MH-240 MH-5644 MH-3498 MH-3497

Slope (Calculated) (1/S) 269 351 286 400 1000 1000 667

Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45

Type of Material RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-4706 P-4705 P-4704 P-4703 P-4702 P-4701 P-4700

Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LONGITUDINAL SECTION (RHS) FROM CH:5 TO CH:160 M


PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:
EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 1
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 31 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
MH-469
P-4631 P-4630 P-1399 P-4629 P-12378 P-4627 P-4626 P-1401 P-1400 P-4623 P-4622
MH-5551 MH-2817 MH-2816 MH-5020 MH-4914 MH-1601 MH-1600 MH-919
FRL :26.15 m
IL :23.95 m
L -20.00 m
B-0.90 x 0.90 m
1,333 1/S
FRL :26.21 m
IL :23.97 m
L -20.00 m
B-0.90 x 0.90 m
800 1/S
FRL :26.28 m
IL :23.99 m
L -22.60 m
B-0.90 x 0.90 m
742 1/S
IL :24.02 m
L -9.20 m
FRL :26.35 m B-0.90 x 0.90 m
315 1/S
L -12.48 m
B-0.75 x 0.60 m
624 1/S
FRL :26.42 m
IL :24.07 m
L -20.00 m
B-0.75 x 0.90 m
500 1/S
FRL :26.49 m
IL :24.11 m
L -20.00 m
B-0.75 x 0.90 m
500 1/S
FRL :26.55 m
IL :24.15 m
L -23.50 m MH-2152
B-0.75 x 0.90 m FRL :26.63 m
588 1/S IL :24.19 m
L -9.20 m
B-0.75 x 0.90 m
307 1/S
L -23.18 m
B-0.60 x 0.90 m
331 1/S
FRL :26.73 m L -20.00 m
IL :24.90 m B-0.60 x 0.90 m
MH-918
FRL :26.79 m
IL :24.97 m
L -20.00 m
B-0.60 x 0.90 m N
10 286 1/S
PALA VAGU KR
E1 IS
MH-5876 CPL-82 CPL-83 CPL-84 CPL-88 CPL-89 CPL-91 HN
P-4632
CPL-80 CPL-81 P-4628 CPL-85 CPL-86 CPL-87 CPL-90
A
FRL :26.05 m MH-3 MH-4532 E2 RI
L -31.48 m L -15.07 m VE
IL :23.92 m FRL :26.38 m FRL :26.66 m E3
R
B-0.90 x 0.90 m B-0.75 x 0.90 m
IL :24.05 m IL :24.39 m
1,049 1/S 754 1/S E4
0

510

520

530

540

550

560

570

580

590

600

610

620

630

640

650

660

670

680

690

700

710

720

730

740

750
E5

E6

GUNTUR VIJAYAWADA
E7
CPR-83 CPR-84 CPR-85 CPR-86 CPR-87 CPR-88 CPR-89 CPR-90 CPR-91 CPR-92 CPR-93 E8

E9

P-4608 P-4607 P-4606 E10


MH-3360 MH-2593 MH-1370 P-4600

N12
MH-3359 MH-5214 MH-5213 P-4605 P-4604
MH-2592 P-4603
MH-4780 P-4602 MH-1371 P-4601 MH-4058 P-4599
MH-38
L -25.29 m L -20.00 m L -20.00 m L -20.00 m E11
FRL :26.15 m FRL :26.23 m FRL :26.30 m FRL :26.36 m L -20.00 m FRL :26.42 m L -20.00 m
FRL :26.49 m
L -20.00 m
FRL :26.55 m
L -20.00 m
FRL :26.61 m
L -20.00 m FRL :26.67 m FRL :26.74 m L -20.00 m
ZONE 1

N18

N17
N16

N15
N14
N13
B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m FRL :26.80 m
IL :24.09 m IL :24.46 m IL :24.52 m IL :24.58 m B-0.60 x 0.75 m IL :24.65 m IL :24.78 m IL :24.84 m IL :24.91 m IL :24.98 m E12
328 1/S 313 1/S 362 1/S IL :24.70 m 243 1/S 358 1/S 278 1/S 278 1/S 307 1/S IL :25.05 m
624 1/S 332 1/S E13
PLAN FROM CH:540 M TO CH:750 M SECTOR -03 E14

SM-A10(25.00 M) E15

MH-919 MH-918 E16


MH-1600 MH-2152 MH-4532
MH-3 MH-4914 MH-1601 FRL: 26.73 m FRL: 26.79 m
MH-2816 MH-5020 FRL: 26.55 m FRL: 26.63 m FRL: 26.66 m
28 MH-5551 MH-2817 FRL: 26.42 m FRL: 26.49 m Invert: 24.90 m Invert: 24.97 m
MH-5876 FRL: 26.28 m FRL: 26.35 m FRL: 26.38 m Invert: 24.19 m Invert: 24.39 m KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1
FRL: 26.15 m FRL: 26.21 m Invert: 24.07 m Invert: 24.11 m Invert: 24.15 m
FRL: 26.05 m Invert: 23.99 m Invert: 24.02 m Invert: 24.05 m FRL
Invert: 23.95 m Invert: 23.97 m
Invert: 23.92 m GROUND LEVEL
27
FRL
CROWN
GROUND LEVEL
26
CROWN
SM-A10
25
P-4624 INVERT
IL-24.84
24 P-12378 P-4625
P-4738 Sewer(DWC-HDPE)
IL-24.54 IL-24.64 IL:23.60
IL-24.49
V=1:200

P-655 INVERT
Size:200mm
23 IL-23.92

H=1:1000
Datum:22

Depth of Invert 2.13 2.20 2.26 2.29 2.33 2.33 2.35 2.38 2.40 2.44 2.27 1.83 1.82

Ground Level 25.51 25.68 26.36 25.80 25.72 25.76 25.84 25.92 26.00 26.12 26.13 26.20 26.24

Length (Unified) (m) 31.48 20.00 20.00 22.60 9.20 15.07 20.00 20.00 23.50 9.20 23.18 20.00

FRL (m) 26.05 26.15 26.21 26.28 26.35 26.38 26.42 26.49 26.55 26.63 26.66 26.73 26.79

Invert (m) 23.92 23.95 23.97 23.99 24.02 24.05 24.07 24.11 24.15 24.19 24.36 24.39 24.83 24.90 24.97 KEY PLAN OF SECTOR-3
Crown (m) 24.82 24.85 24.87 24.89 24.92 24.95 24.97 25.01 25.05 25.09 25.26 25.73 25.80 25.87 LEGEND:

Manhole No. MH-5876 MH-5551 MH-2817 MH-2816 MH-5020 MH-3 MH-4914 MH-1601 MH-1600 MH-2152 MH-4532 MH-919 MH-918 STORM DRAIN WITH FLOW DIRECTION

Slope (1/S) 1049 1333 800 742 315 754 500 500 588 307 331 286 P-136 STORM DRAIN NUMBER
L-30 STORM DRAIN LENGTH
Span x Rise (m) 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.90 x 0.90 0.75 x 0.90 0.75 x 0.90 0.75 x 0.90 0.75 x 0.90 0.75 x 0.90 0.60 x 0.90 0.60 x 0.90 B-0.60x0.60 STORM DRAIN SPAN x RISE
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC S-150 STORM DRAIN SLOPE
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Pipe no: (Label) P-4632 P-4631 P-4630 P-1399 P-4629 P-4628 P-4627 P-4626 P-1401 P-1400 P-4623 P-4622
STORM MAN HOLE
Chainage (m) 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700 710 720 730 740 750

LONGITUDINAL SECTION (LHS) FROM CH:510 M TO CH:750 M CATCH PIT

MH-1370 MH-4058 MH-38


MH-2592 MH-4780 MH-1371 FRL: 26.80 m
MH-5213 MH-2593 FRL: 26.67 m FRL: 26.74 m UTILITES
MH-3359 MH-5214 FRL: 26.49 m FRL: 26.55 m FRL: 26.61 m Invert: 25.05 m
28 MH-3360 FRL: 26.36 m FRL: 26.42 m Invert: 24.91 m Invert: 24.98 m
FRL: 26.23 m FRL: 26.30 m Invert: 24.78 m Invert: 24.84 m STORM WATER
FRL: 26.15 m Invert: 24.58 m Invert: 24.65 m Invert: 24.70 m
Invert: 24.46 m Invert: 24.52 m FRL
Invert: 24.09 m POWER CONDUIT
27 GROUND LEVEL
FRL POTABLE WATER
GROUND LEVEL REUSE WATER
CROWN
26 CROWN SEWER NETWORK

LIST OF VILLAGES IN ZONE-1


25
TYPE OF ROAD
INVERT
1.NEKKALLU - NE
24 INVERT A- 25.00m ROW
2.SHAKAMURU - SM
P-5925 B- 17.00m ROW
IL-24.09 C- 15.60m ROW
23 SM C 91
V=1:200

D- 12.00m ROW
ROAD NUMBER
TYPE OF ROAD (15.60)
Datum:22 VILLAGE NAME (SHAKAMURU)
H=1:1000
NOTES:
Depth of Invert 2.06 1.77 1.78 1.78 1.77 1.79 1.77 1.77 1.76 1.76 1.75
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Ground Level 25.73 26.57 25.73 25.73 25.83 25.90 25.99 26.10 26.15 26.20 26.24
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Length (Unified) (m) 25.29 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

FRL (m) 26.15 26.23 26.30 26.36 26.42 26.49 26.55 26.61 26.67 26.74 26.80

Invert (m) 24.42 24.46 24.52 24.58 24.65 24.70 24.78 24.84 24.91 24.98 25.05

Crown (m) 25.17 25.21 25.27 25.33 25.40 25.45 25.53 25.59 25.66 25.73 25.80

Manhole No. MH-3360 MH-3359 MH-5214 MH-5213 MH-2593 MH-2592 MH-4780 MH-1371 MH-1370 MH-4058 MH-38

Slope (1/S) 624 332 328 313 362 243 358 278 278 307 330

Span x Rise (m) 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-4608 P-4607 P-4606 P-4605 P-4604 P-4603 P-4602 P-4601 P-4600 P-4599 P-4598

Chainage (m) 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700 710 720 730 740 750

LONGITUDINAL SECTION (RHS) FROM CH:540 TO CH:750 M


PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:
EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 2
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 32 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
P-4621 P-4620 P-4619 P-4618 P-4617 P-4616 P-4615 P-4614 P-4613 P-4612 P-4611
MH-918
FRL :26.79 m
IL :24.97 m
L -20.00 m
B-0.60 x 0.90 m
MH-3656
FRL :26.85 m
IL :25.04 m
L -20.00 m
B-0.60 x 0.90 m
400 1/S
MH-3655
FRL :26.92 m
IL :25.09 m
L -20.00 m
B-0.60 x 0.90 m
MH-5393
FRL :26.99 m
IL :25.16 m
L -20.00 m
B-0.60 x 0.90 m
MH-2489
FRL :27.06 m
IL :25.22 m
L -20.00 m
B-0.60 x 0.90 m
222 1/S
MH-2488
FRL :27.13 m
IL :25.31 m
L -20.00 m
B-0.45 x 0.45 m
286 1/S
MH-6019
FRL :27.20 m
IL :25.83 m
L -20.00 m
B-0.45 x 0.45 m
400 1/S
MH-4952
FRL :27.26 m
IL :25.88 m
L -20.00 m
B-0.45 x 0.45 m
286 1/S
MH-1691
FRL :27.33 m
IL :25.99 m
L -20.00 m
B-0.45 x 0.45 m
400 1/S
MH-1690
FRL :27.40 m
IL :26.04 m
L -20.00 m
B-0.45 x 0.45 m
400 1/S
MH-4260
FRL :27.47 m
IL :26.09 m
L -20.00 m MH-423
B-0.45 x 0.45 m FRL :27.54 m
IL :26.15 m
N
286 1/S 308 1/S 308 1/S 333 1/S
PALA VAGU KR
CPL-91 CPL-92 CPL-97 E1 IS
CPL-93 CPL-94 CPL-95 CPL-96 CPL-98 CPL-99 CPL-100 CPL-101 CPL-102 HN
A
E2 RI
VE
B-0.45 x 0.45 m R
E3

E4
148

740

750

760

770

780

790

800

810

820

830

840

850

860

870

880

890

900

910

920

930

940

950

960
E5

E6

GUNTUR VIJAYAWADA
CPR-93 CPR-94 CPR-97 CPR-98 CPR-99 CPR-100 CPR-101 CPR-102 CPR-103 CPR-104 E7
CPR-95 CPR-96
140 E8

E9
P-4598 MH-37 P-612 MH-2615 P-1402 MH-2924 MH-3447 P-4594 MH-5261 MH-2267 P-4592 MH-2266 P-4591 MH-4588 P-4590 MH-1035
MH-38 MH-2614 P-4597 P-4596 MH-2923 P-4595 P-4593 E10
L -20.00 m L -22.13 m FRL :26.94 m L -10.05 m L -20.00 m L -20.00 m L -20.00 m
FRL :26.98 m L -24.23 m

N12
FRL :26.87 m FRL :27.06 m L -20.00 m FRL :27.13 m L -20.00 m FRL :27.20 m L -20.00 m FRL :27.26 m L -20.00 m FRL :27.33 m FRL :27.40 m FRL :27.47 m FRL :27.54 m
B-0.60 x 0.75 m FRL :26.80 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.60 x 0.75 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m
IL :25.17 m B-0.60 x 0.45 m B-0.60 x 0.45 m B-0.60 x 0.45 m E11
IL :25.05 m 330 1/S IL :25.11 m 339 1/S 507 1/S IL :25.19 m IL :25.59 m IL :25.67 m IL :25.75 m B-0.45 x 0.45 m IL :25.81 m B-0.45 x 0.45 m IL :25.87 m IL :25.93 m 333 1/S IL :25.99 m 250 1/S IL :26.07 m ZONE 1

N18

N17
N16

N15
N14
N13
269 1/S 250 1/S 250 1/S 333 1/S 333 1/S
130 333 1/S E12
PLAN FROM CH:750 M TO CH:970 M E13
SM-A10(25.00 M) SECTOR -03 E14

MH-4260 MH-423
MH-1691 MH-1690 E15
MH-6019 MH-4952 FRL: 27.47 m FRL: 27.54 m
MH-2489 MH-2488 FRL: 27.33 m FRL: 27.40 m
MH-3655 MH-5393 FRL: 27.20 m FRL: 27.26 m Invert: 26.15 m E16
MH-918 MH-3656 FRL: 27.06 m FRL: 27.13 m Invert: 26.04 m Invert: 26.09 m
FRL: 26.92 m FRL: 26.99 m Invert: 25.88 m Invert: 25.99 m
FRL: 26.79 m FRL: 26.85 m Invert: 25.31 m Invert: 25.83 m
Invert: 25.16 m Invert: 25.22 m FRL
Invert: 25.04 m Invert: 25.09 m
28 Invert: 24.97 m GROUND LEVEL KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

CROWN
27

26
INVERT

25 SM-A10

24
Power(HDPE)
V=1:200

IL:22.50
23 Size:850x1720mm

H=1:1000
Datum:22

Depth of Invert 1.82 1.81 1.83 1.83 1.84 1.82 1.37 1.38 1.34 1.36 1.38 1.39

Ground Level 26.24 26.27 26.43 26.59 26.73 26.91 26.90 26.77 26.81 26.95 26.93 26.78

Length (Unified) (m) 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

FRL (m) 26.79 26.85 26.92 26.99 27.06 27.13 27.20 27.26 27.33 27.40 27.47 27.54

Invert (m) 24.97 25.04 25.09 25.16 25.22 25.31 25.76 25.83 25.88 25.92 25.99 26.04 26.09 26.15

Crown (m) 25.87 25.94 25.99 26.06 26.12 26.21 26.28 26.33 26.37 26.44 26.49 26.54 26.60 KEY PLAN OF SECTOR-3
Manhole No. MH-918 MH-3656 MH-3655 MH-5393 MH-2489 MH-2488 MH-6019 MH-4952 MH-1691 MH-1690 MH-4260 MH-423
LEGEND:
Slope (1/S) 286 400 308 308 222 286 400 286 400 400 333 333
STORM DRAIN WITH FLOW DIRECTION
Span x Rise (m) 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45
P-136 STORM DRAIN NUMBER
Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC L-30 STORM DRAIN LENGTH
Pipe no: (Label) P-4621 P-4620 P-4619 P-4618 P-4617 P-4616 P-4615 P-4614 P-4613 P-4612 P-4611 P-4610 B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
Chainage (m) 750 760 770 780 790 800 810 820 830 840 850 860 870 880 890 900 910 920 930 940 950 960 970 980
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

LONGITUDINAL SECTION (LHS) FROM CH:750 M TO CH:970 M STORM MAN HOLE

CATCH PIT

MH-4588 MH-1035 UTILITES


MH-2267 MH-2266
MH-3447 MH-5261 FRL: 27.47 m FRL: 27.54 m
MH-2924 MH-2923 FRL: 27.33 m FRL: 27.40 m
MH-37 MH-2615 MH-2614 FRL: 27.20 m FRL: 27.26 m Invert: 25.99 m Invert: 26.07 m STORM WATER
MH-38 FRL: 27.06 m FRL: 27.13 m Invert: 25.87 m Invert: 25.93 m
FRL: 26.87 m FRL: 26.94 m FRL: 26.98 m Invert: 25.75 m Invert: 25.81 m
FRL: 26.80 m Invert: 25.59 m Invert: 25.67 m POWER CONDUIT
Invert: 25.11 m Invert: 25.17 m Invert: 25.19 m
28 Invert: 25.05 m GROUND LEVEL FRL POTABLE WATER
REUSE WATER
27 CROWN SEWER NETWORK

26 LIST OF VILLAGES IN ZONE-1


TYPE OF ROAD
INVERT 1.NEKKALLU - NE
25
P-5923 P-5924
A- 25.00m ROW
IL-25.65 IL-25.64 2.SHAKAMURU - SM
B- 17.00m ROW
24
Power(HDPE)
Sewer(DWC-HDPE) C- 15.60m ROW
IL:22.50
IL:23.91 SM C 91
Size:850x1720mm
Size:200mm D- 12.00m ROW
23 ROAD NUMBER
V=1:200

TYPE OF ROAD (15.60)


VILLAGE NAME (SHAKAMURU)
Datum:22
H=1:1000
NOTES:
Depth of Invert 1.75 1.76 1.77 1.79 1.47 1.46 1.45 1.45 1.46 1.47 1.48 1.47 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Ground Level 26.24 26.27 26.46 26.54 26.72 26.88 26.96 26.78 26.78 26.93 26..93 26.80 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Length (Unified) (m) 20.00 20.00 10.05 24.23 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

FRL (m) 26.80 26.87 26.94 26.98 27.06 27.13 27.20 27.26 27.33 27.40 27.47 27.54

Invert (m) 25.05 25.11 25.17 25.19 25.50 25.59 25.67 25.75 25.81 25.87 25.93 25.99 26.07

Crown (m) 25.80 25.86 25.92 25.95 26.04 26.12 26.20 26.26 26.32 26.38 26.44 26.52

Manhole No. MH-38 MH-37 MH-2615 MH-2614 MH-2924 MH-2923 MH-3447 MH-5261 MH-2267 MH-2266 MH-4588 MH-1035

Slope (1/S) 330 339 507 269 250 250 333 333 333 333 250 286

Span x Rise (m) 0.60 x 0.75 0.60 x 0.75 0.60 x 0.75 0.60 x 0.45 0.60 x 0.45 0.60 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-4598 P-612 P-1402 P-4597 P-4596 P-4595 P-4594 P-4593 P-4592 P-4591 P-4590 P-4589

Chainage (m) 750 760 770 780 790 800 810 820 830 840 850 860 870 880 890 900 910 920 930 940 950 960 970

LONGITUDINAL SECTION (RHS) FROM CH:750 TO CH:970 M


PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:
EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 3
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 33 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
MH-423
B-0.45 x 0.45 m FRL :27.54 m
MH-422
FRL :27.61 m
IL :26.21 m
MH-5709
FRL :27.67 m
IL :26.26 m
MH-6166
FRL :27.74 m
N
IL :26.15 m IL :26.33 m
P-5824 PALA VAGU KR
CPL-105 E1 IS
P-4610 L -20.00 m HN
CPL-102 CPL-103
P-4609
CPL-104 P-1404 A
E2 RI
L -20.00 m L -20.00 m L -20.00 m B-0.60 x 0.90 m VE
R
B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m 690 1/S E3
333 1/S 400 1/S 286 1/S E4

1000

1010

1020

1030

1040
960

970

980

990
E5
MH-1215 CPL-159
E6
FRL :27.75 m

GUNTUR VIJAYAWADA
E7
CPR-104 CPR-105 CPR-106 CPR-107 IL :25.20 m
E8

P-5823 E9
P-4589 MH-1034 MH-5448 P-1403 MH-5447 L -20.00 m
MH-1035 P-4588 E10
L -20.00 m L -20.00 m

N12
FRL :27.54 m B-0.45 x 0.45 m
FRL :27.61 m L -20.00 m FRL :27.67 m FRL :27.74 m B-0.60 x 0.90 m
B-0.45 x 0.45 m E11
IL :26.07 m 286 1/S IL :26.14 m B-0.45 x 0.45 m
IL :26.21 m IL :26.27 m 667 1/S ZONE 1

N18

N17
N16

N15
N14
N13
286 1/S 333 1/S E12
PLAN FROM CH:960 M TO CH:1020 M E13
SM-A10(25.00 M) SECTOR -03 E14

MH-5709 MH-6166
MH-423 MH-422 E15
FRL: 27.67 m FRL: 27.74 m
FRL: 27.54 m FRL: 27.61 m E16
Invert: 26.26 m Invert: 26.33 m
Invert: 26.15 m Invert: 26.21 m

28 KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

27

26

SM-A10
25

24

V=1:200
23

H=1:1000
Datum:22

Depth of Invert 1.39 1.40 1.41 1.41

Ground Level 26.78 26.56 26.71 27.00

Length (Unified) (m) 20.00 20.00 20.00

FRL (m) 27.54 27.61 27.67 27.74

Invert (m) 26.15 26.21 26.26 26.33

Crown (m) 26.60 26.66 26.71 26.78


KEY PLAN OF SECTOR-3

Manhole No. MH-423 MH-422 MH-5709 MH-6166 LEGEND:

Slope (1/S) 333 400 286 STORM DRAIN WITH FLOW DIRECTION

Span x Rise (m) 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 P-136 STORM DRAIN NUMBER
L-30 STORM DRAIN LENGTH
Type of Material RCC RCC RCC
B-0.60x0.60 STORM DRAIN SPAN x RISE
Pipe no: (Label) P-4610 P-4609 P-1404 S-150 STORM DRAIN SLOPE
Chainage (m) 960 970 980 990 1000 1010 1020 CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

STORM MAN HOLE


LONGITUDINAL SECTION (LHS) FROM CH:960 M TO CH:1020 M
CATCH PIT

MH-5448 MH-5447
MH-1035 MH-1034
FRL: 27.67 m FRL: 27.74 m
FRL: 27.54 m FRL: 27.61 m UTILITES
Invert: 26.21 m Invert: 26.27 m
Invert: 26.07 m Invert: 26.14 m
STORM WATER

28 POWER CONDUIT
POTABLE WATER

27 REUSE WATER
SEWER NETWORK

26
LIST OF VILLAGES IN ZONE-1
TYPE OF ROAD
25 1.NEKKALLU - NE
A- 25.00m ROW
2.SHAKAMURU - SM
24 B- 17.00m ROW
C- 15.60m ROW
SM C 91
23 D- 12.00m ROW
V=1:200

ROAD NUMBER
TYPE OF ROAD (15.60)
Datum:22 VILLAGE NAME (SHAKAMURU)
H=1:1000
NOTES:
Depth of Invert 1.47 1.47 1.46 1.47
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Ground Level 26.80 26.50 26.70 26.98
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Length (Unified) (m) 20.00 20.00 20.00

FRL (m) 27.54 27.61 27.67 27.74

Invert (m) 26.07 26.14 26.21 26.27

Crown (m) 26.52 26.59 26.66 26.72

Manhole No. MH-1035 MH-1034 MH-5448 MH-5447

Slope (1/S) 286 286 333

Span x Rise (m) 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45

Type of Material RCC RCC RCC

Pipe no: (Label) P-4589 P-4588 P-1403

Chainage (m) 960 970 980 990 1000 1010 1020

LONGITUDINAL SECTION (RHS) FROM CH:960 TO CH:1020 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 4
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 34 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
P-1122
7+500L -22.50 m MH-5293
P-4643
L -22.95 m
MH-3144
FRL :26.64 m
P-4642
L -20.00 m MH-3143
P-4641
L -20.00 m MH-5086
FRL :26.78 m
P-4640
L -20.00 m MH-2063
P-4639
L -20.00 m MH-2062
P-4638
L -20.00 m MH-4476
FRL :27.01 m
P-4637
L -20.00 m MH-4122
P-4636
L -20.00 m MH-1268
FRL :27.15 m
P-4635
L -20.00 m MH-1267
P-4634
L -20.00 m MH-1782 N
FRL :26.55 m B-0.45 x 0.75 m B-0.45 x 0.60 m FRL :26.71 m B-0.45 x 0.60 m B-0.45 x 0.60 m FRL :26.86 m B-0.45 x 0.60 m FRL :26.93 m B-0.45 x 0.60 m B-0.45 x 0.45 m FRL :27.08 m B-0.45 x 0.45 m B-0.45 x 0.45 m FRL :27.23 m B-0.45 x 0.45 m FRL :27.30 m
B-0.75 x 0.90 m IL :24.84 m
IL :23.97 m 459 1/S 182 1/S IL :25.10 m 222 1/S IL :25.19 m IL :25.27 m IL :25.34 m 667 1/S IL :25.37 m 333 1/S IL :25.58 m 333 1/S IL :25.64 m 250 1/S IL :25.72 m 286 1/S IL :25.79 m PALA VAGU KR
375 1/S 250 1/S 286 1/S E1 IS
HN
CPL-113 A
CPL-112 E2 RI
VE
MH-5927 P-1511
CPL-106 CPL-107 CPL-108 CPL-109 CPL-110 CPL-111 CPL-114 CPL-115 CPL-116
R
E3
FRL :26.24 m L -9.20 m
92 100 108 E4
IL :23.61 m B-0.60 x 0.90 m

100

110

120

130

140

150

160

170

180

190

200

210
10

20

30

40

50

60

70

80

90
CPR-108 CPR-111 CPR-112 CPR-114 CPR-115 CPR-117

0
CPR-109 CPR-110 CPR-113
153 1/S CPR-116 E5
P-5926
E6
L -36.06 m

GUNTUR VIJAYAWADA
P-950 P-382 P-1098
P-1097 MH-184 P-1096
MH-3964 P-4633 MH-3963
B-0.60 x 0.75 m E7
B-1.20 x 1.20 m MH-5292 MH-202 L -9.20 m MH-201 P-4670 MH-4330 P-1099 MH-4330 L -9.20 m
MH-4857 P-5837 MH-1501 L -9.20 m
L -25.20 m
L -22.13 m
1,849 1/S FRL: 26.55 m FRL :26.64 m B-0.60 x 0.90 m FRL :26.65 m L -33.50 m FRL :26.89 m L -22.90 m FRL :26.89 m B-0.60 x 0.90 m FRL :26.95 m L -28.05 m FRL: 27.02 m L -28.35 m FRL :27.06 m B-0.60 x100
0.75 m FRL :27.17 m L -37.35 m FRL :27.30 m E8
Invert: 24.03 m B-0.60 x 0.90 m 90
307 1/S B-0.60 x 0.90 m IL :25.24 m 153 1/S B-0.60 x 0.75 m IL :25.58 m
IL :24.09 m 184 1/S IL :24.14 m B-0.60 x 0.90 m IL :25.09 m B-0.60 x 0.90 m IL :25.09 m IL :25.12 m B-0.60 x 0.90 m Invert: 25.17 m IL :25.45 m
420 1/S 80 405 1/S 287 1/S
E9
479 1/S 254 1/S 333 1/S 561 1/S
E10

N12
PLAN FROM CH:0 M TO CH:220 M E11
ZONE 1

N18

N17
N16

N15
N14
N13
SM-C33(15.60 M) E12

E13

MH-1267 MH-1782 SECTOR -03 E14


MH-4122 MH-1268
MH-2062 MH-4476 FRL: 27.23 m FRL: 27.30 m
MH-5086 MH-2063 FRL: 27.08 m FRL: 27.15 m E15
MH-3144 MH-3143 FRL: 26.93 m FRL: 27.01 m Invert: 25.72 m Invert: 25.79 m
MH-5293 FRL: 26.78 m FRL: 26.86 m Invert: 25.58 m Invert: 25.64 m
FRL: 26.64 m FRL: 26.71 m Invert: 25.34 m Invert: 25.37 m E16
28 MH-5927 FRL: 26.55 m Invert: 25.19 m Invert: 25.27 m
Invert: 24.84 m Invert: 25.10 m
FRL: 26.24 m Invert: 23.97 m
Invert: 23.61 m
FRL
KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1
GROUND LEVEL
27

26
CROWN
25 SM-C33
P-5925
IL-24.07
Power(HDPE)
24 IL:23.12
Size:850x1720mm
V=1:200

P-5926 P-1511
INVERT
IL-23.61 IL-23.97
Datum:23

H=1:1000 Power(HDPE)
IL:23.00
Size:850x1720mm

Depth of Invert 2.63 2.58 1.80 1.61 1.59 1.59 1.59 1.64 1.50 1.51 1.51 1.51

Ground Level 26.43 25.84 25.73 25.76 25.83 25.94 26.05 26.14 26.23 26.35 26.39 26.49

Length (Unified) (m) 22.50 22.95 20.00 20.00 20.00 20.00 20.00 20..00 36.03 20.00 20.00 20.00

FRL (m) 26.24 26.55 26.64 26.71 26.78 26.86 26.93 27.01 27.08 27.15 27.23 27.30

Pipe IL (m) 23.91 23.97 24.79 24.84 24.99 25.10 25.19 25.27 25.34 25.37 25.52 25.58 25.64 25.72 25.79

25.70 25.79 25.94 25.97 26.09


Crown (m) 24.81 24.87 25.54 25.69 25.87 26.03 26.17 26.24 KEY PLAN OF SECTOR-3
Manhole No. MH-5927 MH-5293 MH-3144 MH-5086 MH-2063 MH-2062 MH-4476 MH-4122 MH-1268 MH-1267 MH-1782
MH-3143 LEGEND:
Slope (1/S) 375 459 182 222 250 286 667 333 333 250 286 333
STORM DRAIN WITH FLOW DIRECTION
Span X Rise 0.75 x 0.90 0.45 x 0.75 0.45 x 0.60 0.45 x 0.60 0.45 x 0.60 0.45 x 0.60 0.45 x 0.60 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 P-136 STORM DRAIN NUMBER
Type of Material RCC RCC RCC RCC RCC RCC L-30 STORM DRAIN LENGTH
RCC RCC RCC RCC RCC RCC
P-4640 B-0.60x0.60 STORM DRAIN SPAN x RISE
Pipe no: (Label) P-1122 P-4643 P-4642 P-4641 P-4639 P-4638 P-4637 P-4636 P-4635 P-4634 P-1123
S-150 STORM DRAIN SLOPE
Chainage (m) -17 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

STORM MAN HOLE


LONGITUDINAL SECTION (LHS) FROM CH:0 M TO CH:220 M
CATCH PIT

MH-3963
MH-184 MH-3964
MH-4857 MH-1501 FRL: 27.30 m UTILITES
MH-5785 MH-4330 FRL: 27.17 m
MH-202 MH-201 FRL: 26.95 m FRL: 27.02 m FRL: 27.06 m Invert: 25.58 m
MH-5293 MH-5292 FRL: 26.80 m FRL: 26.89 m Invert: 25.45 m STORM WATER
FRL: 26.64 m FRL: 26.65 m Invert: 25.12 m Invert: 25.17 m Invert: 25.24 m
28 FRL: 26.55 m FRL: 26.55 m Invert: 25.00 m Invert: 25.09 m
Invert: 23.97 m Invert: 24.03 m Invert: 24.09 m Invert: 24.14 m POWER CONDUIT
FRL POTABLE WATER
GROUND LEVEL
27 REUSE WATER
CROWN SEWER NETWORK
26
LIST OF VILLAGES IN ZONE-1
TYPE OF ROAD
25 P-4667 P-4657 1.NEKKALLU - NE
Sewer(DWC-HDPE) P-4669 P-4646
P-4643 P-4674 P-4672 IL-25.69
IL:25.36 INVERT IL-25.54 IL-25.57
IL-24.79 Size:200mm IL-25.26 IL-25.38 IL-25.45 A- 25.00m ROW
Power(HDPE) Power(HDPE)
2.SHAKAMURU - SM
24 IL:23.12 IL:23.00
B- 17.00m ROW
Sewer(DWC-HDPE)
V=1:200

P-1122 Size:850x1720mm IL:24.58 Size:850x1720mm C- 15.60m ROW


IL-23.97 Size:200mm SM C 91
Datum:23 D- 12.00m ROW
ROAD NUMBER
H=1:1000 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
Depth of Invert 2.58 2.52 2.55 2.51 1.80 1.80 1.83 1.85 1.82 1.72 1.72

Ground Level 25.84 25.74 25.74 25.76 25.90 26.00 26.08 26.19 26.35 26.37 26.54 NOTES:

1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED


Length (Unified) (m) 9.20 25.20 9.20 33.50 22.90 9.20 28.05 28.35 9.20 37.35 22.13
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
FRL (m) 26.55 26.55 26.64 26.65 26.80 26.89 26.95 27.02 27.06 27.17 27.30

Invert (m) 23.97 24.03 24.14 24.93 25.00 25.09 25.12 25.17 25.24 25.39 25.45 25.58

Crown (m) 24.87 24.93 24.99 25.83 25.90 25.99 26.02 26.07 26.14 26.20 26.33

Manhole No. MH-5293 MH-5292 MH-202 MH-201 MH-5785 MH-4330 MH-4857 MH-1501 MH-184 MH-3964 MH-3963

Slope (1/S) 153 420 184 479 254 307 561 405 153 287 369

Span x Rise (m) 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.60 x 0.90 0.6 x 0.75 0.6 x 0.75 0.60 x 0.75

Type of Material RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-1511 P-950 P-382 P-4670 P-1099 P-1098 P-5837 P-1097 P-1096 P-4633 P-1093

Chainage (m) 5 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

LONGITUDINAL SECTION (RHS) FROM CH:5 TO CH:230 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 5
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 35 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
N
CPL-211 CPL-157

P-1124 P-4572 P-4571 P-4570 P-384 P-640 P-4565 P-4566 P-4567


MH-3914 MH-3913 MH-5531 MH-2771 P-4569
MH-2770 MH-5455 MH-3943 MH-1982 MH-1983 MH-2450 MH-2326
MH-1781 L -15.70
100 m FRL :27.41 m
L -31.90 m
FRL :27.55 m
L -20.00 m
FRL :27.63 m
L -20.00 m
FRL :27.70 m
L -20.00 m
FRL :27.77 m
L -20.00 m
FRL :27.85 m FRL :27.91 m B-0.45 x 0.45 m FRL :27.98 m
L -20.00 m
FRL :28.05 m
L -20.00 m
FRL :28.13 m
L -33.25 m
FRL :28.25 m
FRL :27.37 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m L -20.00 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.45 x 0.45 m P-619
IL :25.90 m IL :26.02 m IL :26.11 m IL :26.17 m 369 1/S IL :26.23 m 383 1/S IL :26.28 m IL :26.24 m IL :26.15 m IL :26.06 m IL :25.98 m IL :25.74 m PALA VAGU KR
IL :25.85 m 314 1/S 266 1/S 222 1/S 319 1/S 227 1/S 227 1/S 227 1/S 387 1/S L -17.40 m E1 IS
HN
333 1/S
CPL-117
CPL-118 CPL-126 CPL-128 B-0.60 x 0.90 m E2
A
RI
CPL-119 CPL-120 CPL-121 CPL-122 CPL-123 CPL-124 CPL-125 CPL-127 VE
B-0.45 x 0.45 m MH-3369 P-1510 580 1/S R
E3
L -20.00 m
124 FRL :27.89 m 108 115 L -9.20 m
P-1123
90 IL :26.52 m B-0.75 x 0.60 m E4

220

230

240

250

260

270

280

290

300

310

320

330

340

350

360

370

380

390

400

410

420

430

440

450

460

470
CPR-120 CPR-121 CPR-122 CPR-123 CPR-124 CPR-125 CPR-127
263 1/S
CPR-118 CPR-119 CPR-126 CPR-128 CPR-129 CPR-130
E5
120 110
CPL-156
E6
P-1094 P-4558 MH-2230 P-1102 P-1100
B-0.60 x 0.75 m
MH-192 MH-191 P-4581 P-1095 MH-1812 P-1091
MH-5735 P-4568 MH-5830 P-381 P-383
MH-3317 P-1121 P-1101 MH-2327 MH-4572

GUNTUR VIJAYAWADA
L -22.13 m L -10.05 m
L -9.20 m
MH-5829 100
L -10.05 m FRL :28.13 m L -9.20 m MH-2231 E7
L -33.85 m FRL: 28.25 m L -17.47 m
FRL :27.38 m L -34.78 m L -20.00 m
B-0.45 x 0.75 m FRL :27.42 m L -22.60 m FRL :27.67 m B-0.45 x 0.45 m FRL :27.66 m L -28.85 m FRL :27.77 m FRL :27.85 m B-0.45 x 0.45 m FRL :27.90 m L -23.53 m B-0.90 x 0.60 m FRL :28.15 m L -25.20 m FRL :28.09 m
B-0.45 x 0.45 m IL :25.67 m
B-0.75 x 0.60 m Invert: 25.31 B-0.90 x 0.90 m
IL :25.64 m 201 1/S B-0.45 x 0.60 m B-0.45 x 0.45 m B-0.60 x 0.60 m
IL :25.69 m IL :26.17 m 206 1/S IL :26.21 m B-0.45 x 0.45 m IL :26.28 m 317 1/S IL :26.34 m
437 1/S
IL :25.74 m 420 1/S IL :25.49 m B-0.90 x 0.75 m IL :25.29 m E8
80 832 1/S
435 1/S 226 1/S 458 1/S 784 1/S 736 1/S m
1,318 1/S 813 1/S E9
PLAN FROM CH:220 M TO CH:470 M E10

N12
SM-C33(15.60 M) ZONE 1 E11

N18

N17
N16

N15
N14
N13
E12

E13
SECTOR -03 E14
MH-2771 MH-2770
MH-3913 MH-5531 MH-5455 E15
MH-1781 MH-3914 FRL: 27.70 m FRL: 27.77 m
FRL: 27.55 m FRL: 27.63 m FRL: 27.85 m
FRL: 27.37 m FRL: 27.41 m Invert: 26.17 m Invert: 26.23 m E16
Invert: 26.02 m Invert: 26.11 m Invert: 26.28 m
Invert: 25.79 m Invert: 25.85 m Invert: 25.90 m
FRL
28 KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

GROUND LEVEL
CROWN MH-2326 MH-2327
MH-1983 MH-2450
27 MH-3943 MH-1982 FRL: 28.25 m FRL: 28.25 m
FRL: 28.05 m FRL: 28.13 m
FRL: 27.91 m FRL: 27.98 m Invert: 25.74 m Invert: 25.31 m
Invert: 26.06 m Invert: 25.98 m
Invert: 26.24 m Invert: 26.15 m
26 29
FRL
INVERT GROUND LEVEL SM-C33
25 28
Sewer(DWC-HDPE)
IL:24.60 CROWN
Size:200mm 27
24

V=1:200
V=1:200

P-1101
26 IL-25.46
Datum:23
INVERT
H=1:1000
H=1:1000 Power(HDPE) Power(HDPE)
IL:23.00 Datum:25 IL : 24.50 P-1100
Size:850x1720mm Size:850x1230mm
IL-25.31

Depth of Invert 1.52 1.51 1.53 1.52 1.53 1.55 1.57 Depth of Invert 1.67 1.83 1.99 2.15 2.51 2.55
0
Ground Level 27.20 27.22 27.17 27.42 27.51
Ground Level 26.56 26.57 26.58 26.66 26.81 26.99 27.16 27.48

Length (Unified) (m) 20.00 15.70 31.90 20..00 20.00 20.00 20.00 Length (Unified) (m) 20.00 20.00 20.00 33.25 9.20

FRL (m) 27.37 27.41 27.55 27.63 27.77 27.85 FRL (m) 27.91 27.98 28.05 28.13 28.25 28.25
27.70
Pipe IL (m) 25.85 25.90 26.02 26.11 26.23 26.28 Pipe IL (m) 26.24 26.15 26.06 25.98 25.89 25.74 25.71
26.17
Crown (m) 26.30 26.35 26.47 26.56 26.68 26.73 Crown (m) 26.69 26.60 26.51 26.43 26.34 26.31
26.62
Manhole No. MH-3943 MH-1982 MH-1983 MH-2450 MH-2326 MH-2327
KEY PLAN OF SECTOR-3
Manhole No. MH-1781 MH-3914 MH-406 MH-5531 MH-2770 MH-5455
MH-2771
Slope (1/S) Slope (1/S) 227 227 227 387 263 LEGEND:
333 314 266 222 319 369 383

Span X Rise 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 Span X Rise 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.75 X 0.60 STORM DRAIN WITH FLOW DIRECTION

Type of Material Type of Material RCC RCC RCC RCC RCC RCC P-136 STORM DRAIN NUMBER
RCC RCC RCC RCC RCC RCC RCC
Pipe no: (Label) Pipe no: (Label) P-640 P-4565 P-4566 P-4567 P-1510 L-30 STORM DRAIN LENGTH
P-1123 P-1124 P-4572 P-4571 P-4570 P-4569 P-384
Chainage (m) 370 380 390 400 410 420 430 440 450 460 469.500 B-0.60x0.60 STORM DRAIN SPAN x RISE
Chainage (m) -17
220 230 240 250 260 270 280 290 300 310 320 330 340 350 360
S-150 STORM DRAIN SLOPE

LONGITUDINAL SECTION (LHS) FROM CH:220 M TO CH:360 M LONGITUDINAL SECTION (LHS) FROM CH:370 M TO CH:470 M CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT

STORM MAN HOLE

CATCH PIT

MH-5830 MH-5829 UTILITES


MH-4144 MH-1812 MH-5735
MH-191 FRL: 27.77 m FRL: 27.85 m
MH-192 FRL: 27.67 m FRL: 27.66 m MH-2327 STORM WATER
FRL: 27.42 m FRL: 27.55 m Invert: 26.28 m Invert: 26.34 m MH-2230 MH-2231 MH-4572
FRL: 27.38 m Invert: 26.17 m Invert: 26.21 m MH-3369 MH-3317 MH-4312 FRL: 28.25 m
Invert: 25.69 m Invert: 25.92 m FRL: 28.13 m FRL: 28.15 m FRL: 28.09 m
Invert: 25.64 m FRL: 27.89 m FRL: 27.90 m FRL: 28.00 m Invert: 25.31 m POWER CONDUIT
Invert: 25.67 m Invert: 25.49 m Invert: 25.29 m
FRL Invert: 26.52 m Invert: 25.74 m Invert: 25.71 m
28 29 POTABLE WATER
FRL
GROUND LEVEL REUSE WATER
CROWN P-4580 GROUND LEVEL
27 28 SEWER NETWORK
IL-26.17

27 P-4557 CROWN LIST OF VILLAGES IN ZONE-1


26 P-4576 P-4549
Sewer(DWC-HDPE) IL-26.46
IL-26.21 IL-26.01 TYPE OF ROAD
P-4587 P-4584 IL:25.72
INVERT
Size:200mm P-4561
1.NEKKALLU - NE
IL-25.94 IL-25.99 26 P-4564
25
Sewer(DWC-HDPE) Power(HDPE) IL-26.64
IL-26.50 A- 25.00m ROW
P-4554 2.SHAKAMURU - SM
V=1:200
IL:25.00 IL : 24.00 Sewer(DWC-HDPE)
Size:200mm Size:850x1230mm IL-26.52 INVERT Sewer(DWC-HDPE) P-1510
B- 17.00m ROW
Datum:25 IL:25.83 IL:26.71
24 Size:200mm Power(HDPE) Size:200mm IL-25.71 P-619 C- 15.60m ROW
V=1:200

H=1:1000
IL : 24.00
IL-25.29
SM C 91
Size:850x1230mm D- 12.00m ROW
Datum:23
ROAD NUMBER
Depth of Invert 1.37 2.16 2.29 2.46 2.66 2.94 2.80 TYPE OF ROAD (15.60)
H=1:1000
Ground Level 27.19 27.21 27.22 27.50 27.19 27.48 27.09
VILLAGE NAME (SHAKAMURU)
Depth of Invert 1.74 1.73 1.63 1.50 1.45 1.49 1.51
Length (Unified) (m) 10.05 23.53 33.85 0 25.20 17.47 NOTES:
Ground Level 26.57 26.58 26.61 26.74 26.81 27.07 27.20
FRL (m) 27.89 27.90 28.00 28.13 28.15 28.25 28.09 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Length (Unified) (m) 10.05 34.78 22.60 9.20 28.85 20.00
Invert (m) 26.50 25.74 25.71 25.67 25.49 25.31 25.29 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
FRL (m) 27.38 27.42 27.55 27.67 27.66 27.77 27.85
Crown (m) 26.95 26.34 26.31 26.27 26.24 26.21 26.19
Invert (m) 25.64 25.69 25.84 25.92 26.07 26.17 26.21 26.28 26.34
Manhole No. MH-3369 MH-3317 MH-4312 MH-2230 MH-2231 MH-2327 MH-4572
Crown (m) 26.39 26.44 26.52 26.62 26.66 26.73 26.79
Slope (1/S) 437 784 736 420 813 832
Manhole No. MH-192 MH-191 MH-4144 MH-1812 MH-5735 MH-5830 MH-5829
Span x Rise (m) 0.45 x 0.45 0.60 x 0.60 0.75 x 0.60 0.90 x 0.60 0.90 x 0.75 0.90 x 0.90
Slope (1/S) 201 435 226 206 458 317
Type of Material RCC RCC RCC RCC RCC RCC
Span x Rise (m) 0.45 x 0.75 0.45 x 0.60 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45 0.45 x 0.45
Pipe no: (Label) P-383 P-1121 P-4558 P-1102 P-1101 P-1100
Type of Material RCC RCC RCC RCC RCC RCC
Chainage (m) 363 370 380 390 400 410 420 430 440 450 460 469.500
Pipe no: (Label) P-1094 P-4581 P-1095 P-1091 P-4568 P-381

Chainage (m) 240 250 260 270 280 290 300 310 320 330 340 350 360
LONGITUDINAL SECTION (RHS) FROM CH:363 TO CH:470 M
LONGITUDINAL SECTION (RHS) FROM CH:240 TO CH:360 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 6
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 36 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
P-4544
MH-2538
P-4550
P-570
L -20.00 m MH-430
N
FRL :28.24 m
P-4543 MH-2537 L -38.41 m L -31.11 m MH-357 B-0.45 x 0.45 m FRL :28.01 m
P-1428 IL :26.56 m PALA VAGU KR
P-1328 MH-1112 L -20.00 m FRL :28.38 m B-0.45 x 0.45 m MH-358 B-0.45 x 0.45 m FRL :28.07 m 128 1/S IL :26.54 m E1 IS
L -20.97 m MH-5915 HN
MH-1111 L -20.00 m FRL :28.46 m B-0.45 x 0.45 m IL :26.66 m FRL :28.18 m 258 1/S IL :26.39 m A

540
B-0.45 x 0.45 m FRL :28.56 m 357 1/S E2 RI

530
VE
FRL :28.53 m B-0.45 x 0.45 m IL :26.77 m 198 1/S IL :26.27 m

520
CPR-148 R
78 1/S IL :27.07 m CPR-145

600
MH-4968 E3

590
510
P-1512

580
IL :26.88 m CPR-146

500
175 1/S

570
FRL :28.58 m P-525

560
490
CPR-149 L -10.10 m MH-996
0 E4

480

550
IL :26.80 m P-4551 MH-997 L -20.00 m

470
CPR-150 B-0.45 x 0.45 m CPR-147 FRL :28.01 m
P-4545 E5

460
B-0.45 x 0.45 m

450
CPR-152 CPR-151 P-1427 MH-4266 238 1/S P-1513 L -31.11 m FRL :28.10 m
CPR-151 0 L -20.00 m CPL-146 CPL-143 IL :26.50 m

440
132 1/S E6
CPL-151 L -10.13 m B-0.45 x 0.45 m
L -20.00 m FRL :28.49 m B-0.45 x 0.45 m CPL-144IL :26.35 m

GUNTUR VIJAYAWADA
P-1411 CPL-147

430
544 1/S E7
B-0.45 x 0.45 m IL :26.76 m B-0.45 x 0.45 m
L -10.25 m 217 1/S MH-5069 CPL-145 MH-3060
222 1/S CPL-148 418 1/S E8
B-0.45 x 0.45 m P-4546 FRL :28.28 m FRL :27.88 m
10
CPL-150 CPL-149 L -37.15 m IL :26.60 m 0
MH-4229 E9
513 1/S MH-5414 IL :26.49 m
B-0.45 x 0.45 m FRL :28.22 m E10

N12
MH-5700 MH-4265 FRL :28.41 m
CPL-152
P-527
10
IL :26.67 m
544 1/S MH-4113
CPR-200 PLAN FROM CH:548 M TO CH:610 M ZONE 1 E11
FRL :28.57 m FRL :28.56 m MH-2674

N18

N17
N16

N15
N14
N13
MH-1711 MH-6151 CPL-194 FRL :28.09 m
L -23.72 m IL :27.00 m IL :26.85 m FRL :28.37 m FRL :28.37 m IL :26.62 m UN-B10(17.00 M) E12
FRL :28.65 m B-0.45 x 0.45 m E13
IL :26.91 m IL :26.83 m SECTOR -03
IL :26.40 m 40 1/S 10 E14

PLAN FROM CH:430 M TO CH:450 M PLAN FROM CH:450 M TO CH:540 M E15

E16
UN-B10(17.00 M) UN-B10(17.00 M)
KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

MH-4968 MH-5915 MH-358


MH-1111 MH-357 MH-430
FRL: 28.58 m FRL FRL: 28.56 m MH-1112 MH-2537 FRL: 28.18 m
FRL: 28.53 m MH-2538 FRL: 28.07 m
Invert: 26.80 m GROUND LEVEL Invert: 27.07 m FRL: 28.46 m FRL: 28.38 m Invert: 26.27 m FRL
FRL: 28.01 m
Invert: 26.88 m Invert: 26.77 m FRL FRL: 28.24 m Invert: 26.39 m Invert: 26.54 m UN-B10
CROWN Invert: 26.66 m 29 GROUND LEVEL
GROUND LEVEL Invert: 26.56 m
29 CROWN
29 CROWN
INVERT
28 INVERT
INVERT
28
28

V=1:200
V=1:200

V=1:200
27
27
27
H=1:1000
H=1:1000 P-1411
Datum:26 P-1513 & P-1302
IL-26.80 H=1:1000
Datum:26 P-1512 & P-1303
Datum:26 IL-26.27
IL-26.56
Depth of Invert 1.91 1.68 1.47
Depth of Invert 1.78 1.49 Depth of Invert 1.65 1.69 1.72 1.68
Ground Level 27.54 27.35 27.16
Ground Level 27.88 27.89 Ground Level 27.90 27.72 27.31 27.54
Length (Unified) (m) 31.11 20.00
Length (Unified) (m) 20.97 Length (Unified) (m) 20.00 20.00 38.41 28.18 28.07 28.01
FRL (m)
FRL (m) 28.58 28.56 FRL (m) 28.53 28.46 28.38 28.24
Pipe IL (m) 26.27 26.39 26.54
Pipe IL (m) 26.80 27.07 Pipe IL (m) 26.88 26.77 26.66 26.56
Crown (m) 26.72 26.84 26.99
Crown (m) 27.25 27.52 Crown (m) 27.33 27.22 27.11 27.01 KEY PLAN OF SECTOR-3
Manhole No. MH-358 MH-357 MH-430
Manhole No. MH-4968 MH-5915 Manhole No. MH-1111 MH-1112 MH-2537 MH-2538 LEGEND:
Slope (Calculated) (1/S) 258 128
Slope (Calculated) (1/S) 78 Slope (Calculated) (1/S) 175 198 357 STORM DRAIN WITH FLOW DIRECTION
Span x Rise(m) 0.45 X 0.45 0.45 X 0.45
Span x Rise(m) 0.45 X 0.45 Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 P-136 STORM DRAIN NUMBER
Type of Material RCC RCC
L-30 STORM DRAIN LENGTH
Type of Material RCC Type of Material RCC RCC RCC
Pipe no: (Label) P-4550 P-570 B-0.60x0.60 STORM DRAIN SPAN x RISE
Pipe no: (Label) P-1428 Pipe no: (Label) P-1328 P-4543 P-4544 S-150 STORM DRAIN SLOPE
Chainage (m) 548550 560 570 580 590 600 610
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Chainage (m) 426 430 440 447 Chainage (m) 456 460 470 480 490 500 510 520 530 540

LONGITUDINAL SECTION (LHS) FROM CH:548 M TO CH:610 M STORM MAN HOLE


LONGITUDINAL SECTION (LHS) FROM CH:430 M TO CH:450 M LONGITUDINAL SECTION (LHS) FROM CH:450 M TO CH:540 M
CATCH PIT

MH-1711 MH-4265 MH-4266 UTILITES


MH-5700 MH-5414
FRL: 28.56 m FRL: 28.49 m MH-5069 MH-4229
FRL: 28.65 m FRL: 28.57 m FRL: 28.41 m MH-997 STORM WATER
Invert: 26.85 m Invert: 26.76 m FRL: 28.28 m FRL: 28.22 m MH-996
Invert: 26.40 m Invert: 27.00 m Invert: 26.67 m FRL: 28.10 m
Invert: 26.60 m Invert: 26.29 m FRL: 28.01 m
Invert: 26.35 m POWER CONDUIT
FRL FRL Invert: 26.50 m
29 29 POTABLE WATER
29 FRL
GROUND LEVEL GROUND LEVEL GROUND LEVEL REUSE WATER

28 SEWER NETWORK
CROWN 28
28 CROWN
V=1:200

V=1:200
P-1411 CROWN
V=1:200

LIST OF VILLAGES IN ZONE-1


IL-26.78 27 27
27 TYPE OF ROAD
1.NEKKALLU - NE
H=1:1000 P-1512 H=1:1000
H=1:1000 INVERT INVERT A- 25.00m ROW
Datum:26 IL-26.60 Datum:26 P-1513 2.SHAKAMURU - SM
Datum:26 P-1410 INVERT
IL-26.40 IL-26.29 B- 17.00m ROW
2.25 1.58 1.71 1.73 1.75 1.68 1.93 1.75 1.51 C- 15.60m ROW
Depth of Invert Depth of Invert Depth of Invert SM C 91
D- 12.00m ROW
Ground Level Ground Level Ground Level
ROAD NUMBER
27.88 27.91 27.90 27.62 27.26 27.54 27.54 27.35 27.16
TYPE OF ROAD (15.60)
Length (Unified) (m) 23.72 Length (Unified) (m) 20.00 20.00 37.15 Length (Unified) (m) 31.11 20.00 VILLAGE NAME (SHAKAMURU)

FRL (m) 28.65 28.57 FRL (m) 28.56 28.49 28.41 28.28 FRL (m) 28.22 28.10 28.01 NOTES:

Pipe IL (m) 26.40 27.00 Pipe IL (m) 26.85 26.76 26.67 26.60 Pipe IL (m) 26.29 26.35 26.50 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED

26.85 27.45 27.30 27.21 27.12 27.05 26.74 26.80 26.95 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Crown (m) Crown (m) Crown (m)

Manhole No. MH-1711 MH-5700 Manhole No. MH-4265 MH-4266 MH-5414 MH-5069 Manhole No. MH-4229 MH-997 MH-996

Slope (Calculated) (1/S) 40 Slope (Calculated) (1/S) 221 217 544 Slope (Calculated) (1/S) 544 132

Span x Rise(m) 0.45 X 0.45 Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 Span x Rise(m) 0.45 X 0.45 0.45 X 0.45

Type of Material RCC Type of Material RCC RCC RCC Type of Material RCC RCC

Pipe no: (Label) P-527 Pipe no: (Label) P-1427 P-4545 P-4546 Pipe no: (Label) P-4551 P-525

Chainage (m) 426 430 440 450 Chainage (m) 455 460 470 480 490 500 510 520 530 540 Chainage (m) 548550 560 570 580 590 600 610

LONGITUDINAL SECTION (RHS) FROM CH:426 TO CH:450 M LONGITUDINAL SECTION (RHS) FROM CH:450 TO CH:540 M LONGITUDINAL SECTION (RHS) FROM CH:548 TO CH:610 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 7
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 37 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
MH-5554
P-572
L -19.99 m
MH-2382
FRL :27.85 m
P-4651
L -19.98 m MH-2383
FRL :27.80 m
P-4652
L -19.98 m MH-5323
P-4653
L -20.00 m MH-2590 P-4654
N
FRL :27.92 m B-0.45 x 0.45 m B-0.45 x 0.45 m B-0.75 x 0.90 m FRL :27.79 m
IL :26.34 m IL :25.80 m B-0.75 x 0.90 m FRL :27.79 m L -37.43 m
IL :26.43 m 222 1/S 222 1/S 1,998 1/S IL :25.79 m MH-2591 PALA VAGU KR
2,000 1/S IL :25.78 m B-0.75 x 0.90 m E1
FRL :27.87 m
IS
HN
3,743 1/S A
IL :25.77 m E2 RI
VE
CPR-143 CPR-142

650

660
640

670
630
CPR-141 R

680
CPR-144

620

690
E3
CPR-140

700

710
E4

720
P-1118

730
CPL-141 CPL-140 CPR-139 E5
CPL-142 L -10.26 m

740
CPL-139 E6
CPL-138 B-0.45 x 0.45 m

GUNTUR VIJAYAWADA
E7
1,026 1/S
0
P-583 MH-112 P-4647 MH-1156 P-4648
MH-111 MH-1157 P-4649 E8
FRL :27.93 m L -20.00 m FRL :27.86 m L -19.99 m FRL :27.81 m L -19.99 m MH-4669 CPL-137
B-0.45 x 0.45 m IL :26.21 m FRL :27.79 m L -20.01 m
IL :26.46 m B-0.45 x 0.45 m IL :26.26 m B-0.45 x 0.45 m FRL :27.80 m P-4650 E9
100 1/S 400 1/S 500 1/S IL :26.17 m B-0.45 x 0.45 m MH-3335 E10
IL :26.14 m L -36.62 m
FRL :27.87 m

N12
667 1/S
B-0.45 x 0.45 m E11
IL :26.10 m ZONE 1

N18

N17
N16

N15
N14
N13
916 1/S 10 E12

E13
PLAN FROM CH:622 M TO CH:740 M SECTOR -03 E14
UN-B10(17.00 M) E15

E16

MH-5554 MH-2382 MH-2383 MH-2590 MH-2591


MH-5323
FRL: 27.92 m FRL: 27.85 m FRL: 27.80 m FRL: 27.79 m FRL: 27.79 m FRL: 27.87 m KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

Invert: 26.43 m Invert: 26.34 m Invert: 25.80 m Invert: 25.77 m


Invert: 25.79 m Invert: 25.78 m
FRL
GROUND LEVEL
28 SM-C33
CROWN
INVERT
27
P-1118

V=1:200
IL-26.09
26

H=1:1000 P-113
25 IL-25.77
Power(HDPE)
IL : 24.00
Size:850x1230mm
Datum:24

Depth of Invert 1.49 1.51 2.00 2.00 2.01 2.10

Ground Level 27.01 26.95 26.86 26.80 26.76 26.60

Length (Unified) (m) 19.99 19.98 19.98 20.00 37.43

FRL (m) 27.92 27.85 27.80 27.79 27.79 27.87

Pipe IL (m) 26.43 26.34 26.25 25.80 25.79 25.78 25.77 KEY PLAN OF SECTOR-3
Crown (m) 26.88 26.79 26.70 26.69 26.68 26.67 LEGEND:

Manhole No. MH-5554 MH-2382 MH-2383 MH-5323 MH-2590 MH-2591 STORM DRAIN WITH FLOW DIRECTION

Slope (Calculated) (1/S) 222 222 1998 2000 3743 P-136 STORM DRAIN NUMBER
L-30 STORM DRAIN LENGTH
Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.75 X 0.90 0.75 X 0.90 0.75 X 0.90
B-0.60x0.60 STORM DRAIN SPAN x RISE
Type of Material RCC RCC RCC RCC RCC S-150 STORM DRAIN SLOPE
CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Pipe no: (Label) P-572 P-4651 P-4652 P-4653 P-4654

LONGITUDINAL SECTION (LHS) FROM CH:622 M TO CH:740 M STORM MAN HOLE

CATCH PIT

UTILITES
STORM WATER
MH-111 MH-112 MH-1156 MH-1157 MH-4669 MH-3335
FRL: 27.93 m POWER CONDUIT
FRL: 27.86 m FRL: 27.81 m FRL: 27.79 m FRL: 27.80 m FRL: 27.87 m
Invert: 26.46 m Invert: 26.26 m Invert: 26.21 m Invert: 26.14 m Invert: 26.10 m POTABLE WATER
Invert: 26.17 m
FRL REUSE WATER
SEWER NETWORK
28 GROUND LEVEL
CROWN
V=1:200

LIST OF VILLAGES IN ZONE-1


27 TYPE OF ROAD
P-1118 1.NEKKALLU - NE
H=1:1000 IL-26.10
A- 25.00m ROW
26 2.SHAKAMURU - SM
INVERT B- 17.00m ROW
Power(HDPE) C- 15.60m ROW
IL : 24.50 SM C 91
Datum:25 Size:850x1230mm D- 12.00m ROW
ROAD NUMBER
TYPE OF ROAD (15.60)
Depth of Invert 1.47 1.60 1.60 1.62 1.66 1.77
VILLAGE NAME (SHAKAMURU)
Ground Level 27.00 26.95 26.86 2680 26.76 26.59
NOTES:
Length (Unified) (m) 20.00 19.99 19.99 20.01 36.62
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
FRL (m) 27.93 27.86 27.81 27.79 27.80 27.87 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE

Pipe IL (m) 26.46 26.26 26.21 26.17 26.14 26.10

Crown (m) 26.91 26.71 26.66 26.62 26.59 26.55

Manhole No. MH-111 MH-112 MH-1156 MH-1157 MH-4669 MH-3335

Slope (Calculated) (1/S) 100 400 500 667 916

Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45

Type of Material RCC RCC RCC RCC RCC

Pipe no: (Label) P-583 P-4647 P-4648 P-4649 P-4650


LONGITUDINAL SECTION (RHS) FROM CH:622 TO CH:740 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 8
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 38 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
N
PALA VAGU KR
E1
P-573 P-4658 P-4659 P-4660 P-5928 P-1329 IS
HN
MH-6105 MH-4140 MH-4141 MH-1492 MH-1493 P-5927 MH-4635 MH-4634 A
L -20.00 m L -20.00 m L -20.00 m L -20.00 m MH-2554 L -28.59 m L -20.00 m E2 RI
L -35.04 m VE
FRL :27.90 m B-0.45 x 0.45 m FRL :27.94 m B-0.45 x 0.45 m FRL :27.97 m B-0.45 x 0.45 m FRL :28.01 m B-0.45 x 0.45 m FRL :28.04 m
FRL :27.99 m B-0.45 x 0.45 m
FRL :27.85 m B-0.45 x 0.45 m FRL :27.69 m E3
R
IL :26.25 m IL :26.09 m IL :26.02 m IL :25.96 m IL :25.92 m B-0.45 x 0.45 m IL :26.13 m IL :26.15 m
125 1/S 286 1/S 333 1/S 500 1/S IL :25.86 m 715 1/S 1,000 1/S
584 1/S E4

E5
CPR-131
7+400
P-4675 CPR-132

920
910
900
P-5908

890
880
CPR-138

870
CPR-133

860
850
840
CPR-137

830
820
810
E6

800
790
CPR-135 CPR-134

780
CPR-136

770
760
P-4662 L -10.14 m L -27.37 m

GUNTUR VIJAYAWADA
P-4663 0 E7
L -19.96 m 0 MH-1689 L -20.00 m MH-1009 B-0.60 x 0.45 m B-0.45 x 0.45 m
E8
B-0.45 x 0.45 m FRL :28.03 mB-0.45 x 0.45 m FRL :28.00 m 507 1/S 547 1/S
CPL-135 CPL-131 CPL-130 CPL-129
CPL-134 665 1/S CPL-133 IL :25.98 m 667 1/S CPL-132 IL :25.91 m E9
E10

N12
P-4661 MH-2336 P-1331 MH-2335 E11
MH-1592 P-586 MH-1593 MH-1688 P-4664 ZONE 1

N18

N17
N16

N15
N14
N13
L -20.00 m MH-4951 MH-5680 FRL :27.85 m L -20.00 m FRL :27.69 m
FRL :27.90 m L -20.00 m FRL :27.95 m FRL :27.99 m MH-4379 MH-5804 L -36.95 m MH-5678 10 E12
B-0.45 x 0.45 m IL :26.01 m FRL :27.81
10
FRL :28.06 m FRL :27.72 m IL :25.98 m B-0.45 x 0.45 m IL :26.02 m
IL :26.21 m B-0.45 x 0.45 m IL :26.07 m m FRL :27.79 m B-0.45 x 0.45 m FRL :27.74 m E13
143 1/S 333 1/S IL :26.18 m IL :26.15 m
IL :25.95 m 924 1/S IL :26.15 m CPR-222
IL :26.13 m 500 1/S SECTOR -03 E14

CPR-218 L-216
MH-2458 CP CPL-219 E15

PLAN FROM CH:755 M TO CH:920 M E16

UN-B10(17.00 M)
KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

MH-4140 MH-4141 MH-1492 MH-1493 MH-2554 MH-4635


MH-6105
FRL: 27.94 m FRL: 27.97 m FRL: 28.01 m FRL: 28.04 m FRL: 27.99 m MH-4634
FRL: 27.90 m FRL: 27.85 m
Invert: 26.09 m Invert: 26.02 m Invert: 25.96 m Invert: 25.92 m Invert: 25.86 m FRL: 27.69 m
29 Invert: 26.25 m Invert: 26.13 m
FRL Invert: 26.15 m UN-B10
CROWN
28
INVERT
GROUND LEVEL

27 P-5908
IL-25.89
V=1:200

26
P-5909
H=1:1000 Power(HDPE) IL-25.86
Datum:25 IL : 24.50
Size:850x1230mm

Depth of Invert 1.65 1.85 1.95 2.05 2.12 2.13 1.72 1.54

Ground Level 26.44 26.28 26.17 26.13 26.00 26.84 26.68 26.43

Length (Unified) (m) 20.00 20.00 20.00 20.00 35.04 28.59 20.00

FRL (m) 27.90 27.94 27.97 28.01 28.04 27.99 27.85 27.69

Pipe IL (m) 26.25 26.09 26.02 25.96 25.92 25.86 26.09 26.13 26.15
KEY PLAN OF SECTOR-3
Crown (m) 26.70 26.54 26.47 26.41 26.37 26.31 26.54 26.58 26.60
LEGEND:
Manhole No. MH-6105 MH-4140 MH-4141 MH-1492 MH-1493 MH-2554 MH-4635 MH-4634
STORM DRAIN WITH FLOW DIRECTION
Slope (Calculated) (1/S) 125 286 333 500 584 715 1000
P-136 STORM DRAIN NUMBER
Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 L-30 STORM DRAIN LENGTH
Type of Material RCC RCC RCC RCC RCC RCC RCC B-0.60x0.60 STORM DRAIN SPAN x RISE
S-150 STORM DRAIN SLOPE
Pipe no: (Label) P-573 P-4658 P-4659 P-4660 P-5927 P-5928 P-1329 CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT
Chainage (m) 756 760 770 780 790 800 810 820 830 840 850 860 870 880 890 900 910 920
STORM MAN HOLE

LONGITUDINAL SECTION (LHS) FROM CH:756 M TO CH:920 M CATCH PIT

MH-1593 MH-1688 MH-1689 MH-4951 MH-1009


MH-1592 MH-2336
FRL: 27.95 m FRL: 27.99 m FRL: 28.03 m FRL: 28.06 m FRL: 28.00 m MH-2335 UTILITES
FRL: 27.90 m FRL: 27.85 m
Invert: 26.07 m Invert: 26.01 m Invert: 25.98 m Invert: 25.95 m Invert: 25.91 m FRL: 27.69 m
29 Invert: 26.21 m Invert: 25.98 m STORM WATER
Invert: 26.02 m
FRL
POWER CONDUIT
POTABLE WATER
28
REUSE WATER

GROUND LEVEL CROWN SEWER NETWORK


27 P-5908
IL-25.91
V=1:200

LIST OF VILLAGES IN ZONE-1


26 TYPE OF ROAD
1.NEKKALLU - NE
H=1:1000 INVERT Power(HDPE)
IL : 24.50
A- 25.00m ROW
Datum:25 2.SHAKAMURU - SM
Size:850x1230mm B- 17.00m ROW
1.69 1.88 1.98 2.05 2.11 2.09 1.87 1.67 C- 15.60m ROW
Depth of Invert SM C 91
D- 12.00m ROW
Ground Level
ROAD NUMBER
26.45 26.29 26.18 26.17 26.00 25.84 25.68 25.44
TYPE OF ROAD (15.60)
Length (Unified) (m) 20.00 20.00 19.96 20.00 36.95 27.37 20.00 VILLAGE NAME (SHAKAMURU)

FRL (m) 27.90 27.95 27.99 28.03 28.06 28.00 27.85 27.69 NOTES:

Pipe IL (m) 26.21 26.07 26.01 25.98 25.95 25.91 25.93 25.98 26.02 1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED

26.66 26.52 26.46 26.43 26.40 26.36 26.38 26.43 26.47 2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
Crown (m)

Manhole No. MH-1592 MH-1593 MH-1688 MH-1689 MH-4951 MH-1009 MH-2336 MH-2335

Slope (Calculated) (1/S) 143 333 665 667 924 547 500

Span x Rise(m) 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45 0.45 X 0.45

Type of Material RCC RCC RCC RCC RCC RCC RCC

Pipe no: (Label) P-586 P-4661 P-4662 P-4663 P-4664 P-4675 P-1331

Chainage (m) 755 760 770 780 790 800 810 820 830 840 850 860 870 880 890 900 910 920

LONGITUDINAL SECTION (RHS) FROM CH:755 TO CH:920 M

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 3 9
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 39 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2
0.45 m
5m

L -27.37 m
B-0.45 x 0.4
L -28.59 m

B-0.45 x
N

P-4675

547 1/S
P-5928

CPL-136
715 1/S
750

B-0.45 x 0.45 m
B-0.60 x 0.45 m

B-0.75 x 0.90 m
PALA VAGU

5m
KR

FRL :27.87 m
E1

L -10.26 m
880 IS

HFL-22.601
L -64.06 m

L -54.17 m

IL :26.10 m
FRL :27.87 m

1,026 1/S
HN

HGL-25.81
FRL-27.89
B-0.60 x 0.4

MH-3335
A

IL :25.77 m
m

P-1118
807 1/S

698 1/S
IL-25.69
E2 RI

P-5909

MH-2591
VE

CPL-137
L -10.14

P-113
HGL-26.00

P-5908
FRL-27.84

HFL-23.25
R

507 1/S

10
O-35
CPL-131
E3

IL-25.78

0
740

O-34
E4

CPR-139
E5

m
870 E6

CPR-133
m
FRL :27.99

GUNTUR VIJAYAWADA
MH-2554
E7

IL :25.86

m
FRL :28.00

MH-5678
MH-1009

IL :25.91
E8

PLAN FOR LPS-2 E9


E10

N12
E11
PLAN FOR LPS-1 O-35 MH-3335 ZONE 1

N18

N17
N16

N15
N14
N13
MH-2591
E12
FRL: 27.89 m FRL: 27.87 m FRL: 27.87 m
O-34 MH-2554 MH-1009 Invert: 25.69 m Invert: 25.77 m Invert: 26.10 m E13
FRL: 27.84 m FRL: 27.99 m FRL: 28.00 m 29
SECTOR -03 E14
Invert: 25.78 m Invert: 25.86 m Invert: 25.91 m
E15
29
28 E16

28
27 KEY PLAN OF ZONE-1 N11 N10 N9 N8 N7 N6N5 N3B N1

27
P-5928
P-4675 26
IL-26.09

V=1:200
IL-25.93 P-4650
V=1:200

26 P-4654 IL-26.10
P-4664 Datum:25 IL-25.77
P-5927
IL-25.86 IL-25.91 H=1:1000
H=1:1000 Datum:25

Depth of Invert 2.20 2.10 1.77


Depth of Invert 2.06 2.13 2.09
Ground Level
Ground Level

10.14 Length (Unified) (m) 54.17 10.26


Length (Unified) (m) 64.06

28.00 FRL (m) 27.89 27.87 27.87


FRL (m) 27.84 27.99
Pipe IL (m) 25.69 25.77 26.09 26.10
Pipe IL (m) 25.78 25.86 25.89 25.91
Crown (m) 26.59 26.67 26.54 26.55
Crown (m) 26.23 26.36
26.31 26.34
Manhole No. MH-O-37 MH-2591 MH-3335
Manhole No. O-34 MH-1009
MH-2554
Slope (1/S) 698 1026
Slope (1/S) 807 507
0.60X0.45 0.60X0.45 Span X Rise 0.75X0.90 0.45X0.45
Span X Rise
Type of Material RCC RCC RCC KEY PLAN OF SECTOR-3
Type of Material RCC RCC RCC
Pipe no: (Label) P-113 P-1118
Pipe no: (Label) P-5909 P-5908 LEGEND:
Chainage (m)
Chainage (m) STORM DRAIN WITH FLOW DIRECTION

P-136 STORM DRAIN NUMBER


LONGITUDINAL SECTION FOR LPS-2 L-30
LONGITUDINAL SECTION FOR LPS-1 STORM DRAIN LENGTH

0
B-0.60x0.60

HFL-23.308
STORM DRAIN SPAN x RISE

HGL-26.64
B-0.45 x 0.45 m

FRL-28.41

CPL-146
IL-26.51
B-0.45 x 0.45 m

S-150 STORM DRAIN SLOPE

FRL :28.28 m
FRL :28.22 m
FRL :28.18 m
L -44.69 m

IL :26.60 m
O-37
IL :26.29 m
IL :26.27 m

CPL,CPR CATCH PIT LEFT,CATCH PIT RIGHT


L -10.13 m

MH-5069
HGL-26.35

MH-4229
963 1/S
FRL-28.35

HFL-23.27

P-1302

MH-358

418 1/S
IL-26.22

P-1513

FRL :28.24 m
STORM MAN HOLE

B-0.45 x 0.45 m
CPR-148
530

IL :26.56 m
O-36

550

MH-2538
CPR-147

B-0.45 x 0.45 m

L -10.10 m

238 1/S
L -45.99 m
CATCH PIT
CPL-145

P-1512
1,013 1/S
P-1303
540 520 UTILITES

B-0.45 x 0.45 m
PLAN FOR LPS-3 PLAN FOR LPS-4 STORM WATER

O-36 POWER CONDUIT


FRL: 28.35 m MH-358 MH-4229 O-37 POTABLE WATER
Invert: 26.22 m FRL: 28.18 m FRL : 28.22 m FRL: 28.41 m MH-2538 MH-5069
Invert: 26.29 m FRL: 28.28 m REUSE WATER
Invert: 26.27 m Invert: 26.51 m FRL: 28.24 m
Invert: 26.56 m Invert: 26.60 m SEWER NETWORK
29
29
LIST OF VILLAGES IN ZONE-1
28
TYPE OF ROAD
28 1.NEKKALLU - NE
27 A- 25.00m ROW
2.SHAKAMURU - SM

V=1:200
27 B- 17.00m ROW
V=1:200

C- 15.60m ROW
Datum:26 P-4550 P-4551 P-4546
SM C 91
P-4544 D- 12.00m ROW
IL-26.27 IL-26.29 H=1:1000 Datum:26 IL-26.56 IL-26.60 ROAD NUMBER
H=1:1000 TYPE OF ROAD (15.60)
VILLAGE NAME (SHAKAMURU)
Depth of Invert 2.13 1.93 1.93 Depth of Invert 1.68
1.90 1.68
NOTES:
Ground Level Ground Level
1.ALL DIMENSIONS ARE IN METERS, SLOPE IS 1:S,UNLESS OTHERWISE SPECIFIED
Length (Unified) (m) 44.69 10.13 Length (Unified) (m) 45.99 10.10
2.INVERT LEVELS OF WATER&REUSE ARE TENTATIVE
FRL (m) 28.35 28.18 28.22 28.24 28.28
FRL (m) 26.41
Pipe IL (m) 26.27 26.29 Pipe IL (m) 26.56 26.60
26.22 26.51
Crown (m) 26.67 26.72 26.74 Crown (m) 26.96 27.01 27.05
Manhole No. O-36 MH-358 MH-4229 Manhole No. MH-2538 MH-5069
O-37
Slope (1/S) 963 418 Slope (1/S) 238
1013
Span X Rise 0.45 X 0.45 0.45 X 0.45 Span X Rise 0.45 X 0.45 0.45 X 0.45
Type of Material RCC RCC RCC Type of Material RCC
RCC RCC
Pipe no: (Label) P-1302 Pipe no: (Label) P-1303 P-1512
P-1513
Chainage (m) Chainage (m)

LONGITUDINAL SECTION FOR LPS-4


LONGITUDINAL SECTION FOR LPS-3

PREPARED BY VERIFIED BY SUBMITTED BY CHECKED BY RECOMMENDED BY APPROVED BY CLIENT: CONTRACTOR: TITLE:


EPC AGENCY DESIGN PGMC ADDL. M/S MEGHA ENGINEERING & INFRASTRUCTURES LIMITED PLAN AND L-SECTIONS OF STORM WATER NETWORK
PMC EE SE CE
EXPERT DIRECTOR S-2 TECHNOCRAT INDUSTRIAL ESTATE,
FEEDBACKINFRA (APCRDA) (APCRDA)
(APCRDA)
(CH2M)
(APCRDA)
(APCRDA) GOVERNMENT OF ANDHRA PRADESH FOR SECTOR-03 (ZONE-1)
BALANAGAR HYDERABAD-500 037
CAPITAL REGION DEVELOPMENT AUTHORITY. (CRDA)
PROJECT :
Investigations, Design and Constructions of Roads, Drains, Water Supply,
Sewerage, STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue DRAWING NO:
Plantation compatible with Trunk infrastructure in Layouts for Land Pooling
M E I L - C R D A - Z 1 - S 0 3 - S W - D W G - 3 0 0 1 - 0 4 0
Schemes for Nekkalu and Shakamuru (part) in Zone-1 area in Amaravati
R0 31-12-2018 VIKRAM CVR I.S.K DATE : 31-12-2018 SCALE : H 1:1000 V 1:200 SHEET NO. : 40 OF 40
Capital City, Andhra Pradesh on EPC Basis & Performance based O&M of
REV DATE REVISION DESCRIPTION DRAWN CHKD. APPD. the Infrastructure created for a period of 7 years (including DLP of 2 years). REV: R1 SIZE: A2