Вы находитесь на странице: 1из 13

1.

CONTINUING PROFESSIONAL DEVELOPMENT 01230-385-8M-P-001

SIS to be signed

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

2. 0130-385-8M-OS-010

SIS to be signed

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

3. 0130-385-8M-P-005

SIS to be signed

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

4. 0130-385-8M-P-006
SIS to be signed

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

5. 0130-385-8M-RL-004

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

6. 0143-385-8M-P-001

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

7. 0146-385-8M-P-001

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.


Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

8. 0148-385-8M-P-001

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

9. 300-385-8M-OS-001

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

10. 410-385-80-SR-001B

The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

11. 410-385-80-SR-001C

The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

12. 2020-385-8M-RL-003

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

13. 300-385-8M-OS-002

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

14. 130-385-8M-P-008

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.


Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

15. 130-385-8M-P-009

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

16. 520-385-8M-C-001

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

17. 2020-385-8M-RL-002

SIS to be signed

CS flange showing as blind flange at test limit in Inconel line, to be corrected and same material flange
shall be used.

Line designation table to be attached

Approved lay-up method procedure sheet to be attached.

Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached

Re-Instatement Inspection checklist SAIC-L-2022 not attached

Pre-Test Punch Listing check list SAIC-A-2010 to be attached.


…………

18. 410-385-8O-OWS-008

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 CS flange showing as blind flange at test limit in SS line, to be corrected and same material
flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
19. 410-385-8O-SR-001

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
20. 410-385-8O-OWS-003

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
21. 410-385-8O-OWS-004

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
22. 410-385-8O-OWS-005
 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
23. 410-385-8O-OWS-006

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
24. 410-385-8O-SR-001A

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
25. 430-385-8O-OWS-001
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
26. 520-385-8O-C-001
 SIS to be signed
 CS flange showing as blind flange at test limit in SS line, to be corrected and same material
flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
27. 430-385-8O-OWS-003
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
28. 300-385-8O-OS-007
 SIS to be signed
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

T-4420

1. 420-310-26-AS-001

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in Nickel Alloy Line, to be corrected and
same material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
2. 430-310-26-OWS-002

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 CS flange/NPTF Cap showing as test blind at test limit in Inconnel Line, to be corrected and
same material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
3. 520-310-26-C-001
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
4. 520-310-26-C-003
 CS flange/NPTF Cap showing as test blind at test limit in SS Line, to be corrected and same
material flange shall be used.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
5. 730-31026-OWS-001
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
6. 410-310-26-SR-001C

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
7. 410-310-26-SR-001B

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
8. 410-310-26-SR-001A

 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall
be injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
9. 410-310-26-SR-001
 The given filling point not comply the SAES-A-004, para 9.1.1 requirement. The test fluid shall be
injected at the lowest point in the system to minimize entrapped air.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
10. 410-310-26-OWS-006
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
11. 410-310-26-OWS-005
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
12. 730-310-26-OWS-002
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
13. 730-310-26-P-001
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

14. 740-310-26-SPO-002
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
15. 2020-310-26-RL-001A
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
16. 2020-310-26-RL-001B
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
17. 2020-310-26-RL-001C
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
18. 2020-310-26-RL-001D
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
19. 2020-310-26-RL-002
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
20. 2020-310-26-RL-004
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
21. 120-385-8M-P-003
 SIS to be signed
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.
22. 120-385-8M-P-002
 SIS to be signed
 Temporary blind shall be the same as line material.
 Line designation table to be attached
 Approved lay-up method procedure sheet to be attached.
 Verification of Testing Media for Hydrostatic Testing (Water Quality) SAIC-A-2008 not attached
 Re-Instatement Inspection checklist SAIC-L-2022 not attached
 Pre-Test Punch Listing check list SAIC-A-2010 to be attached.

Вам также может понравиться