Вы находитесь на странице: 1из 2

TAMIMI Pre-Engineered Buildings DOC.

# TPEB-QHSE-F-01

ISSUE# 01
IN-PROCESS ASSEMBLY INSPECTION CHECK LIST
ISSUE DATE 05-06-2017

TAMIMI PEB INSPECTION CHECKLIST IC NUMBER DATE APPROVED RFI NUMBER

INSTALLATION OF DOORS AND WINDOWS CHECK LIST TPEB-AKH-055

PROJECT TITLE JO NUMBER CONTRACTOR / SUBCONTRACTOR

AL KIFAH HOLDING - MARJAN TPEB-TAMIMI

BUILDING DESCRIPTION Scheduled Inspection DATE Inspection Level


BUILDING Number

ITE
M ACCEPTANCE CRITERIA Reference PASS FAIL N/A REMARKS
NO.

A: Doors

Exterior & interior doors shall be 925 x 2025 mm Taylor Door or MDF Door with TPEB- SPR-10
A1
aluminum frame with powder coating.
TPEB- SPR-10
Verify Door lock, Door Closer, powder coated aluminum threshold & weather strip
A2
on door frame and door panel

Toilet doors shall be 600 x 2100mm or 915mm x 2100 with aluminum frame and TPEB- SPR-10
A3
complete ironmongery.
TPEB- SPR-10
Main access doors to buildings and public toilet doors shall have view panel (glass
A4
openings with safety glass).

B: Windows

All windows shall be made of aluminum horizontal sliding type, with removable fly
B1 TPEB- SPR-10
screen mesh, as commonly manufactured by porta cabin manufacturer.
B2 All windows shall be generally 1200 x 1400 mm and meet the egress requirements TPEB- SPR-10
B3 Bathroom windows shall be vertically sliding 600 x 700mm with obscure glass TPEB- SPR-10
All windows shall be properly sealed after fixing to avoid any water leakage from the
B4 TPEB- SPR-10
outside and should have standard horizontal blinds / Roller blinds as per drawing.
TAMIMI Pre-Engineered Buildings DOC. # TPEB-QHSE-F-01

ISSUE# 01
IN-PROCESS ASSEMBLY INSPECTION CHECK LIST
ISSUE DATE 05-06-2017

REMARKS:

Production Engineer / QC INSPECTOR QC MANAGER/ QC Supervisor Third Party Representative


Supervisor
NAME: NAME: NAME: NAME:

SIGNATURE SIGNATURE SIGNATURE SIGNATURE

DATE: DATE: DATE: