Redevelopment work consist of 6 stages.


1. Land rights.
2. Building design – FSI calculation.
3. Cost factor .
4. Sharing of benefits.
5. Demolishing old building and
6. Construction Of new building.

REX – GSS
OLD BUILDING - Issues
• Due to improper maintenance , the
deterioration has affected the service life of
building. It may not work for more years.
• Plinth level has become lower than road level ,
thus major water logging during rains.
• Climbing 3 / 4 floors has becoming difficult .
• Absence of Common facility. ( society office / parking /
gym / children play area, etc. )
• Need of additional space ,Due to increase in
family members. Not able to purchase
another flat due to Cost of property too high.
REX – PMC REX – BMC

OLD BUILDING NEW BUILDING

• In old building normally • For new building


1 FSI is provided. normally 3-5 FSI is given
• These 1 FSI is equal to depended on type of
plot area. owner ship of same.
• Land rights is 1 sq ft • These 3-5 FSI is
land = 1 sq ft flat area. proportionate to plot
area.
• Land rights will be
1 sq ft land = 4 sq ft flat
area.
REX – GSS
REX – PMC REX – BMC

LAND RIGHTS
• Land rights are rights of indigenous
people to land.
• Land right as per document called
conveyance dead and property card.
• Land right as per document referred
to as Private, MHADA, Collector,
MMRDA, BMC, Gaothan, Lease
Hold, Farm Land.,etc.
REX – GSS
REX – PMC REX – BMC

Land Rights
• The majority of redevelopment are being
planned on Private and MHADA plot.
( All Around suburbs )
• Private plot is allowed 1:2 ( 1 land + 1 TDR )
• MHADA plot is allowed 1:4 ( 1 land + 3 TDR )
• Private and MHADA are different calculation
in redevelopment.
• On top another 35% Funjible Fsi is allowed by
MCGM.
REX – GSS
REX – PMC REX – BMC

BUILDING DESIGN- FSI CALCULATION


The FSI for New building that are as follows:
Old plot 25000 sq ft = FSI = 1 (25000 sq.ft.)

To plan. Consider a plot having 25000 sq.ft.


plot area as per old FSI = 1 i.e. 25000 sq.ft.

1. TDR = 1:1 (25000 sq.ft.)


(Transfer of Development Right)
These 1:1 one TDR is required to be purchased.
Total FSI = 2 i.e. 50000 sq.ft.

REX – GSS
REX – PMC REX – PMC

BUILDING DESIGN- FSI CALCULATION


2. On that 2 FSI area add funjible FSI 35% so it
become 2.7 FSI i.e. 67500 sq.ft.
3. On these 2.7 FSI area increase 25% for
common area ( staircase / lift / passage ) so it
become 3.5 FSI i.e. 84375 sq.ft.
4. On area of point 2, increase 50% for
parking, it becomes Overall Construction
Area = 1 Lakh sq.ft. Approx.
REX – PMC REX – BMC

CONCEPT PLAN
Main points to consider / required:
1) To measure the plot.
2) Measure the Road at all side.(9m)
3) Fix the Open Space
 As per Old Bldg (H/3)
 As per New Bldg (H/4)
4) Find / Fix the height of Building/Air path.
5) Fix the common Area which is 25% of actual
Area.
6) Fix the FSI to be used.(1: 3to5)

REX – GSS
REX – PMC REX – BMC

COST FACTOR
The following points are involve in cost factor:
• Land cost : R/R + 100% (already owned)
• TDR cost : 50% from govt. to buy : @ 60% R/R
50% from market (at negotiate price )
• Fungible FSI : 35% to old member (free)
: 35% to sale part ( to purchase )
• Common area : to old member area (free)
: to sale part area ( to purchase )
25% on total area @25% R/R

REX – GSS
REX – PMC REX – PMC

• Construction : 2500 to 4000 sqft


cost (as per area)
• Parking : 1000 to 1500 sqft
• Govt. approval : 150 (official) ,
1000 ( Others )
• Professional : 200 – 300 (per sqft)
 PMC : 50 / Design : 50
 Site Execution : 100 / Liasion : 50
 Legal & others : 50.
Find out sale carpet rate ?
• Refer newspaper advt for sale of ready flat /
under construction bldg / Under new launch.
• Check ready recknor rate / running year.
• Check property sale websites - Makan.co m,
99acres.com, Magicbricks.com , housing.com , etc.
• Ask the clients / few members .
• Ask Property agents of local area.
• Refer newspaper rates / property times.
• Note all – but consider average of all .
REX – PMC REX – BMC

BASIC CONCEPT OF STAGES FOR REDEVELOPMENT


Sharing of benefits – Developer
• To invest project cost over / conduct business over 30 months.
Benefit - 30% + profit on project cost ( Project must be bankable)
Sharing of benefits – Society member / plot owner
• Plot owners /society to offer - – Depart proportionate land
Rights and allow developer to construct building.
• Benefit - Extra carpet area (At least one room extra ) with
Rent & Corpus amount for other expenses, etc.
 Expenses from benefit amount :
• Rent -24/30 months / Shifting -15 to 50,000/-
• Corpus –New taxes + furniture …
(old taxes:1-2 Rs/sqft, new taxes:5-10 Rs/sqft)

REX – GSS
Builder Re-development
1 PMC prepares Financial – workable feasibility report
2 SGBM approves the report & expects builders to fulfill each & all promises
3 Tender floated to search for developer , to aid & manage entire project.
4 Developers appointed & enters into DA, gets development rights from
society. Prepares draft Concept plan for society approval with options to
accommodate more area .
5 On plan asks & Invites ( members ) to purchase additional area @10%
discount , over & above free area promised. Collects fund ( cash part only )
sufficient to get the building plan approved from BMC – IOD.
6 Keeps more purchaser in waiting to sale the demanded area at higher rate
on IOD , to collect fund / cost of rent & corpus amount.
7 Building design & plan prepared & submitted to BMC for approval – IOD.
8 Existing members vacates building to allow the construction.
9 Appoints contractor to take - do only construction work, in exchange of / in
lieu of salable carpet area proportionate to total construction cost.
Contract Re - development
PMC prepares Legal – Technical – Financial – workable feasibility report.

SGBM approves the report , Agrees to allocate the work to designated professionals
and expects them to perform.
PMC – Architect prepares concept plan – SGBM approval

Concept plan – PMC to search for options & proposals of finance procurement /
modalities. Through ( members + relatives + investors + fund houses + Banks , etc. )
Funds necessary to do building plan approval till – IOD , assured & collected at
society.
Keeps more purchaser in waiting to sale the demanded area at higher rate on IOD ,
to collect fund / cost of rent & corpus amount
Building design & plan prepared & submitted to BMC for approval – IOD.

Tender floated to appoint contractor cum developer to take - do only construction


work, in exchange of / in lieu of salable carpet area proportionate to present market
rate.
Existing members vacates building to allow the construction.
Self Redevelopment
PMC prepares Legal – Technical – Financial – workable feasibility report.

Collects 25% fund from members.

Plan submitted to BMC for approval – IOD .

Members arranges required project fund through themselves or BANk.

Tender floated to appoint contractor cum developer to do only construction work


against payment.

Members arranges & finances for transit accommodations.

Existing members vacates building to allow the construction.

Construction takes place as per order .


REX – PMC REX – BMC

NEXT STAGE
Program the redevelopment with
basic to remain intact.
We all need to think deep and
explore better possibilities.