Daily Progress Report

Client : Adani Gas Ltd Pipe Dia & Thickness


Contractor : Tolani Projects Pvt Ltd Pipe Specification
TPIA : TUV India Location
PROGRESS
Weekly
Sr Total Qty
Activity UOM Planing
No (Scope) Today’s Previous Cumulat. Day 1

1 Pipe Received ( Steel) Mtr. 4690 0 10980 10980


MDPE 125mm
2 Mtr.
Received ( PE)
MDPE 90mm Received
3 Mtr.
( PE)
4 Pipe Stringing Mtr. 4690 0 3484.67 3484.67

Main line Welding Nos. 460 0 163 163


5 Tie in welding Nos. 0 2 2
Total Welding Nos. 460 0 165 165
Radiography taken Nos. 460 1 132 133
Reviewed Nos. 0 132 132
Accepted Nos. 0 124 124
Retake / Reshoot Segment(RS) 0 25 25
6
RT/RS Attended Segment 0 25 25
Repair Segment 0 15 15
Repair Attended Segment 0 15 15
Total Accepted Nos. 0 124 124
7 Joint Coating Nos. 460 0 118 118
8 Trenching Mtr. 4690 0 118 118
9 Lowering Mtr. 4690 0 84.74 84.74
10 MDPE 125 Lowering Mtr.
11 MDPE 90 Lowering Mtr.
12 MDPE 125 Joints Nos.
13 MDPE 90 Joints Nos.
14 Backfilling Nos. 0 89 89
15 HDD Mtr.

Manpower
Type Nos. Type Name
Welders 2 Project Manager
Fitters & Grinder 3 Q.A./Q.C. MANORANJAN SHARMA
Riggers 5 Site In-charge (Steel) Shajahan P I
Helpers 4 Project Co-ordinator GANESH SHARMA
Excavation Labours 1 safety officer RAJAN VERMA
Insulator 2 Foreman PRADEEP MISHRA
sand blaster 2 Electrician /Mechanic AJEET PRAJAPATI
operator & Drivers 4 Store Keeper GURUDIN
Planning Engineer
Trenching Supervisor Sugata Dutta
Welding Supervisor Pramod Kumar
GET
Contractor's Stock Sheet Welder Performanc
Qty. Welder Name Jt. Done Repair % of R
Welding Electrode - 6010 625 KG Balinder Mahato 165
Welding Electrode - 7010P1 1450 KG Mukesh Mahato 165
Coating Sleeves 2 KM(200 NOS)
Warning Mat 20 KM

ANY PROBLEMS :

Contractor TPIA
Sign:
Name:
Date:
Doc.No.: PRJ 200
port REV.No.: 00
Eff.Date: 01.02.2018

:12" & 7.9mm Date: 21-09-2019


:API 5L Gr-X-42M
:Riico road to Hindustan zinc Puliya, chittorgarh
Qty Executed
Last
Week
Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Total
Progress

Machinery
Qty.
Hydra 1
JCB 1
Welding M/c Set 3
Coating Equipment Set 1
Grinding M/c 12
Submercible Pump 1
Power Generator 1
Trailor / Tractor/LMV 6

formance
% of Repair Remarks
TPIA AGL
GA-Chittorgarh

DPR as on 21.09.2019

Sr.No Activity UOM Todays Previous Cumulative


1 Stringing M 0 3484.67 3484.67
Nos 0 165 165
2 Welding
M 0 3413.5 3413.5
3 Lowering M 0 84.75 84.75
4 Backfilling M 0 89 89
Next Day Program As On Date 22.09.2019

S.No. Activity Location Supervisor Name/Engineer Contact No.