DOC No: CSS-DOC-018-R0

SITE ACCEPTANCE TEST REPORT FOR UPS

EQUIPMENT MODEL NO
DESCRIPTION
Dubas Engineering Pvt Ltd
NAME OF SERIAL NO
MANUFACTURER

PRODUCT BATTERY
MAKE& TYPE

CUSTOMER BATTERY AH &


CELLS QTY

DATE OF
PROJECT
COMMISTIOING

1.0 PHYSICAL VERIFICATION UPS SYSTEM:


Panel Erection as per GA
Ok / Not ok Room Ventilation Ok / Not ok
drawing
Check control wire at PCB‘s
Earthing Provision Ok / Not ok Ok / Not ok
for tightness
Interconnection between
UPS1/UPS2/SWC/SCVS Ok / Not ok Cable entry & Gland size Ok / Not ok
Control & Power cabling
Cable Termination Ok / Not ok Mechanical Tightness Ok / Not ok

Cable Distance
2.0 CABLING DETAILS: from ACDB
Cable Size Cable Entry Ok / Not ok

Input cabling for UPS 1 & 2 Top/Bottom Ok / Not ok


Input cabling for SCVS Top/Bottom Ok / Not ok
Output cabling Top/Bottom Ok / Not ok
Battery Cabling Top/Bottom Top/Bottom
SWC to ACDB Top/Bottom Top/Bottom

3.0 COLD TEST: Observation Remark


Input terminal to body
Output terminal to body
Insulation resistance
Battery terminal to body
Bypass terminal to body
DOC No: CSS-DOC-018-R0

4.0 FUNCTIONAL CHECK


S.L Observation Remark
TEST PARAMETERS UPS-1 UPS-2 SCVS
NO
1. Out Put Voltage Ok / Not ok

2. Charging Voltage Ok / Not ok

3. Boost charging Voltage Ok / Not ok

4. Battery Charging Current Ok / Not ok

5. Output current Ok / Not ok

6. Out Power Ok / Not ok

7. Static Bypass Operation Ok / Not ok

8. Manual Bypass Operation Ok / Not ok

5.0 PERFORMANCE CHARACTERISTIC TEST


UPS-1
No load load Remarks
No load Parameters
R Y B R Y B
PN
Volts V
Input PP
Current A
Volts V
DC O/P
Current I
UPS 2
No load load Remarks
No load Parameters
R Y B R Y B
PN
Volts V
Input PP
Current A
Voltage
Battery
Current

Voltage

Out Put Current

Frequency
DOC No: CSS-DOC-018-R0

6.0 STATIC BYPASS TRANSFER AND RETRANSFER TEST UPS1 & 2


TESTING CONDITION Result Observation REMARKS
Load is transferred to the Ok / Not ok
UPS faulty / INV key OFF
bypass
Load is re-transferred Ok / Not ok
UPS healthy (INV key ON)
Bypass to UPS
Manual Bypass Operation Ok / Not ok

7.0 PARALLEL OPERATION TEST [UPS A & B];

SI.
Test Condition Observation Result
No
Ok / Not ok
1 UPS1 ON & UPS 2 ON LOAD IS SHARED B/W UPS 1 & UPS 2

Ok / Not ok
2 UPS 1 ON & UPS 2 OFF/TRIP LOAD IS CONNECTED TO UPS 1
Ok / Not ok
3 UPS 1 OFF/ TRIP UPS 2 ON LOAD IS CONNECTED TO UPS 2
Ok / Not ok
4 UPS 2 ON & UPS 1 ON LOAD IS SHARED B/W UPS 2 & UPS 1

LOAD IS TRANSFERRED TO STATIC Ok / Not ok


5 UPS 1 OFF/ TRIP UPS 2 OFF/ TRIP
BYPASS

8.0 DISPLY PARAMETERS for UPS1/UPS2/SWC/SCVS

Parameters Result parameters Result

Input Parameters Voltage Ok / Not ok Output Parameters Ok / Not ok


& Current Voltage & Current
Battery Parameters Ok / Not ok Status Ok / Not ok

DC BUS parameters Ok / Not ok Faults & Alarms Ok / Not ok

CAN communication Ok / Not ok

9.0 INDICATIONS AND ALARM TEST

Indication Result Indication Result

Mains ON Ok / Not ok I/P U/V,O/V Ok / Not ok

Converter ON Ok / Not ok Batt low trip Ok / Not ok

Batt on charge Ok / Not ok Inverter Trip Ok / Not ok

Inverter On Ok / Not ok Inverter O/V,/U/V Ok / Not ok

Load On ups Ok / Not ok Inverter O/L Ok / Not ok

Bypass Healthy Ok / Not ok System OT Ok / Not ok

Load on battery Ok / Not ok Inv loss of SYNC Ok / Not ok

Batt low pre alarm Ok / Not ok Ok / Not ok

Load ON Bypass Ok / Not ok Ok / Not ok


DOC No: CSS-DOC-018-R0

Converter trip Ok / Not ok Ok / Not ok

10.0 PHYSICAL VERIFICATION BATTERY BANK: -


Battery Erection as per GA
Ok / Not ok Room Ventilation Ok / Not ok
drawing
Earthing Provision for Stand (If Inter connection tightness
Ok / Not ok Ok / Not ok
required)

11.0 BATTERY INITIAL FILLING & CHARGING PRFORMANCE:


Description Requirement observation Remarks
Electrolyte Initial Filling of the Ok / Not ok
cell
Cooling Period for cells Ok / Not ok

Battery charging Voltage Ok / Not ok

Battery charging Current Ok / Not ok


As Per IFC Procedure /
Charging Hours O&M Ok / Not ok

Cooling Period for cells Ok / Not ok

Discharging Hours Ok / Not ok/NA

Recharging Hours Ok / Not ok

Cell Specific Gravity Ok / Not ok

12.0 UPS SYSTEM COMMISSIONING HAS BEEN COMPLETED SUCCESSFULLY &


HANDOVER THE SYSTEM TO CUSTOMER / CONSIGNEE
YES/NO
13.0. UPS SYSTEM OPERATIONAL FUNCTIONS HAS BEEN EXPLAINED TO CUSTOMER /
CONSIGNEE
YES/NO
REMARK:

Dubas Engineer Customer Consignee

Name

Signature

Date