Вы находитесь на странице: 1из 12

For enquiry kindly contact :

Aglawe Advance Engineering Pvt. Ltd.


38, 3rd Floor, Gami Industrial Park, Plot no.C-39A, TTC Industrial
Area, MIDC Pawane, Navi Mumbai 400 709, India

Contact : Mr. Shrikant Aglawe


Email : shrikantaglawe@aaepl.co.in
Mobile : +91-9222242201
SeAH Engineering
Business Overview

Founded 1987 Building Site (Unit:m2)

Location Daejeon(Head Quarter) and Pohang, Korea Compressor 7,438

Assets $ 45 million Factory Blower 1,554 9,554

Products Turbo Compressors and Blowers, Facilities Engineering R&D Center 562
Office 794
Office 1,190
Offer air bearing turbo blowers and gearbox turbo compressors R&D Center 396
Conduct EPC(Engineering, Procurement, Construction) projects Total 16,624

Turbo Blower and Compressor Facilities Engineering

Turbo Blower Air Compressor N2 Gas Compressor Steam Compressor 150T Electric Furnace
 Optimally integrated core technologies for air foil bearings, motors, impellers, etc.
 Single unit package integrating all functions such as PLC, VFD, etc.

Air Discharge

Sectional View
Cooling
of Turbo Blower Inlet Air Fan Local
Control Panel
Air Discharge Air Foil Bearing

V.F.D
Shaft
[Inverter]

Scroll

Bearing Housing
High Speed
Motor Total Package
of Turbo Blower
Impeller
Cooling System : Self Cooling
 Patented and simple cooling system : No need additional auxiliaries to cool
 Cooling Diagram

Air Discharge Air Discharge

View of left side View of right side


Cooling System : Electrical Part

View of front side

View of left side View of right side


 Realization of optimized operation solution by flexible controls
 Computerized intelligent group control and monitoring system

Local / Remote C
철강 Constant Pressure
Constant Flow
Proportional
Dissolved Oxygen
Time Mode

[CMM] C

SCADA(HMI) MCP HUB

Modbus, Profibus
Category Positive Displacement Air Bearing Turbo Blower

Compression
Type

Displacement (Compression Eff. ↓) Centrifugal (Compression Eff. ↑ )


Efficiency 35 ~ 45 %( Comp. Eff. 60%) 55 ~ 70%(Comp. Eff 80-85%)
Flow Control Fixed Variable Control with V.F.D
Lubricant Oil Air (No friction)
Foundation Need (Anchor Bolt, Anti-Vibration Mount) Simple (No need to additional work)
Pricing Low High
Noise & Vibration Noisy (over 100dB(A)) and High vibration Quiet(under 85dB(A)) and low vibration
Many Items Minimal Routine Items
Maintenance (e.g. V-Belt, Rubber Coupling, Bearing, (e.g. Inlet Filter, Coolant)
Oil seal etc. as routine maintenance)
 20 to 50 percent more energy  100% Oil-less system  Optimized motor speed control
efficient than conventional blower with VFD
 Comfortable operation with quiet,
 Enable investment recovery low vibration  Plug and Play solution
within 2 or 3 years
 Small footprint and lightweight  Provide various operation modes
 Low maintenance requirements with LCD Display and PLC
Payback Period – for high capacity
Turbo Blower

PD Blower

Profit
Break Even Point
Turbo Blower

Initial
Investment

Operating
R.O.I
Time [Return on Investment]
 Supplies compressed air to water treatment facilities
 Increases the active oxygen with lower discharge temperature and maximizes productivity

Process Diagram
of Wastewater Treatment

Inflow

Primary Secondary Tertiary

Liquid
Solid
Effluent

Basin Primary Air Secondary Disinfection


Sedimentation Basin Aeration Basin Sedimentation Basin
 Convey powder materials such as cement, pellet, etc. by feeding compressed air to transfer line

Reference
 Cement Plant : Asia, Ssangyong, Hyundai etc
 Petrochemistry Plant : Hanwha, TK, LG etc

Transfer Materials

Material Silo
PETG PE LDPE

PVC HDPE PP

Hopper

Storage
Vacuum Drying
Collect dust when the product manufactured Dry and recycle a dehumidifying by discharge air
(Close Loops Cycle)
Reference
 Samsung Electric (Korea, Vietnam) Reference
 Samsung Electronic, Samsung SDI etc

Line
Drying Drying
Tower Tower
Heater
Bag
Filter

Dust Wet Air


Discharge Inlet
 In case of turbo blower, the efficiency is almost same according to the time use
: Non-contacting, Power transfer

 The efficiency for P.D (or Screw) blowers is decreased according to the time use
: Regular maintenance and replacement for main parts to maintain efficiency

System Efficiency
Turbo Blower

Over-haul Time

P.D Blower
Screw Blower

3~5 years Time

Вам также может понравиться