Pembangunan 1 (Satu) Unit Fasilitas Gas JOB NO DOCUMENT NO.

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-015


Accessories Di Kilang RU II Dumai DATE : 04 April 2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-8

CALCULATION OF NEW STRUCTURE PIPERACK AREA H2 PSA

PROYEK : Pembangunan 1 (Satu) Unit Fasilitas Gas External


Kapasitas 57 MMSCFD C/W Accessories
Di Kilang RU II Dumai

LOKASI : RU II DUMAI

PEMILIK PROYEK : PT. PERTAMINA (PERSERO)

NO. KONTRAK/SPK : No.002/E20000/2018-S0

PT ENVIROMATE TECHNOLOGY INTERNATIOAL

V REVIEWED WITH NO COMMENTS (APPROVED) -


A - PROCEED FOR FABRICATION

REVIEWED WITH MINOR COMMENTS -


B - PROCEED WITH FABRICATION SUBJECT TO
COMMENTS NOTED

REVIEWED WITH MAJOR COMMENTS -


C - DO NOT PROCEED WITH FABRICATION

I- FOR INFORMATION

Isa
REVIEWED : ___________ DATE : ____________

APPROVED : ___________ 4/4/19


DATE : ____________

REVIEWED DOES NOT RELIEVE


VENDOR/CONTRACTOR FROM RESPONSIBILITY
FOR ERROR OR DEVIATIONS FROM CONTRACT
REQUIREMENT

2 4-Apr-2019 Re-Issued for Approval DPR ISA UAN


1 26-Mar-2019 Re-Issued for Comment DPR ISA UAN
0 22-Feb-2019 Issued for Approval DPR ISA UAN
REV. DATE DESRIPTION PREP'D CHK'D APP'D CLIENT

PT. ENVIROMATE TECHNOLOGY INTERNATIONAL


Sheet 1 of 9
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB NO DOCUMENT NO.
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-015
Accessories Di Kilang RU II Dumai DATE : 04 April 2019
CALCULATION OF NEW STRUCTURE REVISION : 2
PIPERACK AREA H2 PSA PAGE : 1-9

REVISION HISTORICAL SHEET

PAGE/
REV NO. DATE OF ISSUE ITEM DESCRIPTION OF CHANGE
PARAGRAPH
0 22 Febuary 2019 Issued for Approval

1 26 March 2019 Re-Issued for Comment

2 04 April 2019 Re-Issued for Approval

PT. ENVIROMATE TECHNOLOGY INTERNATIONAL


Sheet 2 of 9
JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2

PT. PERTAMINA (PERSERO) PAGE : 1-9

TABLE OF CONTENTS
Page
REVISION HISTORICAL SHEET
TABLE OF CONTENT

1.0 INTRODUCTION ………………………………………………………………………………………………………………… 3


1,1 General ………………………………………………..…………………………………………………………………… 3
1,2 Objective …………………………………………………...……………………………………………………………… 3
1,3 Codes, Standards, and References ………………………………………………………………………………………3
1,4 Units …………………………………………………………………………………………………...............................
3
1,5 Quality of Material …………………………………………………………………………………………………..........
4
1,6 Unit Weight of Material and Miscellaneous Data ………………………………………………………………………
4
1,7 Abbreviation …………………………………………………………………………………………………...................
4

2.0 DESIGN ANALYSIS ……………………………………………………………………………………………………….. 6


2,1 Design Criteria …………………………………………………………………………………………………................................
6
2,2 Design Load …………………………………………………………………………………………………....................................
7
2,3 Load Combination …………………………………………………………………………………………………...........................
7

3.0 SUMMARY ACTUAL RATIO OF PIPERACK …………………………………………………………………………………


8

4.0 FOOT FOUNDATION AND BORE PILE DESIGN SUMMARY ………………………………………………………………


8

ATTACHMENT
A. MODELING STEEL STRUCTURE DESIGN
B. LOAD CALCULATION
C. ACTUAL RATIO
D. BORE PILE CAPACITY AND SOIL PROPERTIES
E. FOOT FOUNDATION DESIGN
F. BORE PILE DESIGN
Sheet 3 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9

1.0 INTRODUCTION

1.1 General

Scope of work by PT. Pertamina (Persero) RU II Dumai as a user to provide a detailed description of the

scope of work along with the technical specifications required in the construction work of an external gas

facility unit of 57 MMSCFD capacity at the PT. Pertamina (Persero) RU II Dumai refineries, including but

not limited to Basic & Detailed Engineering, Procurement, Construction, Pre-Commissioning, Start-up,

FactotyAcceptance Test (FAT) and Certifications in accord

1,2 Objectives

This document covers the design and calculation of Pipe Rack Foundation for Gas Facility project

development PT. Pertamina (Persero) RU II Dumai refineries.

1,3 Codes, Standards, and References

Indonesian National Regulations / Standards / Codes

1. SNI 1726-2012 "Seismic Resistance Design Procedure for Building and Non Building"

2. SNI 03-2847-2002 "Concrete Structure Design Procedure for Building"

International Codes and Standards

3. ACI 318-05 "Building Code Requirements for Structural Concrete and Commentary"

4. ASCE 7-10 "Minimum Design Loads for Buildings and Other Structures"

5. UBC-97 "Uniform Building Code - Structural Design Requirements"

6. ASME "American Society of Mechanical Engineers" B31.16-2009

7. AISC-89, "Manual of Steel Construction: Allowable Stress Design 9th edition"

1,4 Units

All Units are in SI Unit, unless noted otherwise


Sheet 4 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9

1,5 Quality of Material


No. Material Description Value Unit
1. Structural Steel ASTM A36
fy BJTS 35 (SNI 07-2052-2002) 345 MPa
fy BJTS 24 (SNI 07-2052-2002) 240 MPa
2 . Anchor Bolt ASTM A-307
ft allowable tensile stress 80 MPa
fv allowable shear stress 36 MPa
3 . Concrete
fc' Sturctural Concrete 24,9 MPa
fc' Bore Pile Concrete 37,35 MPa
fc' leveling concrete compressive stress 15 MPa

1,6 Unit Weight of Material and Miscellaneous Data


Material Unit Weight (kN/m3)
Reinforced Concrete (gc) 24,90
Lean Concrete (gpc) 22,00
Steel (gs) 77,00
Soil Dry 16,70
Soil Wet 17,00
Sand 20,00
Water (gL) 9,81

Variable Value Unit


Gravity Acceleration (g) 9,81 m/s2

1.7 Abbreviation
Abp : area of base plate
Af : area of flange
Apc : pile cap area supporting column
Aw : area of web
a : equivalent width of tension area
bw : Wiremesh width
Bf : Footing Width
bf : width of flange
bs : Uniform width
C : compression force
Ca : seismic coefficient
Cb : stress modifier
Cp : wind force coefficients
Cv : seismic coefficient
D : dead load
d : member depth
d' : effective depth of concrete member
dp : Pedestal Thickness
dc : concrete cover thickness
E : elastic modulus or young modulus
EQ : earthquake load
Sheet 5 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9
fa : allowable steel compression stress
fb : allowable bending strength
fc : allowable concrete compressive stress
fc' : concrete compression stress
fpc : allowable concrete compressive stress
ft : allowable tensile strength
fu : ultimate stress
fv : allowable shear stress
fy : yield stress
G : gust effect factor
hf : Footing Thickness
H : total height of structure
ha : Pedestal above ground
hb : Pedestal under ground
hp : member total height
I : importance factor
Kd : wind direction factor
Kz : velocity pressure exposure coefficient
Kzt : topographic factor
L : live load
Ls : uniform Length
Lw : Wiremesh span
Lf : Footing Length
M : moment force
n : number of bolt
P : axial force
qz : wind velocity pressure
qD : uniform load
R : rain load
SW : self weight
SIDL : super imposed dead load
T : natural period of structure
tc : plate thickness required to resist bolt maximum tension
tf : flange thickness
tp : plate thickness
ts : slab thickness
tw : web thickness
V : shear force
Vb : base shear
Vw : wind speed
W : wind load
Wt : weight of equipment or building for seismic calculation
Z : seismic zone factor
z : total height of structure in wind force consideration
θ : roof lean angle
d : deflection or settlement
μ : poisson ratio
Sheet 6 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9

2.0 DESIGN ANALYSIS

2.1 Design Criteria


- Steel design using Allowable Stress Design method including concrete bearing at steel connection
to concrete member
- ETABS using Y notation for vertical axis and X and Y for both horizontal axis. In this case, all
ETABS output shall only be used for software usage.
- Unfactored loading combination is used for checking the axial and horizontal capacity of pile
foundation and achor bolt design
- Factored loading combination is subsequently used for reinforced concrete design
- Earthquake load design refer to SNI 03-1726-2012.

2.2 Design Load


The following loads and forces are considered in the design of pile foundation :

2.2.1 Dead Load (D)


Selfweight of structure including, but not limited to, footing and pedestal.
2.2.1.1 Selfweight (Sw)
Selfweight of structure including, but not limited to, structural steel member, footing and pedestal.
2.2.1.2 Super Imposed Dead Load)
Super Imposed Dead Load including but not limited to partition and finishing.
Both self weight and super imposed dead load will be calculated as dead load in load combination.
2.2.2 Live Load (L)
Live load is any load not permanently fixed to the structures, e.g. loading caused by personnel,
furniture, tools, or traffic as usage of building.
Please refer to attachment A.
2.2.3 Roof Live Load (Lr)
Roof live load is any load not permanently fixed to the structures, e.g. loading caused by personnel,
furniture, tools, or traffic on roof floor plan as special condition such as maintenance. Roof live load
shall be 1 kN point load or 1 kN/m2 area load.

2.2.4 Rain Load (R)


Rain load is load caused by ponding effect on exposed floor plan which is 0.2kN/m2
Please refer to attachment A.
2.2.5 Crane Load (Impact Load)
Load impact due to crane operational.
Please refer to attachment A.
2.2.6 Wind Load (W)
Vw = 35,00 m/s
Exposure = C (Ref. 4 Table 6-2)
Structure Category = III (Ref. 4 Table 1-1)
Kd = 0,95 (Ref. 4 Table 6-4)
Kz = 0,85 (Ref. 4 Table 6-3)
Kzt = 1,00 (Ref 4 Figure. 6.4)
I = 1,15 (Ref. 4 Table 6-1)
2
qz = 0.613 Kz Kzt Kd Vw I (Ref 4 Sect. 6.5.10)
= 0,613 x 0,85 x 1 x 0,95 x 35^2 x 1,15
= 697,33 N/m2
Sheet 7 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9
2.2.7 Earthquake Load (EQ)
Earthquake load is calculated in accordance with SNI 03-1726-2012
Soil Type = Soft Soil (SE) (Ref. 1 sect 5.3)
Response acceleration = 0.25 - 0.3 g at t = 0.2s (Ref. 1 sect. 6.2)
0.2 - 0.25 g at t = 1 s (Ref. 1 sect. 6.2)
Ie Importance factor = 1,50 (Ref. 1 sect 6.1)

2.3 Load Combination

2.3.1 Factored Load Combination


The following factored load combination is used to design concrete foundation reinforcement by
Load and Resistance Factored Design method:
2.3.1.1 Construction Condition
ULC1 1.2D + 1.6L + 0.8(WX/WY)
ULC2 1.2D + 1L + 1.6(WX/WY)
ULC3 1.2D + 1To + 1Ro + 1Po + 1H + 1.6(WX/WY)
2.3.1.2 Test Condition
ULC4 1.4D
2.3.1.3 Normal Condition
ULC5 1.2D + 1.6To + 1.6Ro + 1.6C + 1.6Po + 1.6H + 0.8(WX/WY)
ULC6 1.2D + 1L + 1.0(EX/EY) + 1.0C + 0.2Ro +0.2H
2.3.141 Severe Condition
ULC7 0.9D + 1.0(EX/EY) + 1.6Ro + 1.6H
ULC8 0.9D + 1.6(WX/WY) + 1.6Mo + 1.6Po + 1.6Ro
ULC9 1.2D + 1.6L + 1.6C + 0.5To + 0.5Ro + 0.5Po + 0.5H
ULC10 1.2D + 0.5To + 0.5Ro + 0.5C + 0.5Po + 0.5H + 1L
ULC11 0.9D + 0.5To + 0.5Ro + 0.5C + 0.5Po + 0.5H

2.3.2 Unfactored Load Combination


The following unfactored load combination is used to check piling stability
by Allowable Stress Design

2.3.2.1 Construction Condition:


LC 1 1.0*D + 1.0*D(E) + 1.0*L + 1.0*To + 1.0*Ro + 1.0*C + 1.0*Mo
LC 2 1.0*D + 1.0*D(E) + 1.0*L + 1.0*C + 1.0*Mo + 1.0*W
LC 3 1.0*D + 1.0*D(E) + 1.0*C + 1.0*Mo + 1.0*W

2.3.2.2 Test Condition:


LC 4 1.0*D + 1.0*D(T) + 1.0*L + 1.0*To + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*Mo + 1.0*W

2.3.2.3 Normal Condition:


LC 5 1.0*D + 1.0*D(O) + 1.0*L + 1.0*To + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*Mo
LC 6 1.0*D + 1.0*D(O) + 1.0*L + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*Mo

2.3.2.4 Severe Condition:


LC 7 0.6*D + + 0.6*D(O) + 1.0*L + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*Mo + 0.7*E
LC 8 0.6*D + 0.6*D(O) + 1.0*Ro + 1.0*C + 1.0*Mo + 0.7*E
LC 9 1.0 D + 1.0*L + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*W
LC 10 1.0*D + 1.0*D(O) + 1.0*Ro + 1.0*C + 1.0*Mo + 1.0*W
LC 11 0.6*D + 0.6*D(O) + 1.0*L + 1.0*Ro + 1.0*C + 1.0*Po + 1.0*Mo + 1.0*H
Sheet 8 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9

3.0 SUMMARY ACTUAL RATIO OF PIPERACK

Summary Actual Ratio of Piperack


The following table summarizes the design result of steel structures

Member Properties Maximum Ratio Remark Noted

Column (C-1) HEB.320x310x13.1x20.6 0,346 < 1...O.K. Existing


Column (C-3) WH.250x250x9x14 0,757 < 1...O.K. New Structure
Beam (B-1) HEB.360x360x12.3x19.8 0,078 < 1...O.K. Existing
Beam (B-3) WH.250x250x9x14 0,278 < 1...O.K. Existing
Beam (B-3) WH.250x250x9x14 0,235 < 1...O.K. New Structure
Beam (BR-1) WH.250x250x9x14 0,109 < 1...O.K. Existing
Beam (BR-1) WH.250x250x9x14 0,129 < 1...O.K. New Structure

4.0 FOOT FOUNDATION AND BORE PILE DESIGN SUMMARY


Based on the given condition in the structural analysis, the piling and concrete design of T Pipe Rack area H2
PSA package foundation considered adequate the design criteria.

Lf

ey

1
bf

y ex

Figure 6.1: Pipe Rack Area New H2 PSA Foundation Top View
Sheet 9 of 9

JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : 1-9

Pile Data:
npile number of pile 1
ODpi pile diameter 450 mm
Lpi pile length 38 m

Pile Cap / Footing Dimension:


df distance from edge to the center of pile cap 600 mm
bf pile cap at width 1200 mm
hf pile cap thickness 500 mm
lf pile cap length 1200 mm
hf pile cap thickness 500 mm

Pedestal Dimension :
Wp Width of pedestal 400 mm
Lp Length of pedestal 400 mm
hp Pedestal thickness 500 mm
ha Pedestal above ground level 300 mm
hb Pedestal below ground level 200 mm

Pile Design Summary

Ratio ≤ 0,75

n Pile Max. Pu
Node Max. H Ratio Remarks
required Ratio
88 1 0,048 0,00012 Pass,OK!
89 1 0,048 0,00012 Pass,OK!
90 1 0,111 0,00013 Pass,OK!
91 1 0,111 0,00013 Pass,OK!
92 1 0,116 0,00014 Pass,OK!
93 1 0,119 0,00014 Pass,OK!

Pile Cap Rebar Arrangement:


Top Reinforcement (two-way reinforcement) D16 - 150
Bottom Reinforcement (two way reinforcement) D16 - 150
Skin Reinforcement 1- D.13

Pedestal Rebar Arrangement:


Pedestal Vertical Reinforcement 8D16
Pedestal Stirup Reinforcement 1leg D10-150

Bore Pile Rebar Arrangement:


Main Reinforcement Bore Pile 8 - D16
Spiral Stirrup Bore Pile 1leg D10-150
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : A.1 - 3

ATTACHMENT A
MODELING STEEL STRUCTURE DESIGN
Sheet A. 1 of 3

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : A.1 - 3

MODELING DESIGN OF PIPE RACK H2 PSA

4800 4800

TOP VIEW

SIDE VIEW
Sheet A. 2 of 3

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : A.1 - 3

FRAMING LINE 120 001A/B

FRAMING LINE NEW 002A/B


Sheet A. 3 of 3

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : A.1 - 3

FRAMING LINE NEW 001A/B

ETABS MODELING PIPE RACK H2 PSA


Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B.1 - 11

ATTACHMENT B
LOAD CALCULATION
Sheet B. 1 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

ATTACHMENT B
LOAD CALCULATION

B.1 Dead Load (D)


Dead Load data from Pipping Engineer :

B.1A Existing Frame Line 120 001 A/B


Wide at Center = 8,7 m
Wide at Left Side = 1,357 m
Elevation Length Unit Weight LengthxWeight Line Load
No Remarks
mm m' kg/m kg kN
1 6509 5,43 517,23 2810,37 3,17 Center
2 6509 5,43 16,32 88,67 0,65 Edge Left

B.1B New Frame Line 120 001 A/B


Wide at Center = 8,7 m

Elevation Length Unit Weight LengthxWeight Line Load


No Remarks
mm m' kg/m kg kN
1 10000 10,55 501,1 5286,61 5,96 Center

B.1C Existing Frame Line Edge 120 A/B


Wide at Center = 8,7 m

Elevation Length Unit Weight LengthxWeight Line Load


No Remarks
mm m' kg/m kg kN
1 6509 5,89 517,23 3045,45 3,44 Center
2 6509 5,89 16,32 96,12 0,11 Edge Left
Sheet B. 2 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11
B.1D New Frame Line new 002 A/B
Wide at Center = 8,7 m

Elevation Length Unit Weight LengthxWeight Line Load


No Remarks
mm m' kg/m kg kN
1 10000 14,05 501,1 7038,20 7,94 Center

B.1E New Frame Line new 001 A/B


Wide at Center = 8,7 m

Elevation Length Unit Weight LengthxWeight Line Load


No Remarks
mm m' kg/m kg kN
1 6509 6,62 250,55 3315,81 3,74 Center

Fig. B.1.1 Dead Load


Sheet B. 3 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

B.2 Live Load (L)

Fig. B.2.1 live load for maintenance is = 0.98 kN/m, Which distributed line load

B.3 Rain Load (R)


Rain Load is = 0,20 kN/m2, which will be distributed to be line load.
For New pipe rack frame 120 001 A/B
Ls Frame span = 5,44 m
qL Frame live load = 0,2*5,44
= 1,07 kN/m

For Existing pipe rack frame edge 120 A/B


Ls Floor span = 2,39 m
qL Floor live load (1 Row) = 0,2*2,39
= 0,47 kN/m

For New pipe rack frame New 002 A/B


Ls Floor span = 12,3 m
qL Floor live load (2 Row) = 0,2*12,3 / 2
= 1,21 kN/m

For New pipe rack frame New 001 A/B


Ls Floor span = 4,8 m
qL Floor live load (2 Row) = 0,2*4,8 / 2
= 0,47 kN/m
Sheet B. 4 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

Fig. B.3.1 Rain load

B.4 Wind Load (W)


h Mean roof height = 10,00 m
Vw Wind Velocity = 35,00 m/s (15km/hour)
Exposure = C (Ref. 4 Table 6-2)
Structure Category = III (Ref. 4 Table 1-1)
Kd Directionality factor = 0,95 (Ref. 4 Table 6-4)
Kz Velocity pressure exposure (Ref. 4 Table 6-3)
= 0,85
coefficient
Kzt Topographic factor = 1 (Ref 4 Figure. 6.4)
I Importance factor = 1,15 (Ref. 4 Table 6-1)

qz = 0.613 Kz Kzt Kd Vw2 I (Ref 4 Sect. 6.5.10)


= 0,613 x 0,85 x 1 x 0,95 x 35^2 x 1,15
= 697,33 N/m2
Sheet B. 5 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

Fig 4.1 External Pressure Coefficient

Fig 4.2 Internal Pressure Coefficient

Fig 4.2 Terrain Exposure Constants


Sheet B. 6 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

8700 mm 8700 mm

6000 mm
6000 mm
Wy
PLAN PLAN

b) Wx
a)
Fig. C.4.3 Wind Direction

Data :
h height of Structure = 10,00 m
L Length of building = 15,00 m
B Width of building = 8,70 m
ẑ The equivalent height = 6 m
gQ = 3,40 (Ref 8 Section. 6.5.8)
gv = 3,40 (Ref 8 Section. 6.5.8)
c = 0,15 (Figure 4.2)
l = 650 ft (Figure 4.2)
= 198,2 m
ϵ = 0,125
θ = 0o
qh = 697,33 N/m2
Lẑ = 198,2 x (33/6)^0,125
= 160,162
Iẑ = 0,15 x (6/33)^1/6
= 0,199
Q = ( 1 / (1 + (0.63x(((8,7+10)/160,162)^0.63)) ) ^0.5
= 0,927

Gust Effect Factor (G) :

G =
0.925 ((1+1.7 x gQ x Iẑ x Q) / (1+1.7 x gv x Iẑ))
= 0.925x((1+1.7x3,4x0,199x0,927)/(1+1.7x3,4x0,199))
= 0,889
h/L = 1,149
Cp = 0,70 (Wy ) (Figure 4.1)
0,18 (Wx Tension) (Figure 4.1)
GCpi = 0 ( Compression ) (Figure 4.2)
0 ( Tension ) (Figure 4.2)

Design Wind Load (P) Existing


P ( Wx ) = (( 697,33 x 0,889 x 0,18 ) - ( 0 )) / 1000
= 0,11159 kN/m2
P ( Wy ) = (( 697,33 x 0,889 x 0,7 ) - ( 0 )) / 1000
= 0,43395 kN/m2
Sheet B. 7 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

Wind in X-Direction
Ls Frame Line 120 001 A/B = 16,78 m
q wind = 0,112 * 16,78
= 1,873 kN
Ls Frame Line New 002 A/B = 12,30 m
q wind = 0,112 * 12,3
= 1,373 kN
Ls Frame Line New 001 A/B = 4,80 m
q wind = 0,112 * 4,8
= 0,536 kN

Fig. B.4.1 15 km/hour Wind Load X direction


Sheet B. 8 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11
Wind in Y-Direction
Ls Frame Line A = 4,35 m
q wind = 0,434 * 4,35
= 1,888 kN/m

Ls Frame Line B = 4,35 m


q wind = 0,434 * 4,35
= 1,888 kN/m

Fig. B.4.2 15 km/hour Wind Load Y direction


Sheet B. 9 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

B.6 Earthquake Load

Earthquake load is calculated in accordance with SNI 03-1726-2012


Soil Type = Soft Soil (SE) (Ref. 1 sect 5.3)
Response acceleration = 0.25 - 0.3 g at t = 0.2s (Ref. 1 sect. 6.2)
0.2 - 0.25 g at t = 1 s
Ie Importance factor = 1,50 (Ref. 1 tabel 2)
Ss PGA at short period = 0,281 (Ref. 1 sect. 6.2)
S1 PGA at 1sec period = 0,209 (Ref. 1 sect. 6.2)
= 2,34 Fa, at t = 0.2s (Ref. 1 tabel 4)
Location Coefficient (interpolated)
= 3,16 Fv, at t = 1s (Ref. 1 tabel 5)
x
Ta Period of structure = Ct*hn
= 0,0724 x 10^0,8
= 0,46
Ct Period coefficient 1 = 0,0724 (for Steel)
x Period coefficient 2 = 0,80 (for Steel)
hn Height of structure = 10,00 (meter)

Based on the seismic properties above, the response spectra could be developed below:
Seismic Acceleration (Sa)

0.205 1.025
T0 T1

Period (T in Second)

SDS at t = 0.2s = ⅔ (Fa x Ss) PGA parameter


= ⅔ (2,34 x 0,281) at t=0.2s
= 0,438

SD1 at t = 1s = ⅔ (Fv x S1) PGA parameter


= ⅔ (3,16 x 0,209) at t=1s
= 0,441

Reduction factor, R = 3,25 (Ref. 1 sect 7.2.2)


(for framing steel building ordinary bracing)
Sheet B. 10 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

Cs Seismic response coeff = SDS x Ie/R


= 0,439 x 1,5 / 3,25
= 0,202

CsmaxMaximum Cs value = (SD1 x Ie) / (Ta x R)


= (0,441 x 1,5) / (0,46 x 3,25)
= 0,442

Csmin Minimum Cs value = 0.044 x SDS x Ie


= 0.044 x 0,4384 x 1,5
= 0,029

Wteff Effective seismic load = E, or Dq


Wtseismic= Dp + E

The structure of foundation is embedded to the ground, thus


Wtseismic= E

Vs Base shear design = Cs x Wteff


0,203 x Wteff
*Vsx = Vsz = Vs = 28,635 kN

Note: * Seismic in X and Y direction shall be threated as equal

Based on shear calculation above, equivalent lateral load for each joint will be as follows:

wi hi wihi Fi Fx Fy
Node
(kN) (m) (kN.m) kN Fi x t2 (kN) Fi x t3 (kN)
88 12,24 10,00 122,40 2,48 0,50 0,50
89 12,29 10,00 122,90 2,49 0,50 0,50
90 28,28 10,00 282,80 5,74 1,15 1,15
91 28,36 10,00 283,60 5,76 1,15 1,15
92 29,55 10,00 295,50 6,00 1,20 1,20
93 30,34 10,00 303,40 6,16 1,23 1,23
141,06 1410,60
Sheet B. 11 of 11
Pembangunan 1 (Satu) Unit Fasilitas
JOB No Document No
Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : B. 1 - 11

Fig. C.6.1 Fx Load on Column

Fig. C.6.2 Fy Load on Column


Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : C.1 - 4

ATTACHMENT C
ACTUAL RATIO
Sheet C. 1 of 4

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : C.1 - 4

ATTACHMENT C
ACTUAL RATIO
C.1 Overall Ratio
Sheet C. 2 of 4

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : C.1 - 4

C.2 Coloumn Ratio

Existing Column Ratio Summary


Member No. Properties Maximum Ratio
C53 HEB.320x310x13.1x20.6 0,34
C55 HEB.320x310x13.1x20.6 0,346
Maximum Column Existing Ratio
Section ID : C-1
Properties : HEB.320x310x13.1x20.6
Max. Ratio : 0,346 ...O.K < 1.

New Column Ratio Summary


Member No. Properties Maximum Ratio
C46 WH.250x250x9x14 0,329
C47 WH.250x250x9x14 0,348
C49 WH.250x250x9x14 0,757
C51 WH.250x250x9x14 0,419
C53 WH.250x250x9x15 0,16
C55 WH.250x250x9x16 0,162
Maximum New Column Ratio
Section ID : C-3
Properties : WH.250x250x9x14
Max. Ratio : 0,757 ...O.K < 1.

C.3 Beam Ratio

Existing Beam Ratio Summary


Member No. Properties Maximum Ratio
B168 HEB.360x360x12.3x19.8 0,047
B169 HEB.360x360x12.3x19.8 0,002
B170 HEB.360x360x12.3x19.8 0,002
B190 HEB.360x360x12.3x19.8 0,074
B191 HEB.360x360x12.3x19.8 0,078
B192 HEB.360x360x12.3x19.8 0,074
Maximum Beam Existing Ratio
Section ID : B-1
Properties : HEB.360x360x12.3x19.8
Max. Ratio : 0,078 ...O.K < 1.

Existing Beam Ratio Summary


Member No. Properties Maximum Ratio
B168 WH.250x250x9x14 0,193
B244 WH.250x250x9x14 0,098
B245 WH.250x250x9x14 0,278
B247 WH.250x250x9x14 0,004
Maximum Beam Existing Ratio
Section ID : B-3
Properties : WH.250x250x9x14
Max. Ratio : 0,278 ...O.K < 1.
Sheet C. 3 of 4

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : C.1 - 4

New Beam Ratio Summary


Member No. Properties Maximum Ratio
B171 WH.250x250x9x14 0,235
B204 WH.250x250x9x14 0,057
B225 WH.250x250x9x14 0
B235 WH.250x250x9x14 0,066
B242 WH.250x250x9x14 0,057
B243 WH.250x250x9x14 0,152
B246 WH.250x250x9x14 0,067
B254 WH.250x250x9x14 0,031
B255 WH.250x250x9x14 0,031
B287 WH.250x250x9x14 0,109
B288 WH.250x250x9x14 0,13
B289 WH.250x250x9x14 0,108
B291 WH.250x250x9x15 0,119
B305 WH.250x250x9x16 0,111
B306 WH.250x250x9x17 0,186
B307 WH.250x250x9x17 0,111
B308 WH.250x250x9x17 0,186
B310 WH.250x250x9x17 0,106
B311 WH.250x250x9x18 0,095
B315 WH.250x250x9x18 0,026
B316 WH.250x250x9x18 0,043
Maximum New Beam Ratio
Section ID : B-3
Properties : WH.250x250x9x14
Max. Ratio : 0,235 ...O.K < 1.

C.4 Breasing Ratio

Existing Bresing Ratio Summary


Member No. Properties Maximum Ratio
D53 WH.250x250x9x14 0,024
D54 WH.250x250x9x14 0,046
D55 WH.250x250x9x14 0,108
D56 WH.250x250x9x14 0,027
D57 WH.250x250x9x14 0,046
D58 WH.250x250x9x14 0,109
Maximum Beam Existing Ratio
Section ID : BR-1
Properties : WH.250x250x9x14
Max. Ratio : 0,109 ...O.K < 1.
Sheet C. 4 of 4

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No

External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015

Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019


REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : C.1 - 4

New Bresing Ratio Summary


Member No. Properties Maximum Ratio
D77 WH.250x250x9x14 0,023
D78 WH.250x250x9x14 0,129
D79 WH.250x250x9x14 0,11
D80 WH.250x250x9x14 0,02
D81 WH.250x250x9x14 0,129
D82 WH.250x250x9x14 0,112
D133 WH.250x250x9x14 0,079
D134 WH.250x250x9x14 0,071
B293 WH.250x250x9x14 0,099
B294 WH.250x250x9x14 0,1
B295 WH.250x250x9x14 0,088
B296 WH.250x250x9x14 0,088
Maximum New Beam Ratio
Section ID : BR-1
Properties : WH.250x250x9x14
Max. Ratio : 0,129 ...O.K < 1.
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11

ATTACHMENT D
BORE PILE CAPACITY AND SOIL PROPERTIES
Sheet D. 1 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11

ATTACHMENT D - BORE PILE CAPACITY AND SOIL PROPERTIES

D.1 Bore Pile Capacity

Bore Pile Dia. 450 mm


Depth 38 m(1)
Using the value of pile bearing capacity of PC Piles Dia 450 mm.

Pile capacity shall be described as follows :


Qcomp(1) Qten* Qlat(1)
Condition
( kN ) ( kN ) ( kN )
Allowable Capacity :
Permanent 1131,58 339,48 61745,31
Temporary, operating condition (increase 33%)(2) 1508,78 452,63 82327,08
Temporary, test condition (increase 20%)(3) 1433,34 430,00 78210,73
note : * in common practice Qten equals to 30% of compression capacity.

Allowable single pile capacity in group :


where,
Group efficiency, h : 1,00 unitless .. for axial capacity
Group efficiency, h : 1,00 unitless .. for lateral capacity

BORE PILE CAPACITY

Metode Luciano Decourt


QL = Qp + Qs DESIGN SOIL PARAMETERS : BH-02
Qp = qp x Ap = α . (Ňp x K) x Ap LOCATION : RU II DUMAI
Qs = qs x As = (Ňs/3 + 1 ) x As GWL : - 1.0 M

Diameter = 0,45 m K value (Coefficient of Soil Characteristics)


Space of Pile = 3D ~ 6D 12 t/m2 Clay
(Used max. 6D) = 2,7 m 20 t/m2 Clay - Silt
25 t/m2 Silt - Sand
40 t/m2 Sand
Formula :
Ns = 3  N  50 fc' bore pile = 37 Mpa
Np = N Value α = 0,85
Ap = p / 4 * D2 Depth = 38 Meter
As = p * D * L q ijin = 115,35 Ton
Sheet D. 2 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11

BORE PILE CAPACITY TABLE :

Depth S.P.T# N Ap As Qp Qs Qult Qijin (ton)


NP Ňp 2
Ňs Ňs/3 2
(m) (N) koreksi (m ) (m ) (ton) (ton) (ton) SF = 3 SF = 2
0 0,00 0,00 1,8 2,3 0,16 0,0 0,00 0,00 2,92 0,00 2,92 0,97 1,46
1 0,50 0,50 2,8 2,8 0,16 0,3 0,08 1,41 4,542 1,53 6,07 2,02 3,04
2 1,00 1,00 3,8 3,8 0,16 0,5 0,17 2,83 6,165 3,30 9,46 3,15 4,73
3 0,50 0,50 4,8 4,8 0,16 0,5 0,17 4,24 7,787 4,95 12,73 4,24 6,37
4 0,00 0,00 5,8 5,8 0,16 0,4 0,13 5,65 9,409 6,41 15,82 5,27 7,91
5 0,00 0,00 6,8 6,8 0,16 0,3 0,11 7,07 11,0 7,85 18,89 6,30 9,44
6 0,00 0,00 7,8 7,8 0,16 0,3 0,10 8,48 12,65 9,29 21,94 7,31 10,97
7 0,50 0,50 8,8 8,8 0,16 0,3 0,10 9,90 14,28 10,93 25,20 8,40 12,60
8 1,00 1,00 9,8 9,8 0,16 0,4 0,13 11,31 15,9 12,78 28,67 9,56 14,34
9 0,50 0,50 10,8 10,8 0,16 0,4 0,13 12,72 17,52 14,42 31,94 10,65 15,97
10 0,00 0,00 11,8 11,8 0,16 0,4 0,12 14,14 19,14 15,85 34,99 11,66 17,50
11 0,50 0,50 12,8 12,8 0,16 0,4 0,13 15,55 20,76 17,49 38,26 12,75 19,13
12 1,00 1,00 13,8 13,8 0,16 0,4 0,14 16,96 22,39 19,36 41,74 13,91 20,87
13 1,50 1,50 14,8 14,8 0,16 0,5 0,17 18,38 24,0 21,44 45,45 15,15 22,73
14 2,00 2,00 15,8 15,8 0,16 0,6 0,20 19,79 25,63 23,75 49,38 16,46 24,69
15 2,00 2,00 16,8 16,8 0,16 0,7 0,23 21,21 27,25 26,07 53,32 17,77 26,66
16 2,00 2,00 17,8 17,8 0,16 0,8 0,25 22,62 28,88 28,39 57,26 19,09 28,63
17 3,00 3,00 18,8 18,8 0,16 0,9 0,30 24,03 30,5 31,15 61,65 20,55 30,83
18 4,00 4,00 19,8 19,8 0,16 1,1 0,35 25,45 32,12 34,38 66,50 22,17 33,25
19 9,50 9,50 20,8 20,8 0,16 1,5 0,49 26,86 33,74 40,07 73,81 24,60 36,90
20 15,00 15,00 21,8 21,8 0,16 2,1 0,71 28,27 35,36 48,25 83,61 27,87 41,81
21 9,50 9,50 22,8 22,8 0,16 2,5 0,82 29,69 37,0 53,98 90,97 30,32 45,48
22 4,00 4,00 23,8 23,8 0,16 2,5 0,84 31,10 38,61 57,25 95,85 31,95 47,93
23 5,50 5,50 24,8 24,8 0,16 2,6 0,88 32,52 40,23 61,19 101,42 33,81 50,71
24 7,00 7,00 25,8 25,8 0,16 2,8 0,94 33,93 41,85 65,82 107,68 35,89 53,84
25 17,00 17,00 26,8 26,8 0,16 3,4 1,12 35,34 43,48 74,99 118,47 39,49 59,23
26 27,00 27,00 27,8 27,8 0,16 4,2 1,41 36,76 45,1 88,72 133,81 44,60 66,91
27 22,00 22,00 28,8 28,8 0,16 4,9 1,63 38,17 46,72 100,20 146,92 48,97 73,46
28 17,00 17,00 29,8 29,8 0,16 5,3 1,76 39,58 48,34 109,42 157,77 52,59 78,88
29 16,00 16,00 30,8 30,8 0,16 5,7 1,88 41,00 50,0 118,21 168,18 56,06 84,09
30 15,00 15,00 31,8 31,8 0,16 6,0 1,98 42,41 51,59 126,55 178,14 59,38 89,07
31 25,00 25,00 32,8 32,8 0,16 6,5 2,18 43,83 53,21 139,46 192,67 64,22 96,34
32 35,00 35,00 33,8 33,8 0,16 7,4 2,47 45,24 54,83 156,97 211,80 70,60 105,90
33 47,50 47,50 34,8 34,8 0,16 8,6 2,86 46,65 56,45 180,21 236,66 78,89 118,33
34 60,00 60,00 35,8 35,8 0,16 10,1 3,35 48,07 58,08 209,20 267,28 89,09 133,64
35 36,00 36,00 36,8 36,8 0,16 10,8 3,59 49,48 59,7 227,24 286,94 95,65 143,47
36 12,00 12,00 37,8 37,8 0,16 10,8 3,60 50,89 61,32 234,29 295,62 98,54 147,81
37 36,00 36,00 38,8 38,8 0,16 11,5 3,82 52,31 62,94 252,36 315,30 105,10 157,65
38 60,00 60,00 39,8 39,8 0,16 12,7 4,24 53,72 64,57 281,46 346,03 115,34 173,01
39 60,00 60,00 40,8 40,8 0,16 13,9 4,63 55,13 66,19 310,59 376,78 125,59 188,39
40 60,00 60,00 41,8 41,8 0,16 15,0 5,01 56,55 67,81 339,75 407,56 135,85 203,78
41 60,00 60,00 42,8 42,8 0,16 16,1 5,37 57,96 69,43 368,94 438,37 146,12 219,18
42 60,00 60,00 43,8 43,8 0,16 17,1 5,71 59,38 71,05 398,14 469,20 156,40 234,60
43 60,00 60,00 44,8 44,8 0,16 18,1 6,03 60,79 72,68 427,37 500,05 166,68 250,02
44 60,00 60,00 45,8 30,2 0,16 19,0 6,34 62,20 74,3 456,62 530,92 176,97 265,46
#
note : Used interpolation formula
Sheet D. 3 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11

D.2 LATERAL CAPACITY PILE

Equation (1) + (2) + (3) & (4) :

Ultimit lateral force at the end of pile, by taking the moment on the lower end :

Hu = 1/2. g . d .L3 . Kp ……………………………... ( 1 )


e+L

Maximum moment occurs at "f" distance below ground level :

H u = (3/2) . g . D . Kp . f ……………………………… ( 2 )

and

f = 0.82 . ……………………………… ( 3 )

Maximum moment are expressed by equation :

M max = Hu . (e + 2.f/3) ……………………………… ( 4 )

Pile Diameter D = 0,45 m


Length of Pile L = 38 m
Effective Shear Angle j = 25 kN/m3
Passive Earth Pressure Kp = (1+ SIN j ) / (1 - SIN j ) = 0,77 kN/m3
Unit Weight Dry Soil g = 16,70 m
Lateral load range to ground surface e = 0,2 m

Equation (1) :
Hu = 1/2. g . d .L3 . Kp
e+L

= 1/2 x 16,7 x 0,45 x (38^3) x 0,77


0,2 + 38
= 4157 kN

Equation (2) & (3) :

f = 0.82 .

= 0.82 x ( 4157 / (0,45 x 0,77 x 16,7 )) ^ 0.5


= 21,98 kN

Equation (4) :

M max = Hu . (e + 2.f /3)

= 4157 x ( 0,2 + 2 x (21,98 / 3) )


= 61745,31 kN
Sheet D. 4 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
Sheet D. 5 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
Sheet D. 6 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
Sheet D. 7 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
Sheet D. 8 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
Sheet D. 9 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
D.3 Bore Pile Check Capacity
D.3.1 Support Reaction
Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
88 COMB1 54,44 7,47 -2,11 0,000 0,048 0,00000 1
88 COMB2 53,44 7,68 -1,83 0,000 0,047 0,00000 1
88 COMB3 52,19 6,85 -1,82 3,585 0,046 0,00006 1
88 COMB4 53,79 7,7 -1,94 3,585 0,048 0,00006 1
88 COMB5 50,25 7,03 -1,93 3,585 0,044 0,00006 1
88 COMB6 48,65 6,18 -1,81 3,585 0,043 0,00006 1
88 COMB7 48,4 5,53 -1,8 7,169 0,043 0,00012 1
88 COMB8 51,6 7,24 -2,04 7,169 0,046 0,00012 1
88 COMB9 49,53 6,29 -1,81 3,502 0,044 0,00006 1
88 COMB10 51,16 7,22 -1,9 3,502 0,045 0,00006 1
88 COMB11 35,26 4,82 -1,44 3,502 0,031 0,00006 1
88 COMB12 33,63 3,89 -1,34 3,502 0,030 0,00006 1
88 COMB13 32,49 3,14 -1,34 7,169 0,029 0,00012 1
88 COMB14 35,7 4,85 -1,57 7,169 0,032 0,00012 1

Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
89 COMB1 54,38 -7,41 -2,12 0,000 0,048 0,00000 1
89 COMB2 53,39 -7,63 -1,84 0,000 0,047 0,00000 1
89 COMB3 54,64 -8,46 -1,85 3,585 0,048 0,00006 1
89 COMB4 53,74 -7,64 -1,95 3,585 0,047 0,00006 1
89 COMB5 50,2 -6,98 -1,94 3,585 0,044 0,00006 1
89 COMB6 51,1 -7,79 -1,84 3,585 0,045 0,00006 1
89 COMB7 53,35 -8,82 -1,85 7,169 0,047 0,00012 1
89 COMB8 51,55 -7,19 -2,06 7,169 0,046 0,00012 1
89 COMB9 52,21 -8,06 -1,84 3,516 0,046 0,00006 1
89 COMB10 51,11 -7,16 -1,92 3,502 0,045 0,00006 1
89 COMB11 35,22 -4,78 -1,45 3,502 0,031 0,00006 1
89 COMB12 36,32 -5,68 -1,37 3,502 0,032 0,00006 1
89 COMB13 37,46 -6,43 -1,38 7,169 0,033 0,00012 1
89 COMB14 35,66 -4,8 -1,59 7,169 0,032 0,00012 1

Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
90 COMB1 125,78 -0,33 -13,1 0,000 0,111 0,00000 1
90 COMB2 114,7 -0,45 -11,18 0,000 0,101 0,00000 1
90 COMB3 112,79 -0,99 -11,02 3,585 0,100 0,00006 1
90 COMB4 116,32 -0,48 -13,05 3,585 0,103 0,00006 1
90 COMB5 117,9 -0,53 -13,07 3,585 0,104 0,00006 1
90 COMB6 114,37 -1,04 -11,04 3,585 0,101 0,00006 1
90 COMB7 108,3 -1,46 -10,87 7,169 0,096 0,00012 1
90 COMB8 115,36 -0,45 -14,93 7,169 0,102 0,00012 1
90 COMB9 110,06 -0,98 -11,01 8,092 0,097 0,00013 1
90 COMB10 113,33 -0,41 -12,6 8,092 0,100 0,00013 1
90 COMB11 82,08 -0,24 -9,82 8,092 0,073 0,00013 1
90 COMB12 78,81 -0,8 -8,23 8,092 0,070 0,00013 1
90 COMB13 77,04 -1,29 -8,09 7,169 0,068 0,00012 1
90 COMB14 84,1 -0,28 -12,15 7,169 0,074 0,00012 1
Sheet D. 10 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11

Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
91 COMB1 126,17 0,31 -13,59 0,000 0,111 0,00000 1
91 COMB2 115,03 0,43 -11,6 0,000 0,102 0,00000 1
91 COMB3 116,94 -0,11 -11,77 3,585 0,103 0,00006 1
91 COMB4 116,66 0,46 -13,48 3,585 0,103 0,00006 1
91 COMB5 118,24 0,51 -13,5 3,585 0,104 0,00006 1
91 COMB6 118,52 -0,06 -11,79 3,585 0,105 0,00006 1
91 COMB7 116,27 -0,7 -11,95 7,169 0,103 0,00012 1
91 COMB8 115,71 0,43 -15,37 7,169 0,102 0,00012 1
91 COMB9 114,5 -0,22 -11,81 8,114 0,101 0,00013 1
91 COMB10 113,68 0,39 -13,03 8,114 0,100 0,00013 1
91 COMB11 82,34 0,22 -10,15 8,114 0,073 0,00013 1
91 COMB12 83,16 -0,39 -8,92 8,114 0,073 0,00013 1
91 COMB13 84,93 -0,87 -9,07 7,169 0,075 0,00012 1
91 COMB14 84,37 0,26 -12,49 7,169 0,075 0,00012 1

Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
92 COMB1 131,44 1,64 15,07 0,000 0,116 0,00000 1
92 COMB2 119,45 1,39 12,89 0,000 0,106 0,00000 1
92 COMB3 117,59 0,26 13,07 3,585 0,104 0,00006 1
92 COMB4 117,48 1,38 10,88 3,585 0,104 0,00006 1
92 COMB5 118,12 1,38 10,89 3,585 0,104 0,00006 1
92 COMB6 118,22 0,26 13,08 3,585 0,104 0,00006 1
92 COMB7 113,18 -0,86 13,26 7,169 0,100 0,00012 1
92 COMB8 112,96 1,38 8,88 7,169 0,100 0,00012 1
92 COMB9 114,61 0,03 13,09 8,455 0,101 0,00014 1
92 COMB10 115,42 1,39 11,53 8,455 0,102 0,00014 1
92 COMB11 83,01 1,04 8,31 8,455 0,073 0,00014 1
92 COMB12 82,2 -0,31 9,87 8,455 0,073 0,00014 1
92 COMB13 80,76 -1,2 10,05 7,169 0,071 0,00012 1
92 COMB14 80,55 1,04 5,67 7,169 0,071 0,00012 1

Pu Hx Hy HR Permanen
Max Pu Max H
Node L/C Fz (kN) Fx (kN) Fy (kN) FH (kN) N
Ratio Ratio
93 COMB1 134,97 -1,68 15,85 0,000 0,119 0,00000 1
93 COMB2 122,49 -1,42 13,56 0,000 0,108 0,00000 1
93 COMB3 124,35 -2,55 13,38 3,585 0,110 0,00006 1
93 COMB4 120,5 -1,42 11,55 3,585 0,106 0,00006 1
93 COMB5 121,14 -1,42 11,56 3,585 0,107 0,00006 1
93 COMB6 124,98 -2,55 13,39 3,585 0,110 0,00006 1
93 COMB7 123,67 -3,69 13,21 7,169 0,109 0,00012 1
93 COMB8 115,98 -1,41 9,54 7,169 0,102 0,00012 1
93 COMB9 122,23 -2,8 13,38 8,681 0,108 0,00014 1
93 COMB10 118,44 -1,42 12,19 8,681 0,105 0,00014 1
93 COMB11 85,28 -1,07 8,81 8,681 0,075 0,00014 1
93 COMB12 89,06 -2,45 10 8,681 0,079 0,00014 1
93 COMB13 90,5 -3,34 9,83 7,169 0,080 0,00012 1
93 COMB14 82,81 -1,06 6,16 7,169 0,073 0,00012 1
Sheet D. 11 of 11
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : D.1 - 11
D.3.2 Pile Design Summary

Ratio ≤ 0,75

Node n Pile required Max. Pu Ratio Max. H Ratio Remarks


88 1 0,048 0,00012 Pass,OK!
89 1 0,048 0,00012 Pass,OK!
90 1 0,111 0,00013 Pass,OK!
91 1 0,111 0,00013 Pass,OK!
92 1 0,116 0,00014 Pass,OK!
93 1 0,119 0,00014 Pass,OK!
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E.1 - 5

ATTACHMENT E
FOOT FOUNDATION DESIGN
Sheet E. 1 of 5
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E. 1 - 5

ATTACHMENT E - FOOT FOUNDATION DESIGN


E.1 Pile Cap & Pedestal Design

Pile Group
ODpi Pile diameter 0,45 m
semin Pile minimum distance to foundation's edge (1.25*ODpi) 0,56 m
smin Pile spacing minimum distance (3*ODpi) 1,35 m
Lf

ey

1
Lf

ex
y

x
Figure E1-1 : Foot Foundation Configuration in X and Y Axis

Lp

Ha
Hp
G.L

Hb

Hf

x
Figure E1-2 : Foot Fondation Configuration in X and Z Axis

dx Pile distance to the center of foundation (X direction) 0,000 m


dy Pile distance to the center of foundation (Y direction) 0,000 m

Spx Pile to pile distance (X direction) 0,000 m N/A


Spy Pile to pile distance (Y direction) 0,000 m N/A
ex Pile to edge distance (X direction) 0,600 m Pile Edge Distance is OK!
ey Pile to edge distance (Y direction) 0,600 m Pile Edge Distance is OK!
Sheet E - 2 of 5
JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E.1 - 5
E.2 Support Reaction Data (Etabs Output)

89

88 91

90

93

92

FX FY FZ MX MY MZ
Story Point Load
kN
BASE 88 MAX 7,7 0,01 54,44 0 0 0
BASE 88 MIN -1,04 -2,11 -1,56 0 0 0

BASE 89 MAX -0,01 -0,01 54,64 0 0 0


BASE 89 MIN -8,82 -2,12 0,26 0 0 0

BASE 90 MAX 0,32 0,21 125,78 0 0 0


BASE 90 MIN -1,46 -14,93 -2,39 0 0 0

BASE 91 MAX 0,56 0,03 126,17 0 0 0


BASE 91 MIN -0,87 -15,37 1,23 0 0 0

BASE 92 MAX 1,64 15,07 131,44 0 0 0


BASE 92 MIN -1,41 -2,51 -2,47 0 0 0

BASE 93 MAX 0,01 15,85 134,97 0 0 0


BASE 93 MIN -3,69 -2,52 -2,48 0 0 0
Maximum 134,97 0,00
Sheet E - 3 of 5
JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E.1 - 5
E.3 Reinforcement Calculation
E.3.1 Foundation Dimension
Footing Length (Lf) = 1,2 m
Footing Width (Bf) = 1,2 m
Pedestal Thickness (hp) = 0,5 m
Footing Thickness (hf) = 0,5 m
Pedestal above ground (ha) = 0,3 m
Pedestal under ground (hb) = 0,2 m
Width of pedestal (Wp) = 0,4 m
Length of pedestal (Lp) = 0,4 m

E.3.2 Footing Flexural Reinforcement (Top & Bottom)


Max factored moment (Mu) = Mz = 0,00 kN.m (Etabs Out put)
Footing thickness (hf) = 0,50 m
Total Concrete cover (C) = 50,00 mm
Concrete compresive strength (fc') = 24,9 Mpa
Yield strength steel rebar (fy) = 345 Mpa
Concrete strenght factor (βi) = 0,85
Designed rebar dia. (Ørebar) = 16 mm
Strip width (b) = 1,2 m
Required reinforcement
Safety factor of flexural capacity (ϕ) = 0,9
Footing efective thicknes (d) = hf - c - 0.5 x Ørebar x 10^-3
= 442 mm
= 0,44 m
Require Strenght ultimate (Ru) = Mu / (ᶲ x strip width x d2)
= 0,00 Mpa
Koefisien (m) = fy / (0.85 x fc')
= 16,30
ρ required = (1/m) x (1-(1-2m Ru/fy)^0.5)
= 0,00%
ρ balanced = βi x 0.85fc' x 600
fy x (600+fy)
= 3,31%
ρ max = 0.75 * ρ balanced
= 2,48%
ρ min = 0,18% (ρ min = 1.4/fy if 1.33 x ρ required > 1.4/fy)
(ρ min = 0.18% if 1.33 x ρ required < 1.4/fy)
ρ need = 0,00%
(ρ need = ρ required if ρ required > 1.4/fy)
(ρ need = ρ required * 1.33 but not need to exceed 1.4/fy if ρ required < 1.4/fy)
ρ used = 0,18% < 2,49%……...OK
(ρ used = largest of ρ min or ρ need)
As req = ρ used x b x d
= 955 mm²

Diameter of reinf. Bars = 16 mm


As = 201,06 mm²
No. of bars = A req / As
= 4,749
Spacing = Width / no. of bars
= 0,253 m
= 252,685 mm > 150 mm
Sheet E - 4 of 5
JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E.1 - 5

Check :
Define spacing = 150 mm
As used = 1340,4 mm² per m

a = As x fy
0.85 x fc' x b
= 1.340,42 x 345
25.398,00
= 18,208 mm
f Mn = f As x fy x (d - a/2)
= 180,17 kN.mm
f Mn = 180,17 kN.m > Mu = 0,00 kNm …OK

D16 - 150
Use D16 - 150 for top & bottom flexural reinforcement

Fig B.1 Equipment List


E.3.3 Pedestal Reinforcement Design
Length of pedestal (Lp) = 0,4 m
Width of pedestal (Wp) = 0,4 m
Rebar minimum area (p min * Ap) = 288 mm
Diameter of reinf. Bars = 16 mm
As = 201,06 mm²
Pedestal Area (Ap) = 160000 mm
Rule : Ap ≥ 0,01 --->> Max 1%
A tul. Min
Check : 1600 ≥ 288 Ok
(Space minimum 1.5db --> Check SNI-2847-2002)

No. of bars 2 ≤ 16 Ok => 8,00 ea


No. of bars used = 8,00
Diameter bar Used = 16 mm

8D16
8D16 For Main Vertical Rebar

E.3.4 Shear Pedestal

Maximum ultimate axial (Vu) = (Fz) = 40,19 kN ( Etabs Out )


Diameter of reinf. Bars (ds) = 10 mm
Yield strength steel rebar (fy) = 240 Mpa

Shear Data :
Type Column A 160000 mm2
fc' 24,9 MPa Vc 3366,34 kN
Lp 400 mm ϕVc 2356,44 kN
Wp 400 mm
ϕ 0,7
Sheet E - 5 of 5
JOB No Document No
Pembangunan 1 (Satu) Unit Fasilitas Gas
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : E.1 - 5

Shear capacity Check

Vu < ϕVc
40,19 > 2356,44 Need No Shear Reinforcement

End Span Mid Span


D 10 mm As 78,54 mm2 D 10 mm As 78,54 mm2
leg 1 d 350 mm leg 1 d 350 mm
fy 240 MPa Vs 43,98 kN fy 240 kN Vs 43,98 kN
cov 50 mm ϕVs 30,79 kN cov 50 mm ϕVs 30,79 kN
s 150 mm ϕVn 2387,23 kN s 150 mm ϕVn 2387,23 kN
ϕ
Vu
0,7
40,19 kN
Status
O.K. ϕ
Vu span 40,19
0,7
kN
Status
O.K.
use 1leg D10-150 use 1leg D10-150
Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No
External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : F.1 - 2

ATTACHMENT F
BORE PILE DESIGN
Sheet F - 1 of 2

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No


External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : F. 1 - 2

F. BORE PILE DESIGN

F.1 Reinforcement Calculation


Pile diameter = 450 mm
Max ultimate axial load on pile cap (Vu) = 40,19 kN
Max factored moment (Mu) = 0,00 kN.m
Footing thickness (hf) = 500,00 m
Total Concrete cover (C) = 50,00 mm
Bore Pile Concrete strength (fc') = 37,35 Mpa
Yield strength steel rebar (fy) = 345,00 Mpa
Modulus elastis concrete (Ec) = 28.724 Mpa
Modulus elastis reinforcement (Er) = 18.000 Mpa
Concrete strenght factor (βi) = 0,85
Designed rebar dia. (Ørebar) = 16 mm
Strip width (dia. Pile) = 0,35 m
Safety factor of flexural capacity (ϕ) = 0,8

Rebar Number = 8 ea
Diameter of reinf. Bars = 16 mm
b = 1000 mm
d = 392 mm

Rn = Mu / ϕ
b.d²
= 0,000%

ρb = βi * 0.85 * fc' 600


fy 600 + fy

= 5,000%

ρ max = 0.75 * ρb

= 3,750%

ρ min = 1.4 / fy

= 0,406%

(Ratio Reinforcement)

ρ = 0.85 . f'c 1 - 1 - 2. Rn
fy 0.85 . F'c

= 0,000%

( Condition ρ < ρmin ), then used P = 0,406%

Required reinforcement
As min = p*b*d
= 1591 mm²

8 - D16 As = (n/4 * ز * 3.14)


= 1607,68 mm² Ok...

8 - D16
8 - D16 For Main Vertical Rebar
Sheet F - 2 of 2

Pembangunan 1 (Satu) Unit Fasilitas Gas JOB No Document No


External Kapasitas 57 MMSCFD C/W E20200-15-09 CS-920-016-0015
Accessories Di Kilang RU II Dumai DATE : 4-Apr-2019
REVISION : 2
PT. PERTAMINA (PERSERO) PAGE : F. 1 - 2

Check Shear :

Vc = 1/6 .  f'c *Ødpi * d --->> Vn = Vu / j


= 179677,06 kg = 57,41 kN
= 179,68 kN

jVc = 0.7 * 179,68


= 143,7 kN

Required : Vc > jVc

179,68 > 143,744 …..Ok

Check Shear :

Shear Data :
Type Column
fc' 37,4 MPa Vc 179,7 kN
Ødpi 450 mm ϕVc 125,8 kN
h 1000 mm
ϕ 0,7

Shear capacity Check

Vu < ϕVc
40,2 < 125,78 Need No Shear Reinforcement

End Span Mid Span


D 10 mm As 78,54 mm2 D 10 mm As 78,54 mm2
leg 1 d 925 mm leg 1 d 925 mm
fy 240 MPa Vs 116,24 kN fy 240 kN Vs 116,24 kN
cov 75 mm ϕVs 81,37 kN cov 75 mm ϕVs 81,37 kN
s 150 mm ϕVn 207,14 kN s 150 mm ϕVn 207,14 kN
ϕ
Vu
0,7
40,2 kN
Status
O.K. ϕ
Vu span
0,7
40,2 kN
Status
O.K.
use 1leg D10-150 use 1leg D10-150