Академический Документы
Профессиональный Документы
Культура Документы
1 Manhole Types:
Specifications:
Size: 88*105*126
Specifications:
Size: 80*80*70
Specifications:
Size: 160*180*80
This document is the property of OFT, may not OFT- Optic Fiber Telekomünikasyon San.Tic.Ltd.Şti.
be copied without written permission, Alleben Mah.Atatürk Bulvarı no:36/11 Şahinbey Gaziantep
INTERNAL Te:+90 342 221 01 03 Fax:+90 342 221 01 04
reproduced or disclosed to third parties.
TECHINICAL REQUIREMENT
Prepared Documental Code
Project Department OFT-MENHOL INFRASTRUCTURE TEC REQ
Confirming Control Date Rev. Reference
NIHAT CINDIOGLU MUSTAFA METE 13.05.2011 V.01 OFT-INFRASTRUCTURE
2. Pipe Type:
2.2 3 way duct HDPE pipe
3 way HDPE-100 pipes are used in
construction for both intercity and inner-city
constructions.
Specifications:
Size: 32x32x40mm
3. Warning Tape:
KOREK suburban F / O warning tape used in
the infrastructure network .
Length: 500-1000 m Color: Orange / Black
Font size: 10 cm Belt Size: 20 cm
This document is the property of OFT, may not OFT- Optic Fiber Telekomünikasyon San.Tic.Ltd.Şti.
be copied without written permission, Alleben Mah.Atatürk Bulvarı no:36/11 Şahinbey Gaziantep
INTERNAL Te:+90 342 221 01 03 Fax:+90 342 221 01 04
reproduced or disclosed to third parties.
TECHINICAL REQUIREMENT
Prepared Documental Code
Project Department OFT-MENHOL INFRASTRUCTURE TEC REQ
Confirming Control Date Rev. Reference
NIHAT CINDIOGLU MUSTAFA METE 13.05.2011 V.01 OFT-INFRASTRUCTURE
This document is the property of OFT, may not OFT- Optic Fiber Telekomünikasyon San.Tic.Ltd.Şti.
be copied without written permission, Alleben Mah.Atatürk Bulvarı no:36/11 Şahinbey Gaziantep
INTERNAL Te:+90 342 221 01 03 Fax:+90 342 221 01 04
reproduced or disclosed to third parties.
TECHINICAL REQUIREMENT
Prepared Documental Code
Project Department OFT-MENHOL INFRASTRUCTURE TEC REQ
Confirming Control Date Rev. Reference
NIHAT CINDIOGLU MUSTAFA METE 13.05.2011 V.01 OFT-INFRASTRUCTURE
5. Trenching
5.1 TYPE 10X40 Coated (Stabilized ground)
32x32x40mm
10X40 cm excavation is done.
Ground is corrected.
Concrete
3 way duct HDPE pipe is placed.
Warning tape.
3 way duct HDPE pipe is covered by 30 cm of Warning Tape
concrete.
Pipe
Fiber
This document is the property of OFT, may not OFT- Optic Fiber Telekomünikasyon San.Tic.Ltd.Şti.
be copied without written permission, Alleben Mah.Atatürk Bulvarı no:36/11 Şahinbey Gaziantep
INTERNAL Te:+90 342 221 01 03 Fax:+90 342 221 01 04
reproduced or disclosed to third parties.