CONTENTS
1.0. PURPOSE........................................................................................................
2.0. SCOPE.............................................................................................................
3.0. REFERENCES.................................................................................................
4.0. DEFINITION.....................................................................................................
5.0. PROCEDURE...................................................................................................
6.0. APPENDIX.....................................................................................................3
/conversion/tmp/scratch/438985158.doc
Procedure : IKL-HSE-0103
PT. ISTANA KARANG LAUT HSE MEETINGS Date : 01-June-02
HSE PROCEDURE Revision : 0
Page : 2 of 3
1.0 PURPOSE
The purpose of this procedure is to ensure that all IKL and it’s subcontractor
will have an efficient and effective meeting to comply with IKL requirements
2.0 SCOPE
The procedure applies to all areas of work under the direct or indirect control
of the Istana Karang Laut
3.0 REFERENCES
IKL OH&S Manual Section 4.4.3
1. DEFINITION
2. PROCEDURE
5.1. Toolbox Meetings
5.1.1 Toolbox meetings will be held weekly for all IKL employees
and all subcontractors. These meetings are intended to be
short informal meetings where health and safety can be
discussed. The meetings will be conducted by the relevant
supervisor or Subcontractor supervisor with their respective
employees. Toolbox meeting groups shall be contained to a
maximum of 30 employees per group.
/conversion/tmp/scratch/438985158.doc
Procedure : IKL-HSE-0103
PT. ISTANA KARANG LAUT HSE MEETINGS Date : 01-June-02
HSE PROCEDURE Revision : 0
Page : 3 of 3
5.1.2 The Project Manager shall ensure that brief details of these
meetings including the date, who attended and the issues
discussed are recorded (see appendix). Outstanding matters
shall be discussed between the foreman, site manager and
where required with the applicable sub contractor.
4.0 APPENDIX