Вы находитесь на странице: 1из 4

CHETAN ANAND SAHU

Mobile: 91-9777443104
E-Mail: chetananand.entc@gmail.com

JOB OBJECTIVE

Aiming for Projects & maintenance level assignments in Electrical & Automation with a leading
organisation in Steel & Cement industry. Preferably hot rolling Mill & Automation Projects.

PROFILE SUMMARY

 B.E. (Electronics & Telecommunication Engineering) professional with an experience of 10


years in Electrical Automation Projects & Maintenance, execution of 1.4 MTPA Bar Mill
Projects, working as shift-in-charge Bar Mill Electrical & Automation. SCADA & Substation
Automation Project, Operation & Maintenance of 400/220/33 kV Substation.

 Currently associated with Jindal Steel & Power Ltd. as Deputy Manager (Electrical &
Automation)

 Working with Siemens S7-400,300 PLC, Ladder Logic & WinCC (SCADA) for maintenance
of 1.4 MTPA Bar mill.

 Modification in programme & logics as per process requirement.

 Adding new tags & HMI development in WinCC as per process requirement.

 Working with Siemens S120 Drives (Mill Stands), Schneider Drives in overhead EOT cranes.

 Analysis of cobble in IBA (pda) for smooth operation of mill, suggesting operations to change
plant parameters as per requirement, analysis of process through iba during any sequence
break or equipment mal operation.

 Electrical ,Automation & maintenance of automatic Bar tying machine ( Strapping machine )

 Signal exchange between CPUs using dp-dp coupler.

 IO testing & troubleshooting, Fixing Tracking instruments like Proximity Sensors, HMDs,
Loop Scanners, Photocells and Pyrometers, working with encoders.
 Basic level skill in troubleshooting Ethernet & OFC Network of PLCs & HMIs.

 Maintenance of motors from 2.2 Kw to 132 KW Mill Motors.

 Co-ordinating with Electrical Contractor for Installation of Control & Power Junction Boxes
as per drawing, termination of Control & Power cables as per termination schedule.

 Adept at handling Erection and maintenance activities of HT, LT Switchgear,


PCC.MLDB.PDB, DG Sets.

 Proficiency in identifying & troubleshooting electrical & Automation problem.

 Preparation of SOPs of Electrical system, Preparation & regular updating of All Electrical
equipments checklist to monitor system health. Maintaining record of daily, quarterly &
annual maintenance of equipments, Why Why Analysis,5S,Safety & work permit, following
proper procedure for safety during Electrical shutdown.

 Troubleshooting Electrical Faults & Handling Breakdown to restore system on minimal


possible time to reduce downtime.

 Procurement of Electrical spares, store & spare management to avoid any unwanted crisis due
to Electrical items.

 Statutory compliance of existing and new system, modification in installation as


recommended by statutory authority.

 Gathered working knowledge of MICOM BCU, RTU, PASIC SCE, PASIC CMT, SMT,
MICOM S1Studio, SATEC meters, Optical Fibre communication.

 Compliance of EnMS, CAPA, OHSAS,TPM, ISO requirements.RCA, Y-Y Analysis of


equipment failure.

 Well Aware with Contactor & Relay logic.

ORGANISATIONAL EXPERIENCE

Since July’09: Jindal Steel & Power Ltd., Angul, Odisha

Growth Path:
July’09-2009 Graduate Engineering Trainee
2009-2011 Junior Managers
Since 2011 Assistant Manager (Electrical & Instrumentation) - 400/220/33kV Sub-station
Project
- A part of 20 MTPA, integrated Steel Plant and 1000 MW Power Plant of a Green
Field Project
June 2015 Bar Mill Electrical & Automation

BAR MILL (1.4 MTPA) Project Execution:

 Part of Erection, Commissioning & Testing team of HT & LT Switchboards (33 KV & 415 V),
Testing of LT motors of Roller Tables.
 Erection of RIO Panels, Stabilisation of PROFIBUS network between RIOs and PLC.
 Electrical & Automation of HSD, Cooling-bed, Cold cut, Bundle farming & storage areas.
 Electrical & Automation of Filtration plant ( S7-300 PLC, Ladder Logic )
 Electrical & Automation of Automatic Bar tying machine ( S7-300 PLC, Ladder Logic ).
 Finalization & Modification of cable rout & erection of Cables Trays as per site requirement.
 Co-ordinating with electrical contractor to achieve daily target of Control Power cable laying
& terminations at mill.

BAR MILL Maintenance:

 Handling Bar Mill Electrical shift activities as Shift-In-Charge & Supporting operations Team
for hassle free operation of the Mill.
 Analysis of cobble using IBA Analyzer (PDA software).
 Working with Siemens S7-400 PLC & WinCC for maintenance of bar mill.
 Maintenance of Utility area & Filtration plant.
 Creating SOPs, Planning and implementing proactive / preventive / shut down maintenance
schedules for machinery so as to increase machine up-time / equipment reliability.

Substation Automation:

 Working with RTUs (Remote Terminal Units) for integration of Substation signals in SCADA.
 Executing IO validation & troubleshooting from field to SCADA using protection & Scheme
Drawings.
 Preparing Control Cable schedule, input output list preparation & estimation of DI/AI/DO
modules for substation, configuring and testing substation specific interlocks.

Erection & Commissioning

 Erection of 33Kv Switchboards ( SIEMENS,ABB,ALSTOM) for plant power Distribution &


part of its Scheme testing & commissioning team.
 Basic working knowledge of MICOM S1 STUDIO, PCM 600 for configuration of MICOM &
ABB relays, extracting & uploading relay setting, DR extraction.
 Worked with protection & scheme drawings of Substation.
 Installation of Power Line Carrier Communication System for protection, data and voice
communication with Sub-SLDC (remote substation).
 Testing of Current Transformer, Potential Transformer, and Circuit Breakers.

Substation Operations & Maintenance:

Functioning as a part of the Electrical Power Distribution & Fault Troubleshooting Team of
central E&I; monitoring power distribution with SCADA system.

 Identifying areas of obstruction / breakdown for taking steps to restore power.


 Handling substation shift activities as Shift-In-Charge.
 Stabilization of emergency power system, Operation & Maintenance of 2 X 500 KVA DG sets
for emergency power distribution.
 Erection, Testing and maintenance of HV, LV transformers, BDV & DGA Analysis of
Transformer Oil.

EDUCATION

2009 B.E. (Electronics & Telecommunication Engineering)


Government Engineering College, Bilaspur, Chhattisgarh; scored SPI: 7.5

2004 H.S.C. (CGBSE) GHSS Kochwai, Chhattisgarh; scored 80.8% marks

2002 S.S.C. (CGBSE) GHSS Kochwai, Chhattisgarh; 84.8% marks

TRAININGS ATTENDED

 5 days training on configuring SCADA & Sub-station Automation System from AREVA T&D,
NOIDA in Dec’13
 5-days Training Program for Maintenance Management from Centre for Research and
Industrial Staff Performance in 2010
 5-day Training Program for Power Generation & Control from Technocrats Academy of
Automation & Control Technology in 2011
 6-weeks Industrial Training in Bhilai Steel Plant (SAIL) covering various areas of an
Integrated Steel Plant in 2007
 1-month Training in Embedded System & Micro-controllers from Vector Institute, Hyderabad
in 2008

PERSONAL DETAILS

Date of Birth : 7th August, 1987


Languages Known : Hindi, English
Address : Q. No. - SF3/2 Jindal Nagar, Sh-63, Chhendipada Road, Nisha,
Angul-759111
Preferred Location : Noida, Mumbai, Kolkata, Hyderabad

Вам также может понравиться