Вы находитесь на странице: 1из 34

Name of C/O Academic Complex& Canteen Building for IIT Madras at Chennai.

Sub Head I
work C/O U.G. Sump for rain water harvesting / treated water, development work such as
storm water drains, bituminous roads, interlocking paver blocks, Cement Concrete
pavements , RCC culverts, footpath etc. Sub Head II: Providing street
lighting and water supply/ drainage pump sets (AROUND ACADEMIC
COMPLEX)

Sl. No Description Qty Unit Rate


1 EARTH WO R K
1.1 Earth work in surface excavation not exceeding
30 cm in depth but exceeding 1.5 m in
width as well as 10 sqm on plan including
disposal of excavated earth upto 50 m and lift
upto 1.5 m, disposed soil to be levelled and
neatly dressed :

1.1.1 All kinds of soil 7500 sqm 53.00


1.2 Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means over areas (exceeding 30cm in depth. 1.5
m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead upto
50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.

1.2.1 All kinds of soil 750 cum 125.95


1.3 Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means over areas (exceeding 30 cm in depth,
1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead upto
50 m and lift upto 1.5 m, disposed earth to
be levelled and neatly dressed.

1.3.1 Ordinary rock 110 cum 221.05


1.4 Earth work in excavation by mechanical
means (Hydraulic excavator) /
manual means in foundation trenches or
drains (not exceeding 1.5 m in width or 10
sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal
of surplus excavated soil as directed, within a
lead of 50 m.

1.4.1 All kinds of soil. 600 cum 166.40


1.5 Excavating trenches of required width for
pipes, cables, etc including excavation for
sockets, and dressing of sides, ramming of
bottoms, depth upto 1.5 m, including getting out
the excavated soil, and then returning the soil as
required, in layers not exceeding 20 cm in
depth, including consolidating each deposited
layer by ramming, watering, etc. and
disposing of surplus excavated soil as directed,
within a lead of 50 m :

1.5.1 All kinds of soil


1.5.1.1 Pipes, cables etc. exceeding 80 mm dia. but not
exceeding 300 mm dia 100 metre 225.45

1.5.1.2 Pipes, cables etc. exceeding 300 mm dia but


not exceeding 600 mm 160 metre 352.00

1.6 Filling available excavated earth (excluding


rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by
ramming and watering, lead up to 50 m and lift 238 cum 125.75
upto 1.5 m.
1.7 Supplying and filling in plinth with stone dust
under floors, sub base course and like
places including rolling with power roller of
minimum 8 tonnes capacity and dressing up etc.
complete for all lead and lift upto 1.5m
including watering, ramming, consolidating and cu
dressing complete etc as per direction of 500 1200.00
m
Engineer-in- charge.

1.8 Extra for upto 1 KM lead beyond the initial lead of


50 mtrs included in the earth work items within
the IITM Campus for disposing the surplus
excavated earth as directed by the Engineer-in-
500 Cum 111.50
charge.

2 CONCRETE WORK
2.1 Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering - All work up to
plinth level and encashing RCC hume pipe of
450 mm and 600 mm

2.1.1 1:2:4 (1 Cement: 2 coarse sand: 4


graded stone aggregate 20 mm nominal cu
30 5481.95
size) m

2.1.2 1:5:10 (1 cement : 5 coarse sand : 10 graded


stone aggregate 40 mm cu
500 4209.05
nominal size) m
2.2 Providing and laying cement concrete in retaining
walls, return walls, walls (any thickness)
including attached pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string
or lacing courses, parapets, coping, bed
blocks, anchor blocks, plain window sills,
fillets, sunken floor,etc., up to floor five level,
excluding the cost of centering, shuttering
and finishing :

2.2.1 1:1½:3 (1 cement:1½ coarse sand:3 graded


stone aggregate 20 mm 35 cum 6990.40
nominal size)
2.3 Extra for providing and mixing water proofing per 50
material in cement concrete work in doses by kg
weight of cement as per manufacturer's 1888 cement 47.95
specification.

3 REINFORCED CEMENT CONCRETE


3.1 Providing and laying in position ready mixed
concrete manufactured in fully automatic
batching plant and transported to site of work
in transit mixer for all leads, having continuous
agitated mixer, manufactured as per mix
design of specified grade for reinforced
cement concrete work, including pumping of
R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering,
finishing and reinforcement,
including cost of admixtures in
recommended proportions as per IS : 9103
to accelerate / retard setting of concrete, improve
workability without impairing strength
and durability as per direction of the Engineer
- in -
charge.

M-40 grade Reinforced cement concrete


by using not less than360 kg of cement per cum of
concrete. NOTE
(1) Cement content considered in this item is @
360 kg/cum. Excess/ less cement used as per
design mix is payable/ recoverable separately.
(2) Fly ash conforming to grade I of IS 3812
(Part-1) only be used as part replacement of
OPC as per IS : 456.

Uniform blending with cement to be ensured


in accordance with clauses 5.2 and 5.2.1 of
IS:456 -2000 in the items of BMC and
RMC.3.)The above item shall be used
judiciously where specified quality of flyash is
available for mixing in concrete .Also,the
guidelines issued by CDO , CPWD

3.1.1 All RCC works upto plinth level 125 cum 6900.30
3.2 Centering and shuttering including strutting,
propping etc. and removal
of form for :
3.2.1 Foundations, footings, bases for 315 sqm 193.95
columns
3.2.2 Wall (any thickness) including attached
pilasters, butteresses, plinth 635 sqm 378.60
and string courses etc.
3.2.3 Suspended floors, roofs, landings, balconies
and access platform 140 sqm 422.30

3.3 Steel reinforcement for R.C.C. work including


straightening, cutting, bending, placing in
position and binding all complete upto
plinth
level.

3.3.1 Thermo-Mechanically Treated bars( Fe 500 D ) kilogra


from primary producers 16000 m 56.60

3.4 Add for plaster drip course/ groove in


plastered surface or moulding to 400 metre 34.15
R.C.C. projections.
3.5 Extra for using extra cement than the quantity
specified in the item of batch mix concrete
/RMCas arrived as per design mix. 120 qtl. 672.75

4 BRICK WORK
4.1 Masonry work with flyash cement concrete
bricks of class designation 100 ( crushing
strength not less than 100kh/sqm)in foundation
& plinth in all shapes & sizes in cement mortar
specified . ( The flyash cement concrete
brick shall have nearly 25% 6mm nominal size
coarse aggregate by volume & the water
absorption shall not exceed 10% by weight of
flyash cement concrete brick)

4.1.1 FPS bricks in cement mortar 1:6(1 750 cum 4751.65


cement : Coarse Sand)
5 STONE WORK
5.1 Random rubble masonry with hard stone in
foundation and plinth including levelling up
with cement concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone aggregate 20
mm nominal size) upto plinth level with :

5.1.1 Cement mortar 1:6 (1 cement : 6 219 cum 3965.85


coarse sand)
5.2 Coursed rubble masonry (second
sort) with hard stone in foundation and plinth
with
5.2.1 Cement mortar 1:6 (1 cement : 6 38 Cum 4326.45
coarse sand)
6 STEEL WORK
6.1 Steel work welded in built up sections/
framed work, including cutting, hoisting,
fixing in position and applying a priming
coat of approved steel primer using
structural steel etc. as required.

6.1.1 In gratings, frames, guard bar, ladder,


railings, brackets, gates and similar works 1200 kg 85.95

7 FLO O R I N G
7.1 Providing and fixing Ist quality ceramic
glazed wall tiles conforming to IS: 15622
(thickness to be not less than 6mm), of approved
make, in all colours, shades except
burgundy, bottle green, black of any size as
approved by Engineer-in-Charge, in skirting,
risers of steps and dados, over 12 mm thick
bed of cement mortar 1:3 (1 cement : 3 coarse
sand) and jointing with grey cement slurry @
3.3kg per sqm, including pointing in white
cement mixed with pigment of
200 sqm 744.80
matching shade complete.(U.G.sump
wall lining)

7.2 Providing and laying Ceramic glazed floor tiles of


size 300x300x7mm of 1st quality conforming to
IS : 15622 of approved make in colours such
as White, Ivory, Grey, Fume Red Brown, laid on
20 mm thick cement mortar 1:4 (1 Cement :
4 Coarse sand), including pointing the
joints with white cement and matching
pigment etc., complete.( For U.G.sump bottom 80 sqm 688.35
lining)

8 FINISHING
8.1 15 mm cement plaster 1:3 (1 cement: 3 coarse
sand) finished with a floating coat of neat
cement on the rough side of single or half brick 1125 sqm 256.55
wall.

8.2 6 mm cement plaster of mix :


8.2.1 1:3 (1 cement : 3 fine sand) 96 sqm 143.80
8.3 Finishing walls with Acrylic Smooth exterior
paint of required shade :

8.3.1 New work (Two or more coat applied @ 1.67


ltr/10 sqm over and including priming coat of
exterior primer applied @ 2.20 kg/ 10 sqm) 400 sqm 96.05

8.4 Painting with synthetic enamel paint of


approved brand and manufacture to give an even
shade :

8.4.1 Two or more coats on new work 50 sqm 78.40


9 DISMANTLING & DEMOLISHING
9.1 Disposal of building rubbish / malba
/ similar unserviceable, dismantled or waste
materials by mechanical means,
including loading, transporting, unloading
to approved municipal dumping ground outside
the IITM campus or as approved by Engineer-
in-charge, beyond 50 m initial lead, for all 500 cum 120.55
leads including all lifts involved.

10 R OAD WO R K
10.1 Preparation and consolidation of sub grade with
power road roller of 8 to
12 tonne capacity after excavating earth to an
average of 22.5 cm depth, dressing to camber and
consolidating with road roller including
making good the undulations etc. and re-
rolling the sub grade and disposal of surplus 9000 sqm 90.10
earth with lead upto 50 metres.
10.2 Providing and laying Dense Graded
Bituminous Macadam using crushed stone
aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot
mix to work site by tippers, laying with
paver finisher equiped with electronic
sensor to the required grade, level and
alignment and rolling with smooth
wheeled, vibratory and tandem rollers as per
specifications to achieve the desired compaction
and density, complete as per specificatons and
directions of Engineer-in-Charge.

10.2.1 50 to 100 mm average compacted thickness


with bitumen of grade VG- 30 @5% (percentage
by weight of total mix) and lime filler @ 2%
(percentage by weight of Aggregate) prepared
in Batch Type Hot Mix Plant of 100-120 TPH 555 cum 7247.70
capacity.

10.3 Providing and laying Bituminous concrete


using crushed stone aggregates of
specified grading, premixed with bituminous
binder and filler, transporting the hot mix to work
site by tippers, laying with paver finisher
equiped with electronic sensor to the
required grade, level and alignment and
rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired
compaction and density as per specification,
complete and as per directions of Engineer-in-
Charge.
10.3.1 40/50 mm compacted thickness with bitumen of
grade VG-30 @5.5% (percentage by weight
of total mix) and lime filler @ 3%
(percentage by weight of Aggregate) and
waste plastic additive @8% (percentage by
weight of bitumen) prepared in Batch Type Hot 260 cum 8345.45
Mix Plant of 100- 120 TPH capacity.

10.4 Providing and applying tack coat using


bitumen emulsion conforming to IS: 8887,
usng emulsion presure distributer including
preparing the suface ad cleanng with
mechanical broom with medium setting bitumen
emulsion

10.4.1 On W.M.M. @ 0.4 Kg / sqm 7500 Sqm 69.88


10.4.2 On bituminous surface @ 0.25 Kg / 1000 Sqm 52.29
sqm
10.5 Providing and applying 2.5 mm thick road
marking strips (retro- reflective) of
specified shade/ colour using hot thermoplastic
material by fully/ semi automatic thermoplastic
paint applicator machine fitted with profile
shoe, glass beads dispenser, propane tank heater
and profile shoe heater, driven by
experienced operator on road surface including
cost of material, labour ,T&P, cleaning
the road surface of all dirt, seals, oil, grease and
foreign material etc. complete as per 150 sqm 391.25
direction of Engineer-in-charge and
accordance with applicable specifications.
10.6 Providing and laying at or near ground
level factory made kerb stone of M-25
grade cement concrete in position to the required
line, level and curvature, jointed with cement
mortar 1:3 (1 cement: 3 coarse sand),
including making joints with or without
grooves (thickness of joints except at sharp
curve shall not to more than 5mm), including
making drainage opening wherever required
complete etc. as per direction of Engineer-
in-charge (length of finished kerb edging shall
be measured for payment). (Precast C.C. kerb 45 cum 5012.65
stone shall be approved by Engineer-in-
charge).

10.7 Providing and laying C.C. pavement of mix


M-25 with ready mixed concrete from
batching plant. The ready mixed concrete
shall be laid and finished with screed
board vibrator , vacuum dewatering
process and finally finished by floating,
brooming with wire brush etc. complete as
per specifications and directions of Engineer-in-
charge. (The panel shuttering work shall be
paid for separately). (Note:- Cement content
considered in this item is @ 330 kg/cum. 120 cum 6912.15
Excess/less cement used as per design mix
is payable/ recoverable separately).
10.8 Scarifying the existing bituminous road
surface to a depth of 50 mm and disposal of
scarified material within all lifts and lead
upto 1km (by mechanical means). 300 sqm 3.60

10.9 Construction of granular sub-base by providing


close graded Material conforming to
specifications, mixing in a mechanical mix
plant at OMC, carriage of mixed material by
tippers to work site, for all leads & lifts,
spreading in uniform layers of specified
thickness with motor grader on prepared surface
and compacting with vibratory power
roller to achieve the desired density, complete
as per specifications and directions of Engineer-in-
Charge.

10.9.1 With material conforming to Grade-I (size


range 75 mm to 0.075 mm) 750 cum 2089.70
having CBR Value-30
10.9.2 With material conforming to Grade-II (size range
53 mm to 0.075 mm ) having CBR Value-25 750 cum 2080.15

10.9.3 With material conforming to Grade- III (size 750 cum 1931.45
range 26.5 mm to 0.075 mm ) having CBR Value-
20
10.10 Providing, laying, spreading and compacting
graded stone aggregate (size range 53 mm to
0.075 mm ) to wet mix macadam
(WMM) specification including premixing the
material with water at OMC in
mechanical mix plant, carriage of mixed
material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver
finisher in sub- base / base course on well
prepared surface and compacting with
vibratory roller of 8 to 10 tonne capacity to
1640 cum. 2132.25
achieve the desired density, complete
as per specifications and directions of
Engineer-in-Charge.

10.11 Providing and laying factory made coloured


chamfered edge Cement Concrete paver
blocks of required strength, thickness &
size/shape, made by table vibratory method
using PU mould, laid in required colour &
pattern over 50mm thick compacted bed of
fine sand, compacting and
proper embedding/laying of inter locking
paver blocks into the sand bedding layer
through vibratory compaction by using plate
vibrator, filling the joints with river sand and
cutting of paver blocks as per required size and
pattern, finishing and sweeping extra sand in sq
2000 756.15
footpath, parks, lawns, drive ways or light m
traffic parking etc. complete as per
manufacturer's specifications & direction of
Engineer in-Charge. 60mm thick C.C. paver
block of M-35 grade with approved

11 WATER SUPPLY
11.1 Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply including
all CPVC plain & brass threaded fittings This
includes jointing of pipes & fittings with one
step CPVC solvent cement
,trenching ,refilling & testing of joints complete as
per direction of Engineer in Charge.

11.1.1 75 mm nominal inner dia Pipes 780 metre 1201.05


11.1.2 100 mm nominal inner dia Pipes 24 metre 1618.10
11.2 Providing and fixing gun metal gate
valve with C.I. wheel of approved quality
(screwed end) :
11.2.1 80 mm nominal bore 10 each 1919.50
12 DRAINAGE
12.1 Providing and laying cement concrete 1:5:10 (1
cement : 5 coarse sand : 10 graded stone
aggregate 40 mm nominal size) all-round
NP-2 pipes including bed concrete as
per standard design :

12.1.1 150 mm diameter NP-2 pipe 10 metre 40.15


12.1.2 300 mm diameterNP-2 pipe 90 metre 47.85
12.2 Providing and laying non-pressure NP2 class
(light duty) R.C.C. pipes with collars jointed
with stiff mixture of cement mortar in the
proportion of 1:2 (1 cement : 2 fine sand)
including testing of joints etc. complete :

12.2.1 150 mm dia. R.C.C. pipe 10 metre 356.70


12.2.2 300 mm dia. R.C.C. pipe 90 metre 518.55
12.2.3 450 mm dia. R.C.C. pipe 60 metre 720.95
12.2.4 600 mm dia. R.C.C. pipe 100 metre 1397.10
12.3 Providing orange colour safety foot rest of
minimum 6 mm thick plastic encapsulated as
per IS : 10910, on 12 mm dia steel bar
conforming to IS : 1786, having minimum
cross section as 23 mmx25 mm and over
all minimum length 263 mm and width as 165
mm with minimum 112 mm space between
protruded legs having 2 mm tread on top surface
by ribbing or chequering besides necessary and
adequate anchoring projections on tail length
on 138 mm as per standard drawing and suitable 16 each 327.90
to with stand the bend test and

chemical resistance test as per


specifications and having
manufacture's permanent
identification mark to be visible even after
fixing, including fixing in manholes with
30x20x15 cm cement concrete block 1:3:6 (1
cement : 3 coarse sand : 6 graded
stone aggregate 20 mm nominal size)
complete as per design.

13 WATER PROOFING TREATMENT


13.1 Providing and Placing in position suitable
PVC water stops conforming to IS:12200
for construction/ expansion joints between
two RCC members and fixed to
the reinforcement with binding wire before
pouring concrete etc. complete
:

13.1.1 Serrated with central bulb ( 225mm wide, 8-


11mm thick). 132 metre 254.15

14 MISCELLANOUS WORKS
14.1 Providing & laying 80mm thickness heavy
duty SFRC factory made perforated
precast concrete drain cover of M/s K.K.
Precast make or equivalent as per approved
size & shade i/c transportation etc. complete as 464 sqm 2000.00
directed by the Engineer-in-charge

14.2 Providing and fixing factory made heavy


duty SFRC Cover 600x600x60 mm of M/s
K.K. Precast make or equalent for under
ground sump manhole all complete as per
direction of Engineer-in-charge. 4 each 2500.00

14.3 Providing & fixing of 80mm dia. Hot Dipped


galvanised Puddle Flanges as per IS:6392-1971
i/c cost of flanges, pipes, threading, nuts
& bolts, welding charges & making holes etc.
complete as per direction of Engineer- in-charge 4 each 3700.00

Total
Add 31.37% cost Index on DSR-2016
on Rs.26272086/-
Grand Total
Assistant Engineer, IIMPSD-I. Executive Engineer, IITMPD.
hennai. Sub Head I:
ment work such as
Cement Concrete
oviding street
ADEMIC

Amount

397500

94463

24316
99840

22545

56320

29929
600000

55750

164459

2104525
244664

90530
862538

61094

240411
59122

905600

13660

80730

3563738
868521

164405

103140
148960

55068

288619

13805
38420

3920

60275

810900
4022474
2169817

524100
52290

58688
225569

829458
1080

1567275

1560113

1448588
3496890

1512300
936819
38834

19195

402
4307

3567
46670
43257
139710
5246

33548
928000

10000

14800

3,20,20,764
82,41,553

4,02,62,317