test pressure that is higher than the minimum required in UG-99(b), is the
inspection described in UG-99(g) required to be at a pressure not less than
the actual test pressure divided by 1.3?
Reply: Yes.
Standard Designation: BPV Section VIII Div 1
Edition/Addenda: Latest (2013) Para./Fig./Table No: UG-45 vs UW-13(h) Subject Description: When can UW-13(h) over-ride UG-45 Date Issued: 01/12/2015 Record Number: 14-1797 Historical Interpretation numbers : Question(s) and Reply(ies): Question (1): With reference to Figure UW-13.4 is it permitted to have a nozzle neck thickness of t1 at any part of the nozzle neck that is away from the weld preparation for the attached piping [see U-1(e)(1)(a)]?
Reply (1): No.
Question (2): With reference to Figure UW-13.4 is it allowed to have trn at
any part of the neck beyond that defined by the tapered transitions shown in Fig. UW13.4?
Reply (2): No.
Standard Designation: BPV Section VIII Div 1
Edition/Addenda: 2013 edition Para./Fig./Table No: UG-34 and UG-44 Subject Description: Design Calculations for Blind Flanges Date Issued: 03/30/2015 Record Number: 14-1803 Historical Interpretation numbers : Question(s) and Reply(ies): Question (1). If a B16.5 or B16.47 blind flange is modified in a manner that is not covered by those standards, may pressure/temperature ratings of these standards be used in accordance with UG-44?
Reply (1). No.
Question (2). In the situation described in Question 1, would calculations
using the design provisions of UG-34 and UG-39 be required?