Estimated
NO. DESCRIPTION OF WORK BIDDER UNITS TOTAL COST
Direct Cost &
PFDA
Value Added
Tax & Mark-
ups
1 Earthworks
a. Ordinary Excavation 1,066.90 cu.m.
b. Backfilling and Compaction 973.49 cu.m.
2 Installation of Pipelines
2 " diameter HDPE Pipe ISO SERIES SDR 11 4,680.00 mts.
1/2 " diameter x 300 metersHDPE Pipe SDR 11(
160 psi ) ISO SERIES 30.00 roll
2 " dia. HDPE Pipe Straight coupling
78.00 pcs
2 " dia. Gate valve
6.00 pcs
2 " diameter HDPE male adapter Pipe SDR 9
12.00 pcs
2 x 2 x 2 " diameter HDPE TEE 2.00 pcs
2 " diameter HDPE end cap Pipe SDR 9 3.00 pcs
3 Installation of Stub-Outs 20.00 units
Cement 9.00 bags
Sand 1.00 cu.m.
Gravel 1.00 cu.m.
1 1/4" dia. G.I ball valve 20.00 pcs
2" dia. X 1 1/4" dia. Saddle clamp 20.00 pcs
1 1/4" dia. X 1000 mm G.I nipple sched. 40
both ends threaded 20.00 pcs
1/1/4" x 1 1/4 dia. G.I TEE 20.00 pcs
page 1/2
4 Construction of Chorinating Facility 1.00 lot
5 Hauling of Construction Materials 1.00 lot
In Words: __________________________________________________________________________________
Signature : ________________________________________
page 2/2