Вы находитесь на странице: 1из 26

DISEÑO DE ZAPATA AISLADA

1. METRADOS DE LA EDIFICACION INGRESAR DATOS


M= 1.645 m RESULTADOS
Area Tributaria
N= 2.9 m
Nro de pisos 4
Carga Muerta 800 kg/m2
Carga Viva 200 kg/m2
PD= 44.99 ton
PL= 18.46 ton Col=

2. DATOS S/C (kg/m2)= 200


PD= 12.06 ton
PV= 1.46 ton
Ơterre= 1.1 kg/cm2 0.15
fc= 210 kg/cm2
fy= 4200 kg/cm2
Df= 1.65 m
hf= 1.8 m
S/c= 200 kg/m2
ϒs= 1.8 ton/m3 d= 0.3
ϒc= 2.4 ton/m3
ϒm 2.1 ton/m3
COLUMNA 0.25 m
0.25 m

3. CALCULO DEL ESFUERZO NETO DEL SUELO


𝝈�=𝝈𝒕−𝜸𝒎∗𝒉𝒇−𝑺/𝑪𝒑𝒓𝒊𝒎𝒆𝒓𝒑𝒊𝒔�

Ơn= 7.02 ton/m2

4. AREA DE LA ZAPATA EN PLANTA 𝑨�=𝑷𝒔𝒆𝒓𝒗𝒊𝒄𝒊�/𝝈�


Pservicio= 13.52 ton
Az= 1.9259259259 m2 Requerida

Columna 0.25 0.25 m


Lv= 0.6 m
T= 1.45 m
S= 1.45 m
S Area Coloc= 2.1025 m2
Diferencia 0.17657407 >>0 CUMPLE…!!!
T
5. REACCION NETA ULTIMA DEL SUELO
𝑊𝑛�=𝑃�/𝐴𝑧𝑐𝑜𝑙𝑜𝑐𝑎�

Pu Pu= 19.366 ton/m2


Wnu= 9.2109393579 ton/m2

6.DIMENSIONAMIENTO EN ALTURA h
Wnu
h= 0.4 m
d= 0.3 m

7. VERIFICACION POR CORTANTE


ф= 0.85
фVc= 28.3983887251 ton 𝑉�≤𝜑∗𝑉𝑐
Vu= 4.0067586207 ton 𝑉𝑐=∅∗0.53∗√𝑓𝑐∗𝑏∗� , 𝑏=�

𝑉�=𝑊𝑛�∗�∗(𝐿𝑣−�)
3.4057448276 28.3983887251
CUMPLE!!!
𝑽𝒖≤𝝋∗𝑽𝒄
d d
S

8. VERIFICACION POR PUNZONAMIENTO

𝑉�≤𝜑∗𝑉𝑐 m

𝑉�=𝑃�−𝑊𝑛�∗𝑚∗𝑛 d/2

n
𝑉𝑐1=0.27∗(2+4/𝐵𝑐)√𝑓𝑐∗𝑏𝑜∗�)
d/2

ELEGIR
ф= 𝑉𝑐2=1.06∗√𝑓𝑐∗𝑏𝑜∗� 0.85 EL
m= 0.55 m MENOR 𝑏𝑜=𝑃𝑒𝑟𝑖𝑚𝑒𝑡𝑟𝑜 �𝑒 𝑙𝑎 𝑠𝑒𝑐𝑐 𝑐𝑟𝑖𝑡𝑖𝑐𝑎 2𝑚+2𝑛
𝑉𝑐3=0.27∗(2+(∝𝑜∗�)/𝑏𝑜)∗√𝑓𝑐∗𝑏𝑜∗�
n= 0.55 m
bo= 2.2 m
Bc= 1 1
фVc1= 131.700530145 ton
фVc2= 86.1744209589 ton
фVc3= 163.627931392 ton
Vu= 16.5796908442 ton

14.0927372176 86.1744209589
CUMPLE…!!!

9. DISEÑO POR FLEXION


Wnu= 𝑽𝒖≤𝝋∗𝑽𝒄 9.2109393579 ton/m2
Lv= 0.6 m
S= 1.45 m
Mu= 2.4040551724 ton*m
fc= 210 kg/cm2
fy= 4200 kg/cm2
phi= 0.9
b= 1.45 m
d= 0.3 m
𝑀𝑚𝑎�=𝑊𝑛�∗�∗ 〖𝐿𝑣〗 ^2/2
w= 0.0098373046
cuantia 0.0004918652 As requerido 2.1396137446 cm2
Cuantia minima 0.0018 As minimo 7.83 cm2
USAR= 7.83 cm2

ACERO EN LA DIRECCION LONGITUDNAL


Rec 7.5 cm
S= 1.45 m
T= 1.45 m

*Supongamos Acero 5/8"


Diam 1.59 cm
Ab= 2 cm2
Nro Varillas= 3.915
5
S
ESP= 32.1025
35 COLOCAR 5 ф

T
ACERO EN LA DIRECCION TRANSVERSAL 𝐸�𝑃=(�−2∗𝑟−𝜑𝑏)/(𝑛−1)
r= 7.5 cm
Ast= 7.83 cm2
S= 1.45
T= 1.45
*Supongamos Acero 5/8"
Diam 1.6 cm
𝐴𝑠𝑡=𝑇/�∗𝐴𝑠�𝑠𝑎𝑟
Ab= 2 cm2
Nro Varillas= 3.915
5
S S= 32.1
35 COLOCAR 5 ф
INGRESAR DATOS
RESULTADOS

0.25 x 0.25

Df= 1.65 hf= 1.8

h= 0.4

𝒓𝒑𝒊𝒔�

CUMPLE…!!!
40 30 20

𝑒𝑐𝑐 𝑐𝑟𝑖𝑡𝑖𝑐𝑎 2𝑚+2𝑛 𝜶�=


𝑩𝒄=𝒕𝟏/𝒕𝟐≤𝟐
BARRA db(cm) Ab(cm2)
8 mm 0.8 0.5
3/8" 0.95 0.71
1/2" 1.27 1.29
5/8" 1.59 2
3/4" 1.91 2.84
7/8" 2.22 3.87
1" 2.54 5.1
1 3/8" 3.58 10.06

5/8" @ 35
5/8" @ 35
DISEÑO DE ZAPATA EXCENTRICA
DATOS
PD= 10.03 ton AREA TRIBUTARIA COLUMNA EXCENTRICA
PV= 1.55 ton M= 1.645 m
Ơterre= 1.1 kg/cm2 N= 2.9
fc= 210 kg/cm2 Area= 4.7705
fy= 4200 kg/cm2 Pisos= 4
Df= 1.65 m Carga Muerta 800 kg/m2
hf= 1.8 m Carga Viva 200 kg/m3
S/c= 200 kg/m2
ϒs= 1.8 PD= 15.2656 ton
ϒc= 2.4 PL= 3.8164 ton
ϒm 2.1 ton/m3

1. ESFUERZO NETO DE DISEÑO Ơn


Ơn= 7.02 ton/m

2. AREA DE LA ZAPATA EN PLANTA


Az= 1.6495726496 m2

Columna= 0.25 0.25


c= 0.75
L Area= 1.75 m2
Dif= -0.10042735
B= 1
B L= 1.75
3. VERIFICACION DEL SUELO
M= 3.76125 ton*m
P= 11.58 ton
Ơen la zap con M 19.512857143 ton/m <<<Ơterren= 11 ton/m2 NOCUMPLE
13.986122449
Ơen la zap sinM 6.6171428571 ton/m <<<Ơterren= 11 ton/m2 CUMPLE

4. REACCION NETA DEL SUELO Wu


Pu= 16.677 ton
Wu= 9.5297142857 ton/m2

5. DIMENSAMIENTO DE ALTURA h=
h= 0.1 m
d= 0.1 m

6. VERIFICACION POR CORTANTE d= 0.1


𝑽𝒖<∅𝑽𝒄
CORANTE RESISTENTE
ф 0.85
L= 1.75 L= 1.75
Vc= 13.440751932 ton B= 1
фVc= 11.424639142 C= 0.75

CORTANTE ACTUANTE
VU= a d de la cara
VU= 10.84005 ton <<фVc= CUMPLE ton/m2

7. VERIFICACIO POR PUNZONAMIENTO


CORANTE RESISTENTE
ф 0.85
bo= 0.95 d/2= 0.05
Vc= 15.1434887 bo= 0.95
фVc= 12.871965395
CORTANTE ACTUANTE
Pu= 16.677
Ao= 0.105
Vu= 15.67638 <<фVc= NO CUMPLE ton/m2

8. DISEÑO POR FLEXION


wu= 9.5297142857 ton/m2
c= 0.75 m
L= 1.75 m
Mu= 4.69040625 ton*m
fc= 210
fy= 4200
phi= 0.9
b= 1.75
d= 0.1
w= 0.156247532
cuantia 0.0078123766 As reque 13.671659052 cm2
Cuantia minima 0.0018 As minim 3.15 cm2
USAR= 13.671659052 cm2
ACERO EN LA DIRECCION LONGITUDNAL
Rec 7.5 cm
L= 1.75 m
B= 1m

*Supongamos Acero 5/8"


Diam 1.6 cm
Ab= 2 cm2
Nro Varillas= 6.8358295258 �=(𝐿−2∗𝑟−𝜑𝑏)/(𝑛−1)
5
S= 39.6
35 COLOCAR 8 ф5/8"@25

ACERO EN LA DIRECCION TRANSVERSAL


𝐴𝑠𝑡=𝐵/𝐿∗𝐴𝑠�𝑠𝑎𝑟
r= 7.5 cm
Ast= 7.812376601 cm2
L= 1.75
B= 1
*Supongamos Acero 5/8"
Diam 1.6 cm
Ab= 2 cm2 �=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)
Nro Varillas= 3.9061883005
3
S= 41.7
35 COLOCAR 5 ф5/8"@20
A EXCENTRICA
DISEÑO DE ZAPATA DOBLE EXCENTRICA
DATOS
PD= 4.94 ton AREA TRIBUTARIA COLUMNA EXCENTRICA
PV= 0.27 ton M= 1.645 m
Ơterre= 1.1 kg/cm2 N= 2.9 m
fc= 210 kg/cm2 Area= 4.7705 m2
fy= 4200 kg/cm2 Pisos= 4
Df= 1.65 m Carga Muerta 800 kg/m2
hf= 1.8 m Carga Viva 200 kg/m3
S/c= 200 kg/m2
ϒs= 1.8 PD= 15.2656 ton
ϒc= 2.4 PL= 3.8164 ton
ϒm 2.1 ton/m3

1. ESFUERZO NETO DE DISEÑO Ơn


Ơn= 7.02 ton/m

2. AREA DE LA ZAPATA EN PLANTA


Az= 0.7421652422 m2

Columna= 0.25 0.25


c= 0.65
L Area= 0.81 m2
Dif= -0.067834758
B= 0.9
B L= 0.9
3. VERIFICACION DEL SUELO
ex= 0.325 m
MY= 1.69325 ton*m
ey= 0.325 m
MX= 1.69325 ton*m
P= 5.21 ton
Ơen la zap con M Y 20.368312757 ton*m <<<Ơterren= 11 ton/m2 no cumple
Ơen la zap con M X 20.368312757 ton*m
Ơen la zap sinM 6.4320987654 ton/m <<<Ơterren= 11 ton/m2 CUMPLE

4. REACCION NETA DEL SUELO Wu


Pu= 7.375 ton
Wu= 9.1049382716 ton/m2
5. DIMENSAMIENTO DE ALTURA h=
h= 0.4 m
d= 0.3 m

6. VERIFICACION POR CORTANTE d= 0.3


𝑽𝒖<∅𝑽𝒄
CORANTE RESISTENTE
ф 0.85
L= 0.9 L= 0.9
Vc= 20.737160124 ton B= 0.9
фVc= 17.626586105 C= 0.65

CORTANTE ACTUANTE
VU= a d de la cara
VU= 2.8680555556 ton <<фVc= CUMPLE ton/m2
2.8680555556 ton
7. VERIFICACIO POR PUNZONAMIENTO
CORANTE RESISTENTE
ф 0.85
bo= 0.8 d/2= 0.15
Vc= 38.25723461 bo= 0.8
фVc= 32.518649418
CORTANTE ACTUANTE
Pu= 7.375
Ao= 0.16
Vu= 5.9182098765 <<фVc= CUMPLE ton/m2

8. DISEÑO POR FLEXION


wu= 9.1049382716 ton/m2
c= 0.65 m
L= 0.9 m
Mu= 1.7310763889 ton*m
fc= 210
fy= 4200
phi= 0.9
b= 0.9
d= 0.3
w= 0.0114176695
cuantia 0.0005708835 As reque 1.5413853852 cm2
Cuantia minima 0.0018 As minim 4.86 cm2
USAR= 4.86 cm2

ACERO EN LA DIRECCION LONGITUDNAL


Rec 7.5 cm
L= 0.9 m
B= 0.9 m

*Supongamos Acero 5/8"


Diam 1.6 cm
Ab= 2 cm2
Nro Varillas= 2.43 �=(𝐿−2∗𝑟−𝜑𝑏)/(𝑛−1)
3
S= 36.7
30 COLOCAR 3 ф5/8"@

ACERO EN LA DIRECCION TRANSVERSAL


𝐴𝑠𝑡=𝐵/𝐿∗𝐴𝑠�𝑠𝑎𝑟
r= 7.5 cm
Ast= 4.86 cm2
L= 0.9
B= 0.9
*Supongamos Acero 5/8"
Diam 1.6 cm
Ab= 2 cm2 �=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)
Nro Varillas= 2.43
14
S= 5.6461538462
15 COLOCAR 14 ф5/8"@
XCENTRICA
0.3 m

15 m
DISEÑO DE ZAPATA CONECTADA
1. METRADOS DE LA EDIFICACION INGRESAR DATOS
M= 3.1 m RESULTADOS
Area Tributaria
N= 3.23 m
Nro de pisos 3
Carga Muerta 800 kg/m2 COLUMNA 1
Carga Viva 200 kg/m2 0.4 0.25
PD= 24.0312 ton PD1= 24.0312
PL= 6.0078 ton PV1= 6.0078

DATOS
L= 6.46
L1= 6.06 m
PD1= 24.0312 ton
PV1= 6.0078 ton
Hf
PD2= 24.0312 ton
PV2= 6.0078 ton
Ơterre= 1.5 kg/cm2
Df
fc= 210 kg/cm2
fy= 4200 kg/cm2
d1
Df= 1.5 m
hf= 1.6 m
S/c= 400 kg/m2
Y
ϒs= 1.8 ton/m3 0.4
ϒc= 2.4 ton/m3
ϒm 2.1 ton/m3 X
COLUMNA 1 COLUMNA 2
0.4 0.25 0.4 0.25 m
x y x y

1. PREDIMENSIONAMIENT DE LA VIGA DE CONEXXION


L1= 6.06 m
h 0.87 USAR h= 0.6 m ℎ=𝐿1/7 𝑏=𝑃1𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜/
b= 0.16 USAR b= 0.25 m (31∗𝐿1)

2. ESFUERZ NETO
𝜎𝑛=𝜎𝑡−𝛾𝑚∗ℎ𝑓−�/𝐶𝑝𝑟𝑖𝑚𝑒𝑟𝑝𝑖𝑠𝑜
Ơn= 11.24 ton/m2

3. DIMENSIONAMIENTO DE LA ZAPATA EXTERIOR


1.20*P1= 36.05 ton 𝐴𝑧=(1.2∗𝑃1𝑠𝑒𝑟𝑣)/
𝜎𝑛
Az= 3.21 m2 requerida
X Y
COLUMNA 1 0.4 0.25
Lv= 1.00 m
T T1= 2.30 m
S1= 1.40 m
Area Coloc= 3.22 m2
Diferencia 0.01 >>0 CUMPLE…!

S
3. DIMENCIONAMIENTO DEFINITVO DE LA ZAPATA EXTERIOR 2 P1=
VIGA CIMENTA 0.25 0.6 m
Wviga= 0.36 ton/m
Distancias
1= 6.46 P1= 30.039 ton
2= 0.2 P2= 30.039 ton
3= 5.56 RN1= 31.2018 ton
4= 0.5 RN2= 31.2018 ton
5= 0.2 Ơn= 11.24
6= 2.88
7= 0.7 𝐴𝑧=𝑅𝑁/𝜎𝑛
8= 0.35
9= 5.06 RN1

Az1= 2.78 Requerida Az2=


X Y
COLUMNA 1 0.4 0.25 COLUMNA 2
Lv= 0.930 m Lv=
T1= 2.11 m T2=
S1= 1.33 m S2=
Area Coloc= 2.81 m2 Area Coloc=
Diferencia 0.03 >>0 CUMPLE…! Diferencia

4. DISEÑO DE LA VIGA DE CIMENTACION


Pu 1.4*PD+1.7*PL
PU1= 43.85694
PU2= 43.85694
Wvigau= 0.504 ton/m
Rnu1= 45.48486 ton
Rnu2= 45.48486 ton

4. REACCION NETA DEL SUELO POR UNIDAD DE LONGITUD


S= 1.35
Wnu1= 33.692488889 ton/m 𝑊𝑛�=𝑅𝑛�/�
S= 1.35
Wnu2= 33.692488889 ton/m

5. CALCULO DEL MOMENTO MAXIMO (ANALISIS ESTRUCTURAL)

�=𝑃�1/(𝑤𝑛�−𝑤𝑣�)
a) Cuando V=0 ===> Mma
x= 1.3214503422
M Max= -20.20599619

M (tonm) 20.21 BARRA db(cm) Ab(cm2)


b (cm) 0.25 8 mm 0.8 0.5
d (cm) 0.51 3/8" 0.95 0.71
fc (kg/cm2) 210 1/2" 1.27 1.29
fy (kg/cm2) 4200 5/8" 1.59 2
w= 0.1846 3/4" 1.91 2.84
p= 0.0092 7/8" 2.22 3.87
As cm2 11.77 1" 2.54 5.1
p minima= 0.0033 1 3/8" 3.58 10.06
Asmin 4.2500
INGRESAR DATOS
RESULTADOS

COLUMNA 2
0.4 0.25
PD2= 24.0312
PV2= 6.0078
L1= 6.06

L= 6.46

VIGA DE CIMENTACION d1

m 0.4 m

=𝑃1𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜/ 𝑏≥ℎ/2
1∗𝐿1)

−�/𝐶𝑝𝑟𝑖𝑚𝑒𝑟𝑝𝑖𝑠𝑜
1.20*P1= 36.05 ton
Az= 3.21 m2 requerida

COLUMNA 2
Lv=
T T2=
S2=
Area Coloc=
CUMPLE…! Diferencia

1
S
3 4 5
P2=

VIGA DE CIMENTACION

7
8
9
RN1 RN2

2.78 Requerida
X Y
0.4 0.25
0.930 m
2.11 m
1.33 m
2.81 m2
0.03 >>0 CUMPLE…!
𝑀𝑚𝑎�=(𝑊𝑛�−𝑊𝑣�)∗�^2/2−𝑃�1∗(�−𝑋𝑐𝑜𝑙/2)

USAR:
0 1/2" 1.29
3 5/8" 2
3 3/4" 2.84
0 7/8" 3.87
0 1" 5.1
Area Colocada 14.52
As inferior= 3.92
123.39648641
𝐴𝑧=(1.2∗𝑃1𝑠𝑒𝑟𝑣)/
𝜎𝑛

X Y
0.4 0.25
1.00 m
2.30 m
1.40 m
3.22 m2
0.01 >>0 CUMPLE…!