Document OHS/P0
No. 1
4.3.1 Procedure for Identification of Rev No. 02
Hazards and Evaluation of Risks 20/06/1
Date
5
Page 1 of 4
PURPOSE:
To establish & maintain procedure for identification of hazards, the
assessment of risk and implementation of necessary control measures.
SCOPE: This document is valid for the scope mentioned in the Apex
manual.
DEFINITIONS:
Hazard: - Source, situation or act with a potential for harm in terms of
human injury or ill health or a combination of these.
Risk: - Combination of the likelihood of an occurrence of a hazardous event
or exposure(s) and the severity of injury or ill health that can be caused by
the event or exposure(s).
RESPONSIBILTY:
Dept. Heads / Construction Managers & MA
PROCEDURE:
Prepared by Approved by
1
Signature
Evaluation of risks
1. The core team members in consultation with respective Operations In
charge carry out the evaluation.
2. Prioritize identified hazards by using severity table no 1 & likelihood
table no 2.
3. Find Risk Rating by multiple of Severity and Likelihood.
4. Find the Severity and Likelihood after applying control measures and
find Residual Risk Rating.
5. Extreme risk level & High risk level as per Table no 3 will be focused
first to bring the risk
6. Extreme risks and High risks will be treated as unacceptable risks.
And this risks will be treated on priority and will be linked with
defined OCP.
7. Site specific HIRA will be prepared at site. Effectiveness HIRA will be
reviewed at HO quarterly.
8. Level by implementing controls like administrative control,
engineering control otherwise provide Personal Protective
2
equipment’s if other control is not possible or by extra precaution and
proper supervision in the area.
9. Implement controls to control or bring risk level up to acceptable level
like
a. Elimination;
b. Substitution;
c. Engineering controls;
d. Signage/warnings and/or administrative controls;
e. Personal protective equipment.
5. The concerned Construction Manager / Site engineer is responsible
for reviewing and updating HIRA as per the job requirement.
6. Risk analysis reviewed and updated annually or whenever there is any
change in any Process/ New Equipment installed and the same is
verified during MRM.
DOCUMENT GENERATED:
1. List of Processes Doc. No. OHS/D02
2. Identification of Hazards and Risk Assessment Doc. No. OHS/D03
3. List of Significant hazards Doc. No. OHS/D04
Table No 1
Severity
# OH & S
4 Major Fatal / Death
3 Serious Major bones broken, Loss of limb or several
people injured
2 Moderate Person injured, Non-reportable Less than 3 days
sick
1 Minor First Aid Treatment Circumstances
3
Table No 2
Likelihood
Table No - 03
1 2 3 4
PROBABILITY