Вы находитесь на странице: 1из 4

Pre Dock In Dock

Prioritas CPCP & SIP


- Serah terima
- Inventory
- Engine Perform
- Ext & Int Light
Check
ADD Pre Dock
Aircraft Removal Keel Beam
- Hyd & Fuel Leak Inspect cargo area, A/C Post Dock
Check - Backlash horstab Sanding Acces Panel HTC/TCI
inspect for limitation
lower lobe & area Painting
Landing Gear & camera - Engine Perform
- Record Decal Sanding Aircraft Routine, CPCP Aircraft Painting
TCI Component Req. remove AUX - WB-SC
Painting and SIP Acces
TANK - RTS
Panel
(RTN, SIP, CPCP & ADSB)

Flap AD/SB Servicing &


Removal OPC/FUC
Fitting MLG
Inspect flap area - Serv
(RTN, SIP, CPCP & ADSB) - FUC & OPC

Rectification
Phase
Job Card Progress

Deploy Task Card No Deffect Found – KODAL


KODAL Mekanik
- Lemari Kaca Put On Container Record Progress

Deffect Found –
Report to KODAL
Record MDR
(Materiel MDR)
– Create Job
Card MDR

Task Card MDR – IF OK – Put On KODAL


Mekanik
MDR Board (INSP) Container Record Progress
In Dock

Pre Dock
Removal
- Serah terima
Acces Panel Engine Routine Task
- Inventory Post Dock
- Prelim (OPC TC) Removal TCI Card
Routine, CPCP
and SIP Acces Inspect hanger Landing Gear & AD/SB - Inspect
- Engine Perform
Panel and mount bolt TCI Component - WB-SC
Fitting MLG - Serv
(RTN, SIP, CPCP & ADSB) - RTS
- FUC & OPC

Backlash Flap Keel Beam


Jackscrew Inspect cargo area,
Cabin
Removal Inspect
Backlash horstab lower lobe & area
Inspect flap area camera Inspect structure
inspect for (RTN, SIP, CPCP & ADSB)
limitation Req. remove AUX cabin area
TANK (RTN, SIP, CPCP & ADSB)
(RTN, SIP, CPCP & ADSB)

Rectification
Phase

Вам также может понравиться