SSR Competency Assurance

Guidance Booklet No.1


(Process and Requirements)

Revision 2
January 2018
HSEQ Department, TRANSCO

Disclaimer: This document is for general guidance and awareness purposes only and therefore should not be
considered as a replacement of the approved procedure HSE-HS-28 which is part of Transco IMS
COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

A - INTRODUCTION
This guidance booklet provides the process and requirements for becoming a Transco Competent Person
(CP) under Transco System Safety Rules (SSR) for working on or near Transco Network assets or an approved
HSE Officer on Transco Projects.
2nd Party Contractors: Contractors who work for Transco.
3rd Party Contractors: Contractors who work for other authorities but in the execution of their projects they
work on or near to Transco Network assets.

B - PROCESS FOR TRANSCO COMPETENT PERSON OR APPROVED HSE OFFICER

1) Requirements for 2nd Party Contractors (Competent Persons) – (For Contractors who work for Transco).

Documentation Requirements
 Curriculum Vitae of the nominated candidate.
 Specific Work Method Statement and Risk Assessment for the work to be undertaken near/on Transco
Network assets. Items to be covered in a Work method Statement are; Scope, Terminology, References,
Roles & Responsibilities, Emergency Procedures, Significant Risks & Control measures, Safe Method of
work, Resources and key interfaces.
 First Aid and Fire Fighting training Certificates.
 Supervision training Certificate

Qualification requirements for the nominated candidate(s)


 Relevant professional qualifications for the work (e.g. civil engineer for civil works)
 Relevant work experience (not less than three years as a job holder; please note this is not overall
experience and exclude any training periods) similar to what has been requested (e.g. substation work
would require substation experience). Experience must be current and within the last FIVE years.
 Basic HSE awareness of the work to be supervised, the associated hazards, control measures and
emergency procedures.
 First Aid and Fire Fighting training.
 Experience of Permit-To-Work system and Transco assets.
 Formal training in acquiring supervision skills.
 Safety Officers/HSE Engineers/All Managers will not be accepted for nomination as Competent Persons.
Project Engineers or individuals with roles similar to Project Engineers will be considered on a case by
case basis.

Key Competencies for Competent Persons


 Leadership.
 Planning, Organizing and Controlling.
 Oral communication skills in English. Must be able to demonstrate conducting a Toolbox Talk.
 Energy.

Please Note:
1) The role of a Competent Person on a Transco Project is a significant one. If any candidate is not confident
to fulfill the requirements of this role then he must refuse to accept this role.
2) Any Competent Person may be contacted on a random basis by Transco HSEQ department for an audit of
the safety documents that he has received and cleared.
3) If found in violation of Transco SSR either as an outcome of the safety document audit or observed on site
and reported by a Transco employee, competency of the CP will immediately be withdrawn.

2 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

2) Requirements for 2nd Party Contractors (HSE Officers) -(For Contractors who work for Transco, Subject to
Transco Project/Contract requirements)

Documentation Requirements
 HSE Officer Request letter from the company, as per the template given in Appendix-1. This must clearly
identify the project number and location.
 Curriculum Vitae of the nominated candidate.
 First Aid and Fire Fighting training Certificates.
 NEBOSH International/National General Certificate
 OSHAD Registration Card

Qualification requirements for the nominated candidate(s)


 Relevant professional qualifications for the work with strong knowledge of HSE tools and techniques.
 Relevant work experience (not less than three years) similar to the nature of the Project for which the
request has been made (e.g. OHL project would require experience of Projects where management of
similar risks is involved).
 NEBOSH International/National General Certificate
 Basic HSE awareness of the work to be supervised, the associated hazards, control measures and
emergency procedures.
 First Aid and Fire Fighting training.

Key Competencies Required for a HSE Officer


 Oral and written communication (English). Must be able to demonstrate conducting a safety briefing.
 Influencing and Proactive.
 Planning and Organizing.
 Problem solution.
 Strong personality.
 IT/PC literate.
 Energy.

Please Note:
It must be noted that the role of an approved HSE Officer on a Transco Project is a significant one. If any
candidate is not confident to fulfill the requirements of this role then he must refuse to accept this role.

3) Requirements for 3rd Party Contractors (Competent Persons) – (Contractors who work for other
authorities but in the execution of their projects they work on or near to Transco Network assets)

Documentation Requirements
 Competency requests should be submitted online through Transco e-Competency application on
Maximo (Section 6.4). However, upon specific instructions from Transco HSEQ, competency Request
letter from the company, as per the template given in Appendix-2 must be submitted along with the
required documentation
 Reply to the Notice of Intent (with drawing) issued by Transco (first issue and latest renewal) and/or DMA
E-NOC full report with Transco Information and Condition & Drawing.
 Curriculum Vitae of the nominated candidate.
 Specific Work Method Statement and Risk Assessment for the work to be undertaken near/on Transco
Network assets. Items to be covered in a Work method Statement are; Scope, Terminology, References,
Roles & Responsibilities, Emergency Procedures, Significant Risks & Control measures, Safe Method of
work, Resources and key interfaces.
 First Aid and Fire Fighting training Certificates.

3 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

Qualification requirements for the nominated candidate(s)


 Relevant professional qualifications for the work (e.g. a civil engineer for civil works)
 Relevant work experience (not less than five years as a job holder; please note this experience exclude
any training periods) similar to what has been requested (e.g. civil works would require civil experience).
Experience must be current and within the last FIVE years.
 Basic HSE awareness of the work to be supervised, the associated hazards, control measures and
emergency procedures.
 First Aid and Fire Fighting training.
 Experience of Permit-To-Work system.
 Good communication skills in English. Must be able to demonstrate conducting a Toolbox Talk.
 Safety Officers/HSE Engineers/All Managers/Project Engineers will not be accepted for nomination as
Competent Persons.

Please Note:

1) It must be noted that the role of a Competent Person while working on or near to Transco assets is a
significant one. If any candidate is not confident to fulfill the requirements of this role then he must
refuse to accept this role.
2) Any Competent Person may be contacted on a random basis by Transco HSEQ department for an
audit of the safety documents that he has received and cleared.
3) If found in violation of Transco SSR either as an outcome of the safety document audit or observed
on site and reported by a Transco employee, competency of the CP will immediately be withdrawn.

4) Process for Competent Person/HSE Officer

4a) Application Process

i) Request for HSE Registration (First time only)

Competency requests are to be raised online through Maximo e-Competency application. All Contractors
are required to Register for the first time with Transco through a link provided on Transco webpage
(www.transco.ae). Once registration request is approved the Contractor will get a user name and password
which they can use to access Transco Maximo application to raise their Competency Requests.

ii) Request for Competency

When the request is filled and submitted along with all required attachments (documentation), Transco
HSEQ will review it and approve if all requirements are fulfilled. In case otherwise, the same will be returned
for correction or rejection as applicable. Once approved the next steps involve HSE assessment and/or
Technical assessment depending upon the nature of the request. These will also be executed through
Maximo e-Competency application. All communications during this process will be through email
notifications and Maximo application.

iii) Request for HSE Officers Approval

Contractor (2nd Party) has to submit all of the required documentation to Transco HSEQ Office along with a
request letter to be reproduced as per the template given in the Appendix-1.

4 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

iv) Processing of Requests

The application (online through e-Competency application or hard copy submission) will be reviewed by
HSEQ. If there is any requirement of additional documentation, this will be communicated. Once all the
documentation is submitted, appointment date and time will be given. This appointment will be arranged
within approximately 3 weeks after receipt of the request letter and all required documents. An incorrectly
completed request letter or inadequate documents will delay the appointment.

Competency process involves HSE and/or Technical assessments. HSE assessment assesses a candidate’s
understanding and underpinning knowledge of Transco SSR as applicable to competent persons and his/her
ability to execute the intended works in a safe way. Technical assessment assesses a candidate’s knowledge,
training & experience required to execute the intended works in an appropriate manner.

4b) HSE Assessment (Written Test and Interview)

The nominated candidate for competency shall read and understand Transco SSR Summary for Contractors
(for HSE Officers, they should go through their Project HSE Plan) before attending the written test &
interview. If they are unsure on any items, they must seek help and assistance from their company’s senior
HSE persons. They should also fully understand their company Risk Assessments and Method Statements for
the relevant works.

Most of the questions in the HSE written test are multiple choice questions, although some questions would
require descriptive answers. Answers to most of the questions are contained within this booklet and the
Risk Assessments/Method Statements for the relevant work. For HSE Officers, the questions are of basic
nature that all HSE Officers are expected to know. They shall read and understand the relevant Project HSE
plan and Risk Assessments.

4c) Technical Assessment

On successful completion of the HSE assessment, the candidate will be sent for Technical assessment (it is
possible that Technical Assessments are conducted prior to HSE assessments). Subject to successful
completion of the technical assessment and fulfillment of all documentation requirements, the candidate
will be provided with the competency as agreed between HSE and concerned Technical Assessor.

5) Nature of Work (For 2nd Party Contractor Competent Persons)


The nature of work for 2nd Party Contractors shall be selected from the work categories as stipulated in
Attachment-4 and 5. The following rules apply for category selection.

Column-1 Column-2 Column-3 Column-4


(Category) (Classification) (Equipment) (Nature of Works)

Power Projects 1 or 2 items max 1 or 2 items max 1 or >1 items 1 or >1 items

Water Projects 1 or 2 items max 1 or 2 items max 1 or >1 items 1 or >1 items

5 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

6) General Restrictions
 A candidate needs to score at least 90% in the HSE written test in order to proceed to the HSE
interview stage.
 A candidate will only have two opportunities/attempts to clear the testing process.
 The candidate must turn up on the given date and time. Failure to turn up at the required time will
result in the test & interview being cancelled and counted as one unsuccessful attempt.

7) Discipline Based Competency (DBC) – Criteria and Restrictions


All applicants for Transco competency will be considered for DBC by default. These requests will be
assessed against the following criteria;
 Exposure to Transco SSR or to a Safe System of Work for more than a year.
 Relevant work experience of at least 3 yrs.
 No SSR violation(s) in the last one year in case of an already Transco approved CP.
 Good performance on HSE assessment (written exam and interview).

DBC is valid for working on Transco Projects only as a Main Contractor. However, on a case-by-case basis,
DBC can also be used for working as a Subcontractor. In case of working as a Subcontractor, it is the
responsibility of Transco Projects to ensure the following;
 There is a record of the approval of the Subcontractor,
 There exists a formal agreement between the Main and Subcontractor, and
 That the CP with DBC is competent to execute the work.

In case if an applicant is not successful in getting a DBC, then the maximum number projects on his/her
competency will be in accordance with Section F.

C - ATTACHEMENTS
Appendix-1: Request Letter Template for HSE Officer – Transco Projects
Appendix-2: Request Letter Template for Competent Person (3rd Party Contractor)
Appendix-3: Requirements for different Request Types
Appendix-4: Work Categories for Power (2nd Party Contractor)
Appendix-5: Work Categories for Water (2nd Party Contractor)

6 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

Appendix 1 - REQUEST LETTER TEMPLATE FOR HSE OFFICER - TRANSCO PROJECTS (To be produced on
Company Letter Head)

Date:
Reference No:
Contact e-mail:
To: HSEQ Manager
Abu Dhabi Transmission & Despatch Company (TRANSCO)

Subject: Request for HSE OFFICER (NEW/RENEWAL)


Please arrange for below mentioned to be assessed by Transco for qualifying as a HSE Officer for the
following contract/project.

Contract/Project No & Detail: ________________________________________________________

Name: Job Title:


Education: Overall Experience (years):
UAE Visa type: Experience in the UAE (years):
Company/Sponsor Name: Experience as HSE Officer (years):
NEBOSH: OSHAD Registration Card:
First Aid Training: Fire Fighting Training:
Previous HSE Officer Approvals (Transco / Others):

We confirm that in case of an absence of the approved HSE Officer, a replacement HSE Officer approved
by Transco shall be provided for the subject contract/project.

Regards,

Name & Signature (company Managing Director or Equivalent)

Attachments:
- Candidate CV
- NEBOSH Certificate copy
- First Aid Training & Fire Fighting Training Certificates copy
- Transco or other Company HSE Officer approval certificates copy, if any
- Passport copy with valid visa page or Labour card copy.

7 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

Appendix 2 - REQUEST LETTER TEMPLATE FOR COMPETENT PERSON (For 3rd Party Contractor). This is to
be printed in your Company Letter-Head Paper.
Date:
Reference No:
Contact e-mail:
To: HSEQ Manager
Abu Dhabi Transmission & Despatch Company (TRANSCO)

Subject: Request for COMPETENT PERSON (NEW/RENEWAL/UPGRADING)

Please arrange for below mentioned to be assessed by Transco for qualifying as a Competent Person for
works near/on Transco premises for the following contract/project.

Contract/Project No & Detail:__________________________________________________________

Name: Job Title:


Education: Overall Experience (years):
UAE Visa type: Experience in the UAE (years):
Company/Sponsor Name:
First Aid Training: Fire Fighting Training:
Previous Competency Certificate (Transco / Others):

Nature of Work (works to be carried out under Safety Document):


Category of Work HV LV Civil Mechanical
Brief Work Description

We confirm that the Competent Person will not leave the work site while works are in progress under
Transco System Safety Rules.

Regards,

Name & Signature (company Managing Director or Equivalent)

Attachments:
- Candidate CV (must be detailed with roles & reasonability)
- Reply to the Notice of Intent issued from Transco (first issue & latest renewal)
- Specific Work Method Statement and Risk Assessment for work in vicinity of Transco asset(s).
- First Aid Training & Fire Fighting Training Certificates copy
- Other Company Competency Certificates copy (if any)
- Emirates ID copy, passport copy with valid visa page & Labour card copy.

8 This Document is for General Guidance only | By HSEQ Department, Transco


New Request Renewal Rejected candidate Adding new/changing Adding new/changing Renewal
project(s) only category of work
Eligibility : For expired certificates -A candidate is rejected Eligibility: Eligibility: 1-For expired certificate
Please see the (more than 3 yrs) when he/she is unable 1-Transco issued 1-Transco issued (less than 3 yrs)

9
Transco SSR to clear the competency certifcate competency certifcate 2-For validity extension
Guidance sheet for competency process in holder only. holder only. only.
Contractors two attempts. 2-Atleast spends three 2-Atleast spends three
Request Type (with Description)
-The company can re- months on his/her months on his/her
request after six month existing competency existing competency
from the date of certificate. certificate.
rejection, with
providing justification
on his/her
improvements.
Request Letter (Online or as instructed
Yes Yes Yes Yes Yes Yes
by HSEQ)
Project Limitation(s) if not considered As per the existing
Three Three One Three Three
for DBC certificate
Safety Document copies
NA Yes NA Yes Yes Yes
(LAP/PTW/SFT)

FA & FF (valid certificate) Yes Yes Yes Yes Yes Yes


Formal Supervsion skills training (for
Yes Yes Yes Yes Yes Yes
2nd party contractors only)
COMPETENCY ASSURANCE GUIDANCE BOOKLET-1

Visa Page* Yes Yes Yes Yes Yes Yes


1-Transco issued NOI 1-Transco issued NOI 1-Transco issued NOI 1-Transco issued NOI 1-Transco issued NOI Transco issued NOI
(Notice of Intent) 2-WMS/RA 2-WMS/RA 2-WMS/RA 2-WMS/RA
2-WMS/RA (Work
Appendix 3 - REQUIREMENTS FOR DIFFERENT REQUEST TYPES

Other documents** Method


Statement/Risk
Assessment)

HSE Assesment (written exam) Yes Yes Yes NA*** Yes NA***

HSE Assesment (Interview) Yes Yes Yes NA Yes NA

Technical Assessment (Test/Interview) Yes Yes Yes Yes Yes NA

This Document is for General Guidance only | By HSEQ Department, Transco


Request Letter processing time Within 3 weeks Within 2 weeks

Competency Certificate Validity*** 1 year 1 year 6 months 1 year 1 year 1 year

*Profession mentioned in the visa page should be relavant to the intended works (For example a person with 'Clerk' profession on the visa page is not acceptable for competency)
**For works near/crossing Transco existing serivces (i.e Overhead Line/UG Cable/UG Water Pipeline)
***Subject to HSEQ Department approval.
Please note: 1) Any change(s) on the above requirements is the sole descretion of HSEQ Department.
2) Any subcontractor requesting for competency shall submit a copy of their agreement with the main contractor.
Revision-2, January 2018
COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

Appendix 4 - WORK CATEGORIES FOR POWER

Revision No : 0
Work Categories - Power Projects Date: 01/10/2014

CATEGORY CLASSIFICATIONS EQUIPMENT NATURE OF WORKS


Column-1 Column-2 Column-3 Column-4

1. GIS
2. Transformers a. Installation & related works
PLANT 3. Shunt reactors b. Testing & Commissioning works
4. Capacitor banks c. Snags &warranty works
5. Station Auxiliary systems

a. Installation & related works


1. Protection & control system
b. Testing & Commissioning works
P&C SYSTEM 2. SCMS system
c. Integration & related works
3. Station Auxiliary systems
d. Snags &warranty works

ELECTRICAL (HV) a. Laying of power & Fibre optic cables


1. Power cable b. Preparatory works for Termination
CABLE 2. Fibre optic c. GIS works related to cable insertion
3. GIS Cable box d. Testing & Commissioning works
e. Snags &warranty works
a Stringing and related works
b. Erection of Towers, Gantry & related works
1. Towers
c. Laying of Fiber optic cables
OHL 2. Gantry
d. Testing & Commissioning of Fiber optic cables
3. Fiber optic cable
e. Crossing Existing cables, Existing OHL or existing equipment
f. Snags &warranty works
1. GIS
2. Transformers a Installation & related works
PLANT 3. Shunt reactors b. Testing & Commissioning works
4. Capacitor banks c. Snags &warranty works
5. Station Auxiliary systems
a. Installation & related works
1. Protection & control system
b. Testing & Commissioning works
P&C SYSTEM 2. SCMS system
c. Integration & related works
3. Station Auxiliary systems
d. Snags &warranty works

a. Laying of power & Fibre optic cables


1. Power cable b. Preparatory works for Termination
CABLE 2. Fibre optic c. GIS works related to cable insertion
3. GIS Cable box d. Testing & Commissioning works
ELECTRICAL (LV) e. Snags &warranty works
a. Stringing and related works
b. Erection of Towers, Gantry & related works
1. Towers
c. Laying of Fiber optic cables
OHL 2. Gantry
d. Testing & Commissioning of Fiber optic cables
3. Fiber optic cable
e. Crossing Existing cables, Existing OHL or existing equipment
f. Snags &warranty works
a. Installation & related works
TELECOM 1. Telecom system b. Testing & Commissioning works
c. Snags &warranty works
1. LDC System (SCADA..Etc.) interface a. Installation & related works
related equipment b. Testing & Commissioning works
LDC
2. RTU’s & modems c. Integration & related works
3. Metering System d. Snags &warranty works
1. HVAC a. Installation & related works
MECHANICAL MEP 2. Fire Protection b. Testing & Commissioning works
3. EOT Crane & Hoists c. Snags &warranty works
a. Civil works inside the substation boundary
SUBSTATION 1. Substation buildings inside the boundary
b. Snags &warranty works
a. Civil works related to power cables
1. Power cable b. Laying of power & Fibre optic cables
CABLE
2. Fibre optic cable c. Crossing Existing cables, Existing OHL or existing equipment
d. Snags &warranty works
CIVIL
a. Civil works related to OHL
b. Stringing and related works
1. Towers
c. Erection of Towers, Gantry & related works
OHL 2. Gantry
d. Laying of Fiber optic cables
3. Fiber optic cable
e. Crossing Existing cables, Existing OHL or existing equipment
f. Snags &warranty works

10 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

Appendix 5 - WORK CATEGORIES FOR WATER


Revision No : 1
Work Categories - Water Projects Date: 01/03/2015

CATEGORY CLASSIFICATIONS EQUIPMENT NATURE OF WORKS


Column-1 Column-2 Column-3 Column-4
1. Switchgear
2. Transformers
PLANT 3. Capacitor Bank
4. MV VFD System a. Installation
5. MV Motors (Pumps) b. Testing
ELECTRICAL (HV)
CABLE 1. Power Cables c. Commissioning
d. Snagging &warranty works
1. Protection
P&C SYSTEM 2. AVR System
3. HSBT system

1. Switchgear
2. LV VFD System
3. LV Motors (Pumps)
PLANT
4. LV Panels
5. Station Auxiliary Systems (DC & UPS System, Capacitor Bank,
DG Set, Lightning Protection & Earthing)

a. Installation
1. I&C Panels b. Testing
2. Marshalling Cabinets c. Commissioning
I&C SYSTEM 3. Instruments d. Snagging &warranty works
4. Analyzers
5. Protection

ELECTRICAL (LV) 1. Induced Current


CATHODIC PROTECTION
2. Sacrifical Annodes

1. FOC Cables
CABLES
2. LV & Control Cables
a. Installation
1. LDC System (SCADA, etc.). Interface related equipement
b. Testing
2. RTU's & Modems
LDC c. Commissioning
3. Metering System
d. Snagging &warranty works
4. Telecom
e. Integration & related wroks

1. Small Power and Lighting System


OTHERS
2. Other LV Motors

1. Pumps a. Installation
2. Valves b. Testing
PLANT 3. Compressors c. Commissioning
4. Surge Vessels d. Snagging &warranty works
MECHANICAL 5. Hypo-chlorination
1. HVAC
MEP 2. Firefighting
3. Cranes

a. Civil works
PUMPING STATIONS 1. Pumping Station buildings inside the boundary
b. Snagging & warranty works
a. Civil works related to pieplines
1. Pipelines inside PS boundary b. Tie-in works
PIPELINES 2. Pipeline outside PS boundary c. Crossing existing transco assets
d. Laying of pipelines
e. Snagging & warranty works
1. Fiber Optic Cables inside PS boundary a. Civil works related to FO cables
2. Fiber Optic Cables outside PS boundary b. Laying of FO cables
3. LV Cables inside PS boundary c. Crossing exisitng Transco assets
CABLES
CIVIL 4.LV Cables outisde PS boundary d. Snagging & warranty works
5.HV Cables inside PS boundary e. Civil works related to Laying of LV cables
6.HV Cables outisde PS boundary f. Civil works related to Laying of HV cables
1. Concrete Reservoirs
RESERVOIRS/TANKS a. Civil work related to reservoirs/tanks
2. Steel Reservoirs
1. RTU Shelter inside PS boundary a. Civil works
RTU SHELTERS
2. RTU Shelter outside PS boundary b. Snagging & warranty works
a. Civil works related to pipeplines
1. Chambers inside PS boundary
b. Civil works related to FO cables
CHAMBERS 2. Chambers outside PS boundary
c. Tie-in works
d. Snagging & warranty works

11 This Document is for General Guidance only | By HSEQ Department, Transco


COMPETENCY ASSURANCE GUIDANCE BOOKLET-1 Revision-2, January 2018

D - CONTRACTORS/CONSULTANTS VISITING HOURS

Activity Timings

HSE Assessment (Test/Interviews) Every Sunday, 07:30 to 14:00

Technical Assessment As agreed with Technical Assessor

Meeting with HSEQ Manager / HSE Engineer By formal appointment only

Sunday 07:30 to 14:00


Submission of Requests for Competency/HSE
Officer and/or any other related issues
Tuesday & Thursday 07:30 to 10:00

For comments and suggestions, please send us your feedback as per below contacts

Abu Dhabi Transmission and Despatch Company (TRANSCO), HSEQ Department

P.O. Box: 173, Abu Dhabi, UAE. Tel: (2) 4164000/ Fax: (2) 6946314/6313
Web: www.transco.ae, Email: hseq@transco.ae

12 This Document is for General Guidance only | By HSEQ Department, Transco