Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
Page 1 of 6
REFERENCE
(Control
Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
The procuring entity prepares
Project Procurement
Management Plans (PPMPs),
Technical Specifications, Scope of
Work or Terms of Reference,
CU-5 where applicable. 7 7 6 7 8 8 6.75 8 7.375 8 7.6875 8
Page 2 of 6
REFERENCE
(Control
Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
Page 3 of 6
REFERENCE
(Control
Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
For goods, the invited
observers are from a
specific chamber-member of
the Philippine Chamber of
CU-14 Commerce and Industry. 8 6 5 4 4 4 5.75 4 4.875 4 4.4375
Page 4 of 6
REFERENCE
(Control
Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
The procuring entities / BAC
ensure that the invitation is
received at least five (5)
calendar days before each
CU-19 procurement activity. 7 7 7 7 6 6 7 6 6.5 7 6.75 14
Page 5 of 6
REFERENCE
(Control
Universe) CONTROL SIGNIFICANCE (S) MATERIALITY (M) AVERAGE TOTAL Total RANK
Magnitude S&M SMCR
Impact on Impact on Expected of Average CONTROL Average
CO OO Visibility Benefits Quantitative Consequence S M Rating RISK (CR) Rating
The BAC ensures that the
procuring entity abides by the
standards set forth by RA 9184.
CU-23 10 10 10 10 10 10 10 10 10 10 10 1