SITUBONDO
PRELIMINARY STUDY
SRI
TERMINAL BBM
1. Storage Tanks
2. Pump House
3. Filling Shed
4. Truck Parking 4 3
5. Office
6. Utility House 6
7. Laboratory 75
8. Canteen TERMINAL LAYOUT PLAN
9. Mushallah TERMINAL LAYOUT PLAN
8
9
TERMINAL LAYOUT (JETTY) PLAN
RECEIVING GASOLINE BACKLOADING
Jetty 1,
SRI
Gasoline Tanker
Max. 25.000 DWT
T - 01
Jetty 2,
SRI
Gasoline Tanker
T - 02 Max. 6.500 DWT
SRI
T - 03 Jetty1,
Gasoil Tanker
Max. 25.000 DWT
SRI
Jetty 1,
Gasoline Tanker T - 04
Max. 100.000 DWT Jetty 2,
Gasoil Tanker
Max. 6.500 DWT
SRI
T - 05 TRUCK LOADING
SRI
T - 06
SRI
T - 07 Jetty 2, Bunkering
BUNKERING*) Max. 25.000 DWT
SRI
Jetty1, T - 08
Gasoil Tanker
Max. 100.000 DWT
GASOIL
Storage Tanks :
15.000 KL – 2 Unit
10.000 KL – 2 Unit
Jetty1, Bunkering
*) To be Confirmed
TERMINAL FLOW DIAGRAM PLAN Max. 100.000 DWT
RECEIVING FACILITIES
Facilities :
• Jetty 1
Depth : 19 m
LOA : +/- 300 m
DWT Max. : 100.000
• Marine loading arm
• Piping line from jetty to tank farm
• Flowrate : 1.500 KL/Hour (To be confirmed)
STORAGE FACILITIES
Storage of Gasoline and Gasoil which was delivered through the piping line from jetty to
tank farm.
Facilities :
• Storage Tank
Capacity : 15.000 KL – 4 unit (@ 2 unit for each product)
Capacity : 10.000 KL – 4 unit (@ 2 unit for each product)
Total capacity : 100.000 KL
• Inter-tank
Delivery of Gasoline and Gasoil to vessels, tank truck and bunker services.
Facilities :
TO VESSEL (BACKLOADING)
• Jetty 1Jetty 2
Depth : 19 m Depth : 11 m
LOA : 180 m LOA : 100 m
DWT : Max. 35.000 MT DWT : Max. 6.500 MT
• Marine loading arm for fuel products & LPG (future)
• Piping line from tank farm to Jetty
• Flowrate : 500 KL/Hour (To be confirmed)
TO TANK TRUCK
• Filling Shed
Number of bay : 2
• Truck loading arm
• Piping line from tank farm to Filling shed
• Flowrate : 70 KL/Hour
TO BUNKERING
• Jetty 1 and Jetty 2
• Loading Hose
• Piping line from tank farm to Bunkering
• Flowrate : 135 KL/Hour
3 Utility System
6 HSE Facilities
12 Navigation Aids
14 Miscellaneous
FEED
EPC Works
Mechanical Completion
Operational Acceptance
TERIMA KASIH