Академический Документы
Профессиональный Документы
Культура Документы
Ver. 2.0
User’s Manual
Online Submission of Budget Proposal System: User’s Manual ver.2
Department of Budget and Management
Table of Contents
1 Introduction ______________________________________________________________ 4
1.1 About the System _____________________________________ 4
3 Transactions ______________________________________________________________ 7
3.1 Coverage _________________________________________ 7
3.1.1 To Select Coverage: _____________________________________ 7
3.1.2 Filtering Operating units _________________________________ 10
3.1.3 Selecting a Coverage ___________________________________ 11
1 Introduction
1.1 About the System
2 Getting Started
2.1 Log in
Click button or hit Enter key to confirm login. On successful login, the
Online Submission of Budget Proposal home page will be displayed.
Note: If the user is logged-on to the system and there has been no activity
for about 10 minutes, the user is automatically disconnected from the
system and needs to re-login.
In case of login failure, contact the DBM Budget Specialist and verify if
the user account is correctly enrolled to OSBP.
3 Transactions
3.1 Coverage
Upon successful login, this page is displayed. This page allows the user to view and
select the Operating units under the Department and Agency. (Figure 3)
3. Upon selecting an Agency, the list of Operating Units within the user’s coverage
will be displayed. (Figure 6)
Note: Region and Division filter criteria is only for DepEd and all other
agencies with Division as part of their organizational hierarchy.
To clear the search keyword, click the clear icon. On click, the system displays all
operating units.
• BP201 (A,B,C,D)
• Other BP Forms
• Tags
• Strategic Objectives
• BP Reports
This page allows the user to enter information for the following forms:
1. BP 201 A – Obligations for Personnel Services (PS)
2. BP 201 B – Obligations for Maintenance and Other Operating Expenses
(MOOE)
3. BP 201 C – Obligations for Financial Expenses (FINEX)
4. BP 201 D – Obligations for Capital Outlays (CO)
Nb Element Description
r
1 Displays the Approved Ceiling and Available
Balance for PS, MOOE and FE for the selected
agency.
2 Displays the links to other transactions
• Other BP Forms
• Strategic Objectives
• BP Reports
• Quick View
• Logout - EXIT OSBP Program
To Add:
1) Click Add using the Add link shown below
To Delete:
1) Click “Del” link
2) System displays a confirmation message.
3) Click Yes to confirm delete.
Note: Deleting of mother P/A/P will automatically delete all its descendants
and their respective appropriations. Delete functionality is disabled for
existing P/A/Ps. Only the newly-created P/A/Ps and their descendants
are allowed to be deleted.
The system displays header with the name of the Department, Agency and its
Operating Unit, if applicable.
The system displays the list of P/A/Ps on the left side of the page under the Major Final
Output Program/Activities/Projects column.
Amounts displayed are grouped by Allotment Class. Each Allotment Class is divided into
2 columns. The first column is the ‘Within the Ceiling’ column. It contains amount within
the budget ceiling of an agency set by DBM. The ‘Proposal’ column contains the total
proposed budget appropriation for an activity.
To view/edit Financial Expenses allotment class, click the ‘Show More…’ link. The
system also displays the ‘Total’ column. This shows the summation of all amounts for all
allotment classes.
1) Click the underlined amount in blue color under the specific allotment class
2) Select the applicable fund source by selecting a value on the Authorization
dropdown list and a Fund Category value on its dropdown list. A list of Fund Sub
Categories is displayed. Click the icon beside a Fund Sub Category.
Note: Object of expenditures of each activity and Fund Source from GAA
level is automatically loaded to the Proposed Year with 0 amount. For
other object of expenditures not included in the list but is part of the
budget proposal of an agency, use the ‘Add Item’ functionality.
If the selected P/A/P and Fund Source has objects of expenditure existing in GAA, the
list of objects with 0 amount are displayed on the screen.
1) Enter amount in the “Within the ceiling amount” field. Please take note that the
entered amount will also be reflected in the budget proposal column. To edit the
Proposal field, just go directly to the Proposal column and enter the amount.
3) To save any modifications made on the budget ceiling and proposal columns,
click SAVE.
Note : In case that you need to add an object of expenditure with above the
ceiling amount Only, select the object of expenditure then Click Save.
The object will be added with 0 as the amount. Edit the Proposal
column to reflect how much the ‘Above the Ceiling’ amount is.
3) To open the Sub Object List lookup window, click the button
The Fund Category shows another level of groupings of the Appropriation Source
The Fund Sub Category displays subgroup/s of the selected Fund Category
4) Select Fund Sub-category by double clicking the row or clicking the icon.
The quick view page offers snapshots of the particulars entered in the BP201 page.
To view the report details, select a report on the left side of the page.
To change the budget year of a particular report, click the links on top of the page as
shown below.
This page displays other forms to be submitted. To display the different forms, click the
form name at the left of the screen.
Nb Element Description
r
1 Allows the user to switch among the screen.
• Back to Main - Back to main page
• Back to Coverage - Back to coverage
page
• Preview - Print PDF Report; a
separate instance of page will be
displayed
• Exit-248 - EXIT OSBP Program; Back
to login page
2 The icons displays the current status of the BP
form
To Update Status:
1) Select status for a P/A/P.
2) Save changes by clicking the Save button.
To navigate between the current and proposed programs, click the tab title.
Before adding record to Performance Indicator tab, make sure that PI Set No. per
MFO/FPAP ID is already available in the Performance Indicator Set.
3.4.5.2 Grants
Delete Retiree:
1. Double click retiree
2. Click Delete
3. A confirmation message is displayed
4. Click YES to confirm delete
Edit Provision:
1. Click the provision row.
2. Enter Provision Title and Justification
3. Click Save
Delete Provision:
1. Click the provision row
2. Click Delete
3. A confirmation message is displayed
4. Click YES to confirm delete
Provision Details
1. Double click provision row
2. The provision details window is displayed (Figure 29)
3. To add a new provision detail
a. Click New
b. A new row in the list is displayed
c. Enter provision detail
d. Click Save
4. To delete a provision detail
a. Click on provision detail row to select
b. Click Delete
This form presents the agency Gender and Development (GAD) plan and budget in
accordance with Republic Act 9710 or Magna Carta of Women and PCW-NEDA-DBM
Joint Circular 2012-01.
2. Select MFO/PAP
a. Click the lookup icon
b. System displays list of GAD FPAP
c. Double click a FPAP to select
3. Enter Cause of Gender Issue, GAD Objective and GAD Activity
4. Click Save
This form reflects the results and accomplishments of the GAD activities that were
implemented.
2. Select MFO/PAP
a. Click the lookup icon
b. System displays list of GAD FPAP
c. Double click a FPAP to select
3. Enter Cause of Gender Issue, GAD Objective and GAD Activity
4. Enter Approved Budget and Cost/Expenditure (optional)
5. Click Save
3.5 TAGS
This functionality helps in identifying priority programs in the agency in support of the
government initiatives.
The five KRAs under the President’s Social Contract are identified as:
1) Transparent, accountable, and participatory governance;
2) Poverty reduction and empowerment of the poor and vulnerable;
3) Rapid, inclusive, and sustained economic growth;
4) Just and lasting peace and the rule of law; and
5) Integrity of the environment and climate change adaptation and mitigation.
MITHI
ICT related programs and projects should be tagged as part of MITHI. The MITHI
Steering Committee endorses these programs and projects to constitute the ICT budget
proposal for the agency.
Nb Element Description
r
1 On click, takes the user back to the Main Menu
screen
2 Allows the user to switch views between the
two budget years, the current year and the
proposed year
3 Allows the user to switch among the screen for
the different types of appropriations.
• General Administration and Support
(GAS)
• Support to Operations (STO)
OSBP User’s Manual ver. 2.0
March 03, 2014 Page 42 of 59
Online Submission of Budget Proposal System: User’s Manual ver.2
Department of Budget and Management
• Operations
• Locally Funded Projects (LFPs)
• Foreign Assisted Projects (FAPs)
2. The system displays a list of PAPs under the tag. (Figure 35)
Tag objects:
1. Double click an activity from the MFO/PAP list.
2. The tagging screen is displayed. This page allows the user to associate the
objects to the tags.
Nb Element Description
r
1 Displays the Coverage information such as
Department Name, Agency Name and
Operating Unit
2 Allows the user to switch among the tagging
views
• KRA
• GBP
• PB
• MITHI
• CC
6. Click Save
7. Click Back
To Tag GBP:
1. Click a row and enter amount under the relevant allotment class.
4. Click Save
5. Click Back
2. Click Save
3. Click Back
3.5.2.5 MITHI
To Tag MITHI:
3. Click Save
4. Click Back
Mass Update
1. Check all the activities to update
2) Enter PS, MOOE, CO, FinEx amounts and click apply icon
3) Click Save
4) Click Back
Single Update
1. Double click on the amount under adaptation / mitigation column
OSBP User’s Manual ver. 2.0
March 03, 2014 Page 49 of 59
Online Submission of Budget Proposal System: User’s Manual ver.2
Department of Budget and Management
3. Click Save
4. Click Back
This page displays the strategic objectives of the coverage. The user is allowed to edit
the information found in the page and save the updates.
3.7 BP REPORTS
To generate OSBP reports, click the BP Reports link. The OSBP Reports page is
displayed in another window, as shown below.
In the BP Reports login page (Figure 37), enter the same user name and password used
in OSBP login page (Figure 1).
Upon successful login, the BP Reports main page is displayed (Figure 38).
Nb Element Description
r
1 Allows the user to logout from the BP Reports
system
2 Allows the user to download the User Guide
3 Displays the different Report Categories. This
allows the user to browse through the
different reports.
For the report selected from the Reports Category section, specify the following
parameters:
Note: Not all parameters listed below are displayed in each report. Only the applicable
parameters for the Report are displayed in the screen.
Parameter Description
Report Enter Report Description for specific report
Department Select a department from the list of departments within user’s
coverage
Agency Select an agency from the list of agencies for the selected
department
Region Select a region from the list of regions within the selected
agency (Applicable only to DepEd)
Division Select a division from the list of divisions within the selected
region
Operating Unit Select Operating Unit within coverage
Appropriation Source Select Appropriation Source (New Appropriation, Automatic
Appropriation or Others)
Year Select budget year (Either the current or the proposed year)
Type Select Amount Type (Within ceiling or above ceiling)
Particulars Select Particular Type of Staff (Contractual, Emergency,
Substitute or Other Related Personnel)
Retirement Type Select Retirement Type (Mandatory or Optional)
Select Provisions Select Provision Type (Special or General)
Report Format Select Report Format to generate (Either PDF or Excel file
format)
To generate a report
To Edit Signatories
This functionality allows the user to batch submit all BP Forms of an agency to DBM.
This functionality is only available to users who are assigned to “Head” account type. An
error message will display on the screen if the user is not allowed to use this
functionality.
If the user account is allowed to submit the budget proposal, a confirmation report
(Figure 39) is displayed in the screen. Check the ‘I Agree’ checkbox to enable
the ‘Continue’ button. Click ‘Continue’ button to submit the final copy of
the budget proposal to DBM. When the budget has been submitted without errors, the
system displays a success message.
On successful submit, the “Submit to DBM” button in the main page is disabled (Figure
40). BP201, Tags and all other forms are displayed in view mode only.
After submitting successfully, upon going to BP201, the status is set to ‘Closed’ and the
red lock icon on the right portion of the page is displayed. (Figure 41)