Lr.No.To/ /BT Roads-Package -01/2017-18, Dated: -09-2019

Sub: I) Providing BT road from Ankoli PR road to Thantholi from Km 0/0 to 0/300 of Adilabad
(M) II) Providing BT Road from Ankoli road to Kolamguda from Km 0/0 to 0/500 of
Adilabad (M)III) Providing BT Road from Ankoli PR Road to Chinthaguda from Km 0/0 to
0/800 of Adilabad (M) IV) Providing BT Road from MAmidiguda PR Road to Chinna
Salapalguda from Km 0/0 to 0/500 of Adilabad (M) V) Providing BT Road from
Pippaldhari PR Road to Chinna Lokari from Km 0/0 to 0/500 of Adilabad (M) in Adilabad
District.

***
Respected Sir,

The above work administratively sanctioned for Rs.172.00 Lakhs Vide GO Rt No


573, of TRIBAL WELFARE (EDN-BUD) DEPARTMENT, Date 07-10-2016 . Govt of Telangana and
Technically Sanctoned for Rs 140.00 Lakhs Vide IS no /2016-17 of CE.TW.Hyd,date 25.10.2016
and the work was let out to M/s Srihar Constructions, vide Superintending Engineer Tribal welfare,
warangal L.S.AB.No. /2017-18 Dt.09.06.2017 with a stipulated period (09) Nine months ( i.e.,
08.02.2018) for completion @ 0.20 % Less on ECV Rs 90,58,510/-

As per the site condition certain deviations necessitated during the execution of work. The
main reasons for working estimate are as follows

a)Embankment:
The existing formation of the road is 5.00 m only. Now as the formation of road is provided as
8.00 m. As the top and bottom formation of road is increased as per the existing site condition, the
embankment quantity increased accordingly. In the sanctioned estimate, there is on LS provision for
this item, now detailed quantities are worked out as per the requirement mentioned above.

b) Providing, Laying, Spreading and compacting Wet Mix Macadem:

In the sanctioned estimate wmm provide for the road portion only. Where as to connect the lower
hierarchy to the higher hierarchy road, wmm is essential. Hence wmm quantity increased accordingly.

By incorporating all the above deviations, the working estimate is worked out to Rs.140 .00
Lakhs against the technically sanctioned amount of Rs.140.00 Lakhs. The early approval of woking
estimate is necessary to proceed with the further work. Hence it is submitted for approval.

Dy. Executive Engineer,


TW Sub-Division, Echoda
2

The following tabular format shows the details of Embankment and WMM Quantities as per Working Estimate for the above five Roads.

Embankment WMM
Length
S.
Name of Road (in As per Sanction
No
meters) Estimate For As Per Working As Per Sanction As PerWorking
LS Provision

Qty. Amount Qty Amount Excess Less Qty Amount Qty Amount Excess Less
Providing BT road
1 from Ankoli PR 285 141 29229 243 50301 21072 214 445434 242 504304 58870.00
road to Thantholi
Providing BT
2 Road from Ankoli 500 313 64885 534 110538 45653 281 636918 298 675697 38779.00
road to Kolamguda
Providing BT Road
from Ankoli PR
3 700 3348 694040 3815 789705 95665 394 880110 288 642731 237379.00
Road to
Chinthaguda
Providing BT Road
from Mamidiguda
4 650 3687 764315 4382 907074 142759 366 860231 342 804022 56209.00
PR Road to Chinna
Salapalguda

Providing BT Road
from Pippaldhari
5 500 1822 377700 2015 417105 39405 281 610481 288 624156 13675.00
PR Road to Chinna
Lokari

Total 2635.00 1930169 2274723.00 344554.00 3433174.00 3250910.00 111324.00 293588.00

Dy. Executive Engineer,


TW Sub-Division, Echoda