ÍNDICE
1. INTRODUCCIÓN................................................................................................................ 3
2. OBJETIVO......................................................................................................................... 3
3. ALCANCE DE LOS TRABAJOS.......................................................................................4
4. DOCUMENTOS Y PLANOS DE REFERENCIA.................................................................4
5. IDIOMA Y UNIDADES DE MEDIDAS...............................................................................10
6. CODIGOS Y NORMAS.....................................................................................................11
7. UBICACIÓN DE LAS INSTALACIONES..........................................................................11
8. CONDICIONES DEL SUELO...........................................................................................13
9. CARACTERÍSTICAS DE LOS MATERIALES.................................................................13
10. PARÁMETROS SÍSMICOS..............................................................................................14
11. PREMISAS DE DISEÑO..................................................................................................14
12. CARGAS SÍSMICAS........................................................................................................17
13. CHEQUEOS..................................................................................................................... 17
14. CÁLCULO DE LA FUNDACIÓN......................................................................................20
15. ANEXOS........................................................................................................................... 21
1. INTRODUCCIÓN
La Gerencia de Procesos de Superficie de la División Costa Oriental del Lago
desarrolla actualmente el proyecto “INGENIERIA DE LAS FACILIDADES PARA LA
INSTALACIÓN, DE UNA (01) PLANTA DE TRATAMIENTO DE AGUA PARA LA
INYECCIÓN DE VAPOR EN EL CAMPO DE LA BACHAQUERO”. La Empresa Mixta
PETROZAMORA S.A. lleva adelante las actividades relacionadas con este proyecto en
materia de Exploración y Producción de Petróleo.
El proyecto cubre la necesidad de instalar una nueva planta de tratamiento de agua
para apalancar la estimulación térmica mediante la inyección de vapor a pozos
petroleros garantizando el suministro de agua tratada y desmineralizada para los
generadores de vapor portátiles, con lo cual se fortalece la producción de crudo pesado
para el distrito.
La Planta de Tratamiento Bachaquero contará con un sistema de tratamiento de agua
diseñado para la producción continua de agua filtrada, suavizada y desmineralizada a
partir del agua del lago de Maracaibo. El agua salobre se hace pasar a través de una
serie de filtros de arena. Las etapas posteriores de tratamiento están conformadas por
el intercambio iónico seguida de ósmosis inversa, con el fin de obtener la calidad del
agua requerida por los generadores de vapor. La planta de tratamiento de agua estará
diseñada para una producción neta continua de 200 m3/h.
2. OBJETIVO
El objetivo de este documento es presentar los cálculos estructurales de las
fundaciones para los skids: 02, 03, 04, 07, 08, 09, 10, 12, 13, 14, 15, 16, 17 y 18,
pertenecientes al proyecto "INGENIERÍA DE LAS FACILIDADES PARA LA
INSTALACIÓN DE UNA (01) PLANTA DE TRATAMIENTO DE AGUA PARA LA
INYECCIÓN DE VAPOR AL CAMPO DE BACHAQUERO". El proyecto será
desarrollado de acuerdo con los códigos, normas y estándares tanto nacionales como
internacionales aplicables en nuestro país y aceptados por la Empresa Mixta
PETROZAMORA S.A. Los criterios presentados constituyen los requerimientos
mínimos, sin estar limitados a ellos, para desarrollar la Ingeniería de Detalle y podrán
ser complementados, ampliados o modificados.
3. ALCANCE
Éste documento tiene por alcance el diseño estructural de las fundaciones para los
skids: 02, 03, 04, 07, 08, 09, 10, 12, 13, 14, 15, 16, 17 y 18 (Ver anexos),
correspondiente a áreas más adelante especificadas, requeridos para la correcta
ejecución de proyectos de ingeniería de detalle.
4. DOCUMENTOS Y PLANOS DE REFERENCIA
A continuación se enlistan los documentos y planos que se utilizan como insumo para el
cálculo de las fundaciones:
EP11002YF-OIS-PIP-RE-000-002 EP11002YF
3d
Skid_02_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-024
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-043
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-064
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-181
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-339
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-122
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-297
EP11002YF-OIS-PIP-RE-000-002 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-316
EP11002YF-OIS-PIP-RE-000-003 EP11002YF
3d
Skid_03_3D (CANALETAS +TUBERIA)
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-025
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-044
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-065
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-182
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-340
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-123
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-298
EP11002YF-OIS-PIP-RE-000-003 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-317
EP11002YF-OIS-PIP-RE-000-004 EP11002YF
3d
Skid_04_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-026
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-045
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-066
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-183
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-341
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-124
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-299
EP11002YF-OIS-PIP-RE-000-004 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-318
EP11002YF-OIS-PIP-RE-000-007 EP11002YF
3d
Skid_07_3D (CANALETAS +TUBERIA)
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-046
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-067
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-184
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-342
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-125
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-300
EP11002YF-OIS-PIP-RE-000-007 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-319
EP11002YF-OIS-PIP-RE-000-008 EP11002YF
3d
Skid_08_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-047
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-068
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-185
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-343
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-126
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-301
EP11002YF-OIS-PIP-RE-000-008 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-320
EP11002YF-OIS-PIP-RE-000-009 EP11002YF
3d
Skid_09_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-048
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-069
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-186
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-344
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-127
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-302
EP11002YF-OIS-PIP-RE-000-009 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-321
EP11002YF-OIS-PIP-RE-000-010 EP11002YF
3d
Skid_10_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-049
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-070
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-187
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-345
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-128
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-303
EP11002YF-OIS-PIP-RE-000-010 EP11002YF-OIS-EQP-
Engineering pneumatic material take off
PIP-PO-025-LI-322
EP11002YF-OIS-PIP-RE-000-012 EP11002YF
3d
Skid_12_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Acceptable nozzle loads
PIP-PO-025-DW-031
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-050
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-071
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-188
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-346
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-129
EP11002YF-OIS-PIP-RE-000-012 EP11002YF-OIS-EQP-
Engineering electrical material take off
PIP-PO-025-LI-304
EP11002YF-OIS-PIP-RE-000-013 EP11002YF
3d
Skid_13_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-032
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-051
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-072
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Engineering earthing connection location
PIP-PO-025-DW-189
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-347
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-130
EP11002YF-OIS-PIP-RE-000-013 EP11002YF-OIS-EQP- Engineering electrical material take off
PIP-PO-025-LI-305 skid 13
EP11002YF-OIS-PIP-RE-000-014 EP11002YF
3d
Skid_014_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-033
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-052
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-073
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Earthing connection location
PIP-PO-025-DW-190
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-348
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-131
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Electrical material take off
PIP-PO-025-LI-306
EP11002YF-OIS-PIP-RE-000-014 EP11002YF-OIS-EQP-
Pneumatic material take off
PIP-PO-025-LI-325
EP11002YF-OIS-PIP-RE-000-015 EP11002YF
3d
Skid_15_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-034
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-053
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-074
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Earthing connection location
PIP-PO-025-DW-191
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-349
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-132
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Electrical material take off
PIP-PO-025-LI-307
EP11002YF-OIS-PIP-RE-000-015 EP11002YF-OIS-EQP-
Pneumatic material take off
PIP-PO-025-LI-326
EP11002YF-OIS-PIP-RE-000-016 EP11002YF
3d
Skid_016_3D (CANALETAS +TUBERIA)
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Acceptable nozzles loads
PIP-PO-025-CN-035
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Supports positioning
PIP-PO-025-DW-054
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Isometric drawings for manufacturing
PIP-PO-025-DW-075
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Earthing connection location
PIP-PO-025-DW-192
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Structural drawings
PIP-PO-025-DW-350
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Forging material take off
PIP-PO-025-LI-133
Número de documento Descripción
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Electrical material take off
PIP-PO-025-LI-308
EP11002YF-OIS-PIP-RE-000-016 EP11002YF-OIS-EQP-
Pneumatic material take off
PIP-PO-025-LI-327
EP11002YF-OIS-PIP-RE-000-017 Documentation for skid 17
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Calculation notes
NON-009-003
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Design of anchor bolts
NON-009-004
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Nameplate drawing
NON-009-007
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Acceptable nozzles loads
NON-009-008
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Data sheets
NON-009-009
EP11002YF-OIS-PIP-RE-000-017 EP11002YF-OIS-EQP-
Earthing connection location
NON-009-011
EP11002YF-OIS-PIP-RE-000-018 Documentation for skid 18
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Calculation notes
NON-009-003
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Design of anchor bolts
NON-009-004
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Nameplate drawing
NON-009-007
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Acceptable nozzles loads
NON-009-008
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Data sheets
NON-009-009
EP11002YF-OIS-PIP-RE-000-018 EP11002YF-OIS-EQP-
Earthing connection location
NON-009-011
Normas COVENIN:
Normas Internacionales:
Requisito de reglamento para concreto estructural y
ACI 318-14
comentario.
COORDENADAS
NÚMERO TAG DEL Sistema UTM, DATUM SIRGAS
DESIGNATION PUNTO REGVEN, HUSO 19
DEL SKID EQUIPO
NORTE (m) ESTE (m)
P1 1.109.488,70 265.274,01
SKID 02 V-X101/A HORIZONTAL SAND FILTERS
P2 1.109.485,40 265.270,74
P1 1.109.491,98 265.279,73
SKID 03 V-X101/B HORIZONTAL SAND FILTERS
P2 1.109.486,82 265.276,47
P1 1.109.495,26 265.285,46
SKID 04 V-X101/C HORIZONTAL SAND FILTERS
P2 1.109.490,10 265.282,20
P1 1.109.482,85 265.271,70
SKID 07 V-X102/A SOFTENERS
P2 1.109.478,01 265.268,30
P1 1.109.486,13 265.277,42
SKID 08 V-X102/B SOFTENERS
P2 1.109.481,19 265.274,03
P1 1.109.489,41 265.283,15
SKID 09 V-X102/C SOFTENERS
P2 1.109.484,47 265.279,76
P1 1.109.492,69 265.288,88
SKID 10 V-X102/D SOFTENERS
P2 1.109.487,75 265.285,48
SKID 12 P-X103A/B RO LP FEED PUMPS P1 1.109.482,15 265.298,73
P2 1.109.476,22 265.298,43
SOFTNER REGENARATIONS P1 1.109.483,64 265.302,14
SKID 13 P-X105A/B
PUMPS P2 1.109.478,11 265.301,73
P1 1.109.480,15 265.295,40
SKID 14 S-X102 A/B RO CARTRIDGE FILTERS
P2 1.109.474,28 265.294,91
P1 1.109.478,81 265.291,45
SKID 15 P-X106A/B RO HD FEED PUMPS
P2 1.109.472,19 265.291,26
P1 1.109.457,31 265.293,11
SKID 16 P-X108A/B RO FLUSHING PUMPS
P2 1.109.450,74 265.290,72
REVERSE OSMOSIS P1 1.109.471,76 265.282,10
SKID 17 V-X103A/B
PRESSURE VESSEL P2 1.109.461,97 265.273,88
REVERSE OSMOSIS P1 1.109.465,10 265.285,92
SKID 18 V-X104A/B
PRESSURE VESSEL P2 1.109.455,32 265.277,70
ACERO DE REFUERZO
Perno hilti tipo varilla roscada HAS Acero Inox. ASTM F593
Descripción Valor
Zona Sísmica 3
Factor de corrección 0,9
Coeficiente de Aceleración Horizontal (Ao) 0,14
Para determinar si la fundación que contiene una o más bombas, será calculada
mediante el método estático, se debe cumplir con las siguientes condiciones:
Las Bombas Centrífugas, deben tener una potencia menor a 500 HP y Bombas
de Tornillo o Reciprocantes deben tener una potencia menor a 100 HP. PDVSA
0602.1.414.
Ser bombas y/o equipos con bajas vibraciones y pesos menores a las 5000 lb.
Norma ACI-351.
CARGAS PERMANENTES:
Para el cálculo de las magnitudes de las cargas permanentes asociadas al peso propio
de las estructuras, se utilizan los siguientes pesos unitarios:
o Concreto Armado: 2.500 kg/m³.
o Acero al Carbono: 7.850 kg/m³.
Se toman en cuenta los siguientes pesos para el cálculo de la fundación:
o Peso de tuberías.
o Peso de soportes de tuberías.
o Peso de material eléctrico.
o Peso del skid.
o Peso de las bombas o equipos (si aplica).
Los pesos de los equipos a instalar deben ser confirmados por las diferentes disciplinas
involucradas en el diseño, una vez seleccionado el fabricante de cada uno de los
equipos.
El ancho del skid mas dos veces la separación entre el C.L. del perno
y el borde del bloque de fundación mas dos veces separación entre el
C.L. del perno y la cara externa del perfil.
El ancho recomendado por ingeniería básica.
o La longitud del bloque de fundación es el valor mayor entre:
La longitud del skid más dos veces el recubrimiento
El largo del skid mas dos veces la separación entre el C.L. del perno y
el borde del bloque de fundación mas dos veces separación entre el
C.L. del perno y la cara externa del perfil.
La longitud recomendada por ingeniería básica.
Mx = Fy * ( Hcg + Hf )
Donde:
Hcg: Altura en Z del centro de gravedad del conjunto, respecto a la base del skid.
Hf: espesor de la fundación.
13. CHEQUEOS
CHEQUEO DE LA EXCENTRICIDAD DEL CONJUNTO Y LA FUNDACIÓN
El conjunto está compuesto por el skid, las bombas, las tuberías, los soportes y el
material eléctrico.
Para el cálculo de la excentricidad del conjunto y la fundación se requiere calcular el
centro de gravedad del conjunto y el del bloque de fundación que ya ha sido
predimensionado.
o Cálculo del centro de gravedad del conjunto:
Primero debe ubicarse en planta el peso de cada uno de los componentes del
conjunto (Wi) y su coordenada en los ejes Xi y Yi, con respecto a los ejes
establecidos. Para luego aplicar la ecuación de momento estático de primer orden
en el punto (0,0,0) que corresponde al centro de gravedad de la fundación y
obtener las coordenadas X y Y del punto de aplicación del peso total del conjunto.
CGx= Σ Xi*Wi CGy= Σ Yi*Wi
ΣW ΣW
o Cálculo del centro de gravedad del bloque de fundación:
El centro de gravedad del bloque fundación, se obtiene dividiendo cada una de
las dimensiones entre 2. A efectos del cálculo de la excentricidad del conjunto y la
fundación, éste será el punto (0,0,0). Es en éste punto donde se aplica la carga
correspondiente al peso de la fundación.
La excentricidad serán las coordenadas X y Y del centro de gravedad donde es
aplicada la carga total (Peso del conjunto + peso de fundación), el cual es determinado
aplicando la ecuación de momento estático de primer orden en el punto (0,0,0).
Ex= Σ Xi*Wi Ey= Σ Yi*Wi
ΣW ΣW
Para que la fundación sea totalmente efectiva y no exista esfuerzos de tracción en el
suelo, se debe cumplir que las excentricidades: Ex < A/6 y Ey < L/6, siendo A y L las
Σ Me / Σ Mv > F.S.
Donde:
Σ Me = Sumatoria de momentos resistentes.
ANEXO 1
DOCUMENTOS Y CÁLCULOS DEL SKID 2
ANEXO 2
DOCUMENTOS Y CÁLCULOS DEL SKID 3
ANEXO 3
DOCUMENTOS Y CÁLCULOS DEL SKID 4
ANEXO 4
DOCUMENTOS Y CÁLCULOS DEL SKID 7
ANEXO 5
DOCUMENTOS Y CÁLCULOS DEL SKID 8
ANEXO 6
DOCUMENTOS Y CÁLCULOS DEL SKID 9
ANEXO 7
DOCUMENTOS Y CÁLCULOS DEL SKID 10
ANEXO 8
DOCUMENTOS Y CÁLCULOS DEL SKID 12
ANEXO 9
DOCUMENTOS Y CÁLCULOS DEL SKID 13
ANEXO 10
DOCUMENTOS Y CÁLCULOS DEL SKID 14
ANEXO 11
DOCUMENTOS Y CÁLCULOS DEL SKID 15
ANEXO 12
DOCUMENTOS Y CÁLCULOS DEL SKID 16
ANEXO 13
DOCUMENTOS Y CÁLCULOS DEL SKID 17-18
ANEXO 14
REVISIÓN PERNOS DE ANCLAJE